Loading...
HomeMy WebLinkAbout81.73 - Floor Plans, Elevations and Framing PlansI GENERAL N OTES: 1. CONTRACTOR SHALT_ FIELD VERIFY ALL EXISTING DIMENSIONS, LOCATIONS, AND CONDITIONS INDICATED OR IMPLIED ON THE CONTRACT DOCUMENTS AND SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES, OMISSIONS, AND/OR CONFLICTS BEFORE COMMENCING ANY WORK:'I 2. CONTRACTOR MUST COMPLY WITH RULES AND REGULATIONS OF AGENCIES HAVING JURISDICTION AND SHALL CONFORM TO ALL CITY, COUNTY, STATE, AND FEDERAL CONSTRUCTION, SAFETY AND SANITARY LAWS, CODES, STATUTES, AND ORDINANCES. ALL FEES, TAXES, PERMITS, APPLICATIONS, I AND CERTIFICATES OF INSPECTION, AND THE FILING OF ALL WORK WITH GOVERNMENTAL AGENCIES I SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL AND MAINTAIN INSURANCE FOR THE PROTECTION OF EMPLOYEES, THE WORK AND THE PUBLIC. 3. UPON COMPLETION OF WORK, THE CONTRACTOR SHALL WALK THROUGH WITH AN OWNERS REPRESENTATIVE AND COMPILE A "PUNCH LIST" OF CORRECTIONS AND UNSATISFACTORY AND/OR INCOMPLETE WORK. FINAL PAYMENT WILL BE CONTINGENT ON THE COMPLETION. OF THESE ITEMS. 4. ALL WORK SHALL BE PERFORMED BY SKILLED AND QUALIFIED WORKMEN IN ACCORDANCE WITH THE BEST PRACTICES OF THE TRADES INVOLVED, AND IN COMPLIANCE WITH BUILDING REGULATIONS AND/OR GOVERNMENTAL LAMS, STATUTES, OR ORDINANCES CONCERNING THE USE Of UNION LABOR. 5. EACH TRADE WILL PROCEED IN A FASHION THAT WILL NOT DELAY THE TRADES FOLLOWING THEM 4 6. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISTRIBUTION OF DRAWINGS TO ALL TRADES kl UNDER HIS JURISDICTION. 7. ALL NEW WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE, TRUE AND IN PROPER ALIGNMENT AS NECESSARY. 8. ALL MATERIALS SHALL BE NEW, UNUSED, AND OF THE HIGHEST QUALITY IN EVERY RESPECT, UNLESS OTHERWISE NOTED AND SHALL BE CONSISTENT WITH THE SPECIFICATIONS FOR THIS PROJECT. MANUFACTURED MATERIALS AND EQUIPMENT SHALL BE INSTALl,ED AND FINISHED PER I MANUFACTURERS RECOMMENDATIONS, DETAILS, AND INSTRUCTIONS. 9_.. WHERE A MANUFACTURER IS INDICATED, THERE SHALL BE NO SUBSTITUTLQN OF "EQUIVALENT" OR" "EQUAL" MATERIALS WITHOUT WRITTEN APPROVAL FROM THE ARCHITECT. SUCH EQUALITY SHALL BE DETERMINED BY REVIEW OF COMPREHENSIVE INFORMATION SUBMITTED BY THE CONTRACTOR. 10. ALL WORK AND MATERIALS SHALL BE GUARANTEED AGAINST DEFECTS FOR A PERIOD OF ONE (1) YEAR FROM APPROVAL FOR FINAL PAYMENT. 11, CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL CUTTING AND PATCHING REQUIRED TO ENSURE THAT THE COMPLETED WORK IS FULLY IN ACCORDANCE WITH THE FINAL DESIGN. 12. CONTRACTOR SHALL AT ALL TIMES KEEP THE PREMISES FREE OF ACCUMULATION OF WASTE MATERIALS OR RUBBISH. PREMISES TO BE SWEPT CLEAN DAILY OF RELATED CONSTRUCTION DEBRIS. AT THE COMPLETION OF THE WORK, LEAVE THE JOB SITE FREE OF ATI_ MATERIALS AND BROOM CLEAN. 13. DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. LARGER SCALE DRAWINGS SHALL GOVERN OVER SMALLER SCALE DRAWINGS. THE THERMAL PERFORMANCE CRITERIA EXPRESSED ON THE ENERGY COMPLIANCE REPORT SHALL TAKE PRECEDENCE OVER ALL OTHER DOCUMENTATION OR DRAWINGS, 14. PRIOR TO INSTALLATION OF ANY FLOORING OR CARPETING, CONTRACTOR SHALL VERIFY OR PATCH THE SURFACE AS REQUIRED TO ENSURE THAT THE FLOOR SURFACE IS FULLY LEVEL AND TRUE. 15. ANY CHANGE WHICH RESULTS IN EXTRA COST SHALL NOT PROCEED WITHOUT WRITTEN AUTHORIZATION FROM THE OWNERS REPRESENTATIVE AND THE ARCHITECT. ,. 16. INSPECTION BY THE ARCHITECT OR ANY REPRESENTATIVE THEREOF SHALL IN NO WAY RELIEVE THE CONTRACTOR FROM FURNISHING SATISFACTORY. MATERIALS AND WORKMANSHIP OR FROM COMPLETING ALL WORK INDICATED OR IMPLIED BY ANY OR ALL OF THE CONTRACT DOCUMENTS 17, ALL EXISTING CONDITIONS, SURFACES, AND EQUIPMENT WHICH ARE DISTURBED IN ANY WAY DURING CONSTRUCTION SHALL BE PATCHED, REPAIRED, OR REPLACED TO MATCH THE EXISTINQ CONDITIONS. BEAM 1= (3) 1-4" x 9 2"TRUS-JOIST 1.9E MICROLAM LVL BEAM 2= (1) 1-4" x 14"TRUS-JOIST 1.9E MICROL`AM LVL POSTS = MIN. (4) 2x6. TYP., ' EXTEND TO EXIST. FOOTINGS FIELD VERIFY LOCATIONS AND _PROVIDE FOOTING IF REQUIRED ADJACENT TO FIREPLACE NOTE: CONTRACTOR TO COORDINATE WINDOW SIZES AND STYLES w/ EXISTING R rs C9 ,u. FEB 2 0 ZQCs4 �' 4 ' I T BUILDING DEP..�--- - I BY -- I I SIDE ELEVATION 3/16=1'_0,, i I I� I I I ( � 1 2x1 O 6• /c r O I I I I I I � � Tv�1 V 1 _rl r 'i C—of Q = I I w I I I EA 1 EA BEM FA. 1 I oO N N v I N 4 N I CHIMNEY CHIMNEY w I 2x1 O 6• C /c SKY LITE N N O> 00 I 00 I o I r— o � o a X , ROOF FRAMING 3/16"=1'-0" F AJ I EXISTING ONE-STORY TO REMAIN ,o 0 a � JJ G. U •\O x�14 f `^ 6'-1" 10•-p., ,6' 3". ®15,7- p.. a N 0 I N I � . a I I I I o I CIS 0 I - C SECOND FLOOR PLAN fT_ I I ( � 1 w o r O I I I I � � Tv�1 V 1 _rl r 'i C—of Q = w I I I EA 1 BEM FA. 1 I I CHIMNEY w I. I N N O> 00 I 00 I o I r— o � o a X Cj N I"'I 1 I I/C 20 O I (2) 2X10 (2) 2X10 STAIRS ,FLOOR FRAMING „ ,„ 3/16„_1,_0„ 3/16=1_0 iI $ t D Roo w1 I�1 13 ED Qoovk � 11'-1• 1%fInlb TZoor-, k —71 --- --- , , Dt ttttntb Ricf✓ g DtNIA")1. FIRST FLOOR PLAN 3/16"=1'-0 EXISTING ONE-STORY WITH . NEW SECOND FLOOR ABOVE REMAIN W Cd Drawn By Checked By: EFC Date: 2-1904 Revisions: PHOTO-ELECT%IC TYPE SIVIOIS=® DETECTORSARE REQUIRED B's IVIASS. STATE BLDG. CODE INSID AND OUTSIDE OF ALL BEDROOM Scale: as.poted WITHIN 20' OF A KITCHEN OR BA HL rr CT 14 AyF= L �J - - BATTERY BACK-UP. - - FILE COPS' — — — — — — — — — — — — — — — — — — — — — — — — — --_-- ----------------- TOWN OF`dAR t3UTE-6 REVIEWED FOR BUILDING AND ZONIt G CODE COHPLI- ANCE, ERRORS OR OMMISSIONS DC NOT RELIEVE THE APPLICANT FROM THE RESPONSIPONSIBILIL ' 1111' COMPLIANCE. Floor Plans Elevations DATE: 3^/� �� and Framing plans FL_ BUILDING OFFICIAL ; I I Al; FRONT ELEVATION., 3/16"=1,_0„ I , w o r O Tv�1 V 1 _rl r 'i C—of Q = w CD Ld w 0 N N O> 00 I 00 I I r— o � o a X W Cd Drawn By Checked By: EFC Date: 2-1904 Revisions: PHOTO-ELECT%IC TYPE SIVIOIS=® DETECTORSARE REQUIRED B's IVIASS. STATE BLDG. CODE INSID AND OUTSIDE OF ALL BEDROOM Scale: as.poted WITHIN 20' OF A KITCHEN OR BA HL rr CT 14 AyF= L �J - - BATTERY BACK-UP. - - FILE COPS' — — — — — — — — — — — — — — — — — — — — — — — — — --_-- ----------------- TOWN OF`dAR t3UTE-6 REVIEWED FOR BUILDING AND ZONIt G CODE COHPLI- ANCE, ERRORS OR OMMISSIONS DC NOT RELIEVE THE APPLICANT FROM THE RESPONSIPONSIBILIL ' 1111' COMPLIANCE. Floor Plans Elevations DATE: 3^/� �� and Framing plans FL_ BUILDING OFFICIAL ; I I Al; FRONT ELEVATION., 3/16"=1,_0„ I ,