Loading...
HomeMy WebLinkAbout81.74 - Sewage Disposal System Design (Copy 2)SOIL TEST PIT DATA: TEST PIT #1- TEST PIT -#2- GRD. EL. 105.10 GRD. EL. 104.0 ADJ. HIGH GW. 96.60 ADJ. HIGH GW. A LOAMY 5 ND 1OYR 3/4 LOAMY SAND 2.5Y 5/6 EL = 104.7 MEDIUM SAND 1OYR 5/6 EL = 96.6 SILT 2.5Y 6/3 MEDIUM SAND 1OYR 6/4 NO G.WATER EL = 95.1 120" 7- 23" 102" 106" MEDIUM SAND 10YR 6/6 NO G.WATER FL = 97.0 MAY 19, 2004 HIGH GROUNDWATER COMPUTATION (BASED ON TP#1) DATE: 0" DEPTH TO BOTTOM OF HOLE 10.0 INDEX WELL MIW-29 WATER LEVEL RANGE ZONE A CURRENT DEPTHOINDEX WELL(5/04) 8.0 WATER LEVEL ADJUSTMENT 1.5 DEPTH TO ADJUSTED HIGH WATER 8.5 4" DATE: DATE: 5/19/04 5/19/04 TEST BY- TEST BY - THE BSC GROUP, INC. THE BSC GROUP. INC. WITNESSED BY. WITNESSED BY - AMY VON HONE AMY VON HONE PERC. RATE: PERC. RATE: 2 MIN./INCH _2_MIN./INCH SOIL EVALUATOR SOIL EVALUATOR CRAIG FIELD CRAIG FIELD SOIL CLASS: SOIL CLASS: 4" INVERT AT BEGINNING 1n L.T.A.R. L.T.A.R. 0.74 G.P.D./SQ.FT. 0.74 G.P.D./SQ.FT. DATUM: <5 X OF No. 4 SIEVE SHALL VERTICAL DATUM: ASSUMED BENCH MARK SET: TOP OF CONCRETE BOUND 3. FIRST TWO FEET OF PIPE OUT' OF DIST. ELEVATION 106.37 PROFILE: NOT TO SCALE INDICATES _L ESTIMATED SEASONAL HIGH GROUND WATER INDICATES N_ OBSERVED GROUND WATER INDICATES PERC. TEST ❑INDICATES UNSUITABLE MATERIAL SEPTIC TANK DETAIL: 1,500 GALLON NOT TO SCALE NOTES: 1. SEPTIC TANK SHALL BE STEEL 5. INLET AND OUTLET TEES TO BE CAST IRON, REINFORCED CONCRETE. SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE. 2 SEPTIC TANK TO WITHSTAND H-10 LOADING TEES TO BE CENTERED UNDER MANHOLE COVER. UNLESS UNDER PAVEMENT, DRIVES OR TRAVELED WAYS, WHEREIN H-20 LOADING SHALL APPLY. 3. ALL PIPE CONNECTIONS AND CONCRETE CONSTRUCTION SHALL BE WATERTIGHT. 2-24" DIA CONCRETE MANHOLES W METAL HANDLES BROUGHT 4. FILL ALL UNUSED KNOCKOUTS WITH T 6" OF FINISH GRADE MORTAR. TEE TO BE UNDER I 5. FILL ALL UNUSED KNOCKOUTS WITH MORTAR. PRECAST 1/2" (D II BOTTOM ON LEVEL STABLE BASE b 6L43 - la 6" MIN. 3/4' TO do 7 1/2 1 1/2" STONE CROSS-SECTION VIEW PLAN VIEW / I i CRAIG A. i \ BENCHMARK SET f FIELD w \ 1 No.38039 TOP`,, OF CONCRETE �\ A I R UUA Y ROAD BOUND. ASSUMEDON v\ v ►�����t� LAO ! \ \ \ (40 MADE PRIVATE ROAD) J/�\ I \�// M.H. OPENING COVER MIN. 4" INVERT AT BUILDING 104.75 0 1 NOTES: 10'-6' RAISE M.H W�ml SEWER BRICK e . e,i :: • . 10'-0' T � DAM" 8: MORTAR 4" INVERT AT DIST. BOX (OUT) 103.93 TRAVELED WAYS WHEREIN H-20 LOADING T 15" SHALL APPLY. R-40 4" INVERT AT BEGINNING 1n 2. PROVIDE INLET TEE OR BAFFLE WHERE OF LEACHING TRENCH NORMAL WATER LEVEL 12" G BREAKOUT 104.3 SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR <5 X OF No. 4 SIEVE SHALL PASS No. 200 IN PUMPED SYSTEM. 103.70 < 3. FIRST TWO FEET OF PIPE OUT' OF DIST. 3" 6' MIN. 3/4" TO BOX TO BE LAID LEVEL SEPTIC TANK 1/2" CRUSHED 4. ALL PIPE CONNECTIONS AND' CONCRETE STOONE BASE CONSTRUCTION SHALL BE WATERTIGHT. I a 10" THEIR ACCURACY OR THAT ALL 14" MINIMUM LOT SIZE: 40,000± S.F. I \ 36.6' LOCATION AND INVERTS OF UTILITIES EXIST. TOTAL LOT AREA: 12,236± S.F. e- INLET TEE �� � OVERLAY DISTRICT: NONE J 1500 GALLOM 5'-2" 4'-B" ' 4'-0" MIN. SEPTIC TANK \ - so�.Ero a� - SEWAGE DISPOSAL SYSTEM \- ? =' LIQUID DEPTH MASSACHUSETTS ass �� (15 MIN) PREPARED FOR: Mr. CHRIS JOHNSON 14 HINKLEY POND ROAD DENNIS, MA '.' pCT il� 02660 FEMA FLOOD DATE: AUGUST 3, 2004 COMP. DESIGN: K. HEALY CHECK: D. CRISPIN DRAWN: P. HAGIST FIELD: D. GAZZOLO / E. KEATING ZONE DISTRICT: 86 ATED /0004 SHEET 1 OF 1 ;i I DISTRIBUTION BOX DETAIL: NOT TO SCALL` FINISHED GRADE REMOVABLE COVER 6" 5,5' OUTLETS 30TTOM ON LEVEL STABLE BASE CROSS-SECTION FOUNDATION FIRST PIPE LENGTH CONCRETE COVERS TO WITHIN TO BE SET LEVEL 106.50 6" OF FINISHED GRADE. FOR MIN. 2' - FINISH WADE EL=107.4-105.8 4' PVC (PERF) r - 2"-1 8"-3 8" DOUBLE WASHED STONE 4" P 3/4"-1 1/2" DOUBLE WASHED STONE I=D :C I -E I=G Z p IH .c 5 OUTLET I -F SEPTIC TANK DIST. BOX o '� BOTTOM EL= J In in WATER EL=K INVERT ELEVATIONS: TOP OF FOUNDATION 110.0 NO. OF OUTLETS 5 4" INVERT AT BUILDING 104.75 o r'1 --- Y WALLS NOTES: 1 4" INVERT AT SEPTIC TANK (OUT) 1. DIST. BOX TO WITHSTAND H-10 LOADING D 2- T � DAM" UNLESS UNDER PAVEMENT, DRIVES OR 4" INVERT AT DIST. BOX (OUT) 103.93 TRAVELED WAYS WHEREIN H-20 LOADING T 15" SHALL APPLY. R-40 4" INVERT AT BEGINNING 1n 2. PROVIDE INLET TEE OR BAFFLE WHERE OF LEACHING TRENCH j- G BREAKOUT 104.3 SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR <5 X OF No. 4 SIEVE SHALL PASS No. 200 IN PUMPED SYSTEM. 103.70 L_ 2' 3. FIRST TWO FEET OF PIPE OUT' OF DIST. ELEVATION AT BOTTOM 6' MIN. 3/4" TO BOX TO BE LAID LEVEL 1 1/2" CRUSHED 4. ALL PIPE CONNECTIONS AND' CONCRETE STOONE BASE CONSTRUCTION SHALL BE WATERTIGHT. I FOUNDATION FIRST PIPE LENGTH CONCRETE COVERS TO WITHIN TO BE SET LEVEL 106.50 6" OF FINISHED GRADE. FOR MIN. 2' - FINISH WADE EL=107.4-105.8 4' PVC (PERF) r - 2"-1 8"-3 8" DOUBLE WASHED STONE 4" P 3/4"-1 1/2" DOUBLE WASHED STONE I=D :C I -E I=G Z p IH .c 5 OUTLET I -F SEPTIC TANK DIST. BOX o '� BOTTOM EL= J In in WATER EL=K INVERT ELEVATIONS: TOP OF FOUNDATION 110.0 A 4" INVERT AT BUILDING 104.75 o r'1 4" INVERT AT SEPTIC TANK (IN) 104.45 C 4" INVERT AT SEPTIC TANK (OUT) 104.20 D 4" INVERT AT DIST. BOX (IN) 104.10 E 4" INVERT AT DIST. BOX (OUT) 103.93 F \ �\ INVERTS AT LEACHING FACILITY: ZONING DISTRICT: R-40 4" INVERT AT BEGINNING 1n \ / OF LEACHING TRENCH 103.87 G BREAKOUT 104.3 4 INVERT AT END <5 X OF No. 4 SIEVE SHALL PASS No. 200 OF LEACHING TRENCH 103.70 H IN THE DRAWINGS ARE APPROXIMATE. ELEVATION AT BOTTOM SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- OF LEACHING TRENCH 101.70 J EXISTING UTILITY SYSTEM IN SERVICE. ADJUSTED GROUNDWATER 96.6 K BOTTOM OF HOLE 95.1 THEIR ACCURACY OR THAT ALL VARIANCES REQUESTED: NONE PLAN VIEW 30 PRECAST DIST. BOX LEACHING TRENCH DETAIL: NOT TO SCALE 36' MAX .COVER FINISHED GRADE LOAM do SEED DISTURBED AREAS 7,_�j 1Tl777=P� CAP ENDS , 4" PVC'' • •�•-�4'pB2F 4IIq. o°��aVCO.OQ '''r}r}r} �+ III EFFECTIVE 39" a • a • a • e • • a • • • • a • �a • e • '� pb",�a • e e \ LEVEL BOTTOM 34' / 2% MIN. FINISH GRADE TYP 2' I TYP 21 1 2' CROSS-SECTION 36' MAX. - 12" MIN. COVER /- 4" MIN. LOAM & SEED 2" MIN. OF 1/8' TO 1/2" WASHED STONE TO 1-1/2" DOUBLE ED STONE (NO FINES) HIGH POINT\t(1 DESIGN CRITERIA: ROAD ELEV. iQ7.6 (DESIGN FLOW: \ 4 BEDROOMS AT110G.P.B./D 440 G.P.D. REQUIRED SEPTIC TANK: 440 X 200% = 880 GAL. SEPTIC TANK PROVIDED: = 1500 GAL. 8(JI ef SIZE OF LEACHING FACILITY REQUIRED: l - T DESIGN PERC. RATE: <2 MIN./ INCH 107.4 X�� �+w----_OHW OHw 74.97' N57'55'30"W\\ //---- LONG TERM APPL. RATE 0,74 G.P.D/S.F. 106.5 ���� \� --��� 440 GPD + 0,74 GPD/SF = 596 S.F. TPIT#1 \\ �� 10,'1 M \�= \ 'ori EXCAVATION LIMITS OF SIZE OF LEACHING FACILITY PROVIDED: rl:'os �______ ___-__ _ == _ - - 20POSED I o ------- . \�� 3 ,0' I j 19' 5EA D06 S - 34' L❑NG TRENCH )IL ABSORBTION Z. ' _ : = I \ I 1 - 3-2 WIDE,, 2 DEEP, ____ -J (STEM ---, \ - I 3 1 _ 3x(2'+2'+21)x34' = 612 S.F. D"BOX \ _____ OF LEACHING AREA ��•� \ 34. TPIT#2 RESER PROPOSED I \ I I (10'M - 612 x 0,74 GPD / SF = 452 GPD I \ y!_ _----- ---- -'1 a (BITUMINOUS \� I I vi r 1 I PROVIDED I I -� DRIVEWAY LIMITS OF _. _ - EXCAVATION - \- _" .' .. - - - _ \ SEE NOTES I - ---1 �- 108.4 I a 5AND 6 � \\ �.5. SI' \0.0' Ia. I I \ 15ROPOSED 00 GAL L� 1D I I i X F-� i LOCUS INFORMATION / I o \\ SEP. TANK � \ I � I I I I o o PROPOSED I i t I I CURRENT OWNER: CHRIS JOHNSON T.O.S. 108.5 o r --I I o 0 0 of inl I Do I I I TITLE REFERENCE: DEED BOOK 17808, PAGE 132 r 0I 01. zw, DAVID J. CRISPIN CIVIL No.32112 UMITS OF EXCAVATION SEE NOTES - 5 AND 6 (o I PROPOSED LEACH. C.B. RIM 101.5 - 8' DIA. 4' DEEP PLAN VIEW ; SCALE: 1' = 10 FEET wommmmill I 0 5 10 20 FTI 1 M 1 N 0 1 i+ PROPOSED w GRAVEL M ��• DRIVEWAY N \ o \ 36.0' u / ti / / / / 11\ 1 1 0 I 11 PROPOSED BASEMENT GARAGE T.O.S. 102.4 TiI o 0 1 / / / \ 91.82' \ S56.43'20"E \ 1 \\ I \ I \\ I SLAB FULL BSMT PROPOSED 4 BEDROOM DWELLING T.O.F. 110.0 I I 20.7' 107.0 1 106.01 I 3 \ (o LTJ I I I PLAN REFERENCE: PLAN BOOK 89, PAGE 89 o r'1 \ I 10 -��---i:ri o ASSESSORS MAP: PARCEL: 81 X72- 3. ALL PIPES LOCATED UNDER PAVEMENT I o \ "D"BOX-- D LOCATED WITHIN 150 FT. OF THE BASS RIVER 3 M \ �\ a ZONING DISTRICT: R-40 OR OTHER CLEAN GRANULAR SOILS 1n \ / TPIT 1 �� # i SETBACKS: FRONT 30' PASS No. 100 <5 X OF No. 4 SIEVE SHALL PASS No. 200 UNIFORMITY COEFFICIENT O No. 4 SIEVE </=6.0 SIDE 20' (6' PER BLD.INSP.) IN THE DRAWINGS ARE APPROXIMATE. ViO� SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- REAR I o EXISTING UTILITY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL 1-888-344-7233. THE p THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES MINIMUM LOT SIZE: 40,000± S.F. I \ 36.6' LOCATION AND INVERTS OF UTILITIES EXIST. TOTAL LOT AREA: 12,236± S.F. PROPOSED �� � OVERLAY DISTRICT: NONE I 1500 GALLOM C'0' :. JDS A. 657 Main Street, (RT. 28) Unit 6 W. Yarmouth Massachusetts SEPTIC TANK \ - 16.5' �� NITROGEN SENSITIVE SEWAGE DISPOSAL SYSTEM \- #15 ZONE: NOT A ZONE It MASSACHUSETTS \ (15 MIN) PREPARED FOR: Mr. CHRIS JOHNSON 14 HINKLEY POND ROAD DENNIS, MA '.' pCT il� 02660 FEMA FLOOD DATE: AUGUST 3, 2004 COMP. DESIGN: K. HEALY CHECK: D. CRISPIN DRAWN: P. HAGIST FIELD: D. GAZZOLO / E. KEATING ZONE DISTRICT: 86 ATED /0004 SHEET 1 OF 1 JOB N0.4-8588.01 PANEDL # 250014 C \\ o I I LOCUS PLAN: NO SCALE En Ld \ I \ 10 X I \ (k"J N 10 I EXISTING CESSPOOLS T ROAD PUMPED, LLED AN[NIGHBA4K S a ABANDONED INBE I I ACCORDANCE WITH TITL N RIDIE 0D ASSESSOR -MAP 81 PARCEL 7 121236± S.F. N57055'30"W 8.18'11, CBDH FOUND AND HELD REVISIONS NO. DATE DESCRIPTION GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. D R� o 0 's F TRW A 3. ALL PIPES LOCATED UNDER PAVEMENT tj + D LOCATED WITHIN 150 FT. OF THE BASS RIVER 3 Z GOLF COURSE LOCUS a �, REVISIONS NO. DATE DESCRIPTION GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILJTY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL, SUBSOIL AND OTHER IMPERVIOUS MATERIAL 6. REPLACE MATH CLEAN WASHED SAND OR OTHER CLEAN GRANULAR SOILS CONFORMING TO THE FOLLOWING SIEVE ANALYSIS: 10% (MAX) BY WT. SHALL PASS No. 50 SIEVE <10 % OF No. 4 SIEVE SHALL PASS No. 100 <5 X OF No. 4 SIEVE SHALL PASS No. 200 UNIFORMITY COEFFICIENT O No. 4 SIEVE </=6.0 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, LOCATION AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 8. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FACILITY. :. JDS A. 657 Main Street, (RT. 28) Unit 6 W. Yarmouth Massachusetts 02673 508 778 8919 PROJECT TITLE: SEWAGE DISPOSAL SYSTEM DESIGN #15 FAIRWAY ROAD So. YARMOUTH MASSACHUSETTS / qt PREPARED FOR: Mr. CHRIS JOHNSON 14 HINKLEY POND ROAD DENNIS, MA '.' pCT il� 02660 (508) 259-7269 DATE: AUGUST 3, 2004 COMP. DESIGN: K. HEALY CHECK: D. CRISPIN DRAWN: P. HAGIST FIELD: D. GAZZOLO / E. KEATING FILE NO. 8588SEP1.DWG DWG NO. 5472-03 SHEET 1 OF 1 JOB N0.4-8588.01