HomeMy WebLinkAbout125.23 - Proposed Septic Design (2)TOP OF FOUNDATION
COLOR
20 FT. MINIMUM FROM CELLAR
1G1.G0
ELEV. = -----
10 FT. MINIMUM
1C FT. MINIMUM FROM SLAB OR CRAWL SPACE
CLEAN SAND
10YR5/6
4. ANY MASONRY UNITSUSED TO BRING COVERS TO GRADE SHALL
18-.48 Cl' FINE/MED. SAND
'CONCRETE
'
78- 1 C2 FILL LAYER
BE; MORTARED IN PLACE:
TADCO ENVIRONMENTAL CONSULTANTS
26 (COMPASS LANE, DENNIS, MA 02638
(508) 385-2425
COVERS
4". SCHEDULE 40 PVC PIPE
LOAM AND SEED
COBBLE
5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH
MIN. PITCH 1/8" PER FT.
2" LAYER OF
9.00
REVISED ,j
I
1/8" TO 1/2
z
-LOCATION MAP
iWASHED
STONE
94.00 MAX.
VENT
\
4„ CAST IRON PIPE
\
i \
"
91.75 MIN.
NOT REQUIRED
SLAB ELEV. _
(OR EQUAL) MINIMUM
7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
SOIL \
\ \ \
SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION
-z
1TEST 2
_3,50 _
--
- PITCH 1/4" PER. FT.
LaiP\
�\
\ \
\
G eASV
IMMEDIATELY.
92:9
n� .
-. _
8. PARCEL IS IN :FLOOD ZONE 25 23
9. LOT IS SHOWN ON ASSESSORS MAP ------ AS PARCEL ------
\ \ :
`
10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR
A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED
cln
_
FLOW LINE
91.00
rn
r� cv
ELEV. = 92.00
------
_F 10"
�"�
o c
❑��❑OOO❑❑O�
o
a °�
n��{
J
IMIN.
LEV. 91.50 LEVEL
c o
C30000El000❑0
°
o
°
_
ELEV. - X9175
GAS
BAFFLE
6" SUMP _ 91.23
ELEV. _ 91L4Q_ ELEV. -:----
°
oo.00
171000 000000,
°
o�2'
L
o Q
�j
DISTRIBUTION
p ° o
-o
LIQUID
OUTLET
-
f®N -
ELEV. -
BOA _�4.2;f_
o o°
oD❑C}da❑❑OOf]
o o°
o _ 83.25 0 CD
ELEV. -
DEPTH
4 FEET
TEE
14 INCHES
(TO BE PLACED ON FIRM BASE) TO BE WATER TESTED
2 500 GALLON GALLEYS- WITH
STONE IN AN
-
5 FEET
19:INCHES
^ IF MORE THAN ONE OUTLET
1 500 GALLON
6 FEET
7 FEET
24 INCHES
29 INCHES
_
TO _BE PLACED ON FIRM BASE)
SEPTIC TANK (
13' X 25' X 2' TRENCH FORMATION
z
-
�
WELL NY A
.75 'ZONE
/
8 FEET
34 INCHES
3/4. TO _1 1/2.. CLEAN
A
SOIL ABSORPTION
INDEX
.-DOUBLE WASHED. STONE
ADJUST
I -
�+
FREE OF FINES "& SILT SYSTEM STEM SAS
.-
USGS PROBABLE"WATER TABLE ELEV. =
SEV�AGE DISPOSAL SYSTEM PRC9LE OBSERVED WATER TABLE ( / / ) ELEV. _ --- --
D
NOT TO SCALE BOTTOM OF TEST HOLE ELEV.
A x
R D -" _ __ - -- -
N
_ DATE OF SOIL TEST Da ---.
EP .. , 92.2
JOS -
SOIL TEST DONE BY.:IEf1,..D1JS�IAS_-___-_
DESIGN CALCULATIONS, VON
j
i WITNESSED BY -oA_HOrIE__-
_-' x
__ n - �' - - - -
MAP - . - � / L` 93.6
A
NUMBER OF BEDROOMS 3--ELEV.=_ 0..L_'
GARBAGE DISPOSAL UNIT DRQV/� IO HOLE 9
M - `ins-
PERCOLATION RATE<__� MIN:/INCH IN, C3 HORIZON
TOTAL` ESTIMATED FLOW
/
110 GAL/ER./DAY X j BR.) 330_ GAL /DAY
DEPTH
, HORIZ
TEXTURE ;
COLOR
MOTT:
OTHER
y
y / /
REQUIRED . SEPTIC TANK CAPACITY C60 GAL.
0-7
0/A
LOAMY SAND
10YR3/3
NO
ROOTS
/ i6 `15
x 87. /
ACTUAL SIZE OF SEPTIC TANK ..1�_ GAL. <
7-22
B
LOAMY. SAND :_:
10YR5/6
0
/
CLASSIFICATION
SOIL CLASSI -_ �--
DESIGN PERCOLATION RATE 5_- MIN./IN.
22-48,
Cl
FINE/MED. SAND
1,OYR6/8
\
EFFLUENT LOADING RATE • ,,Q,7 GAL./DAY/S.F. z
48:78
C2
TOP SOIL LAYER
10YR6/2
X98.6
LEACHING AREAlzoo SQ. FT.
78-132
C3 -
MED/COURSE SAND
10YR6/4
COBBLES
(13X25) + (38=2) -
i
LEACHING CAPACITY (AREA X RATE) _352,9.3 GAL./DAY
x 90.7 /
_ 477.00 X 0.74
/ 98.4
RESERVE LEACHING. CAPACITY 352.9 GAL./DAY
NOTES:
1. ALL .WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
/ ✓ / / / D
TITLE 5 AND THE TOWN RULES AND REGULATIONS FOR THE
- Z
SUBSURFACE DISPOSAL OF SEWAGE.
Cl x C7
100.3
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WATER ENCOUNTERED AT 132__ ELEV. _ 82.110
NO
x 8�`.6 / / N / / - �
WITHIN 6" OF FINISHED GRADE: .
o
3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF 92.0
0 VATi I�__ 2_
_ELEV..
vM IHSTANDiNG H-10 LOADING UNLESS-TH€Y ARE k1NDER-OR�iLTHIN= . -_
iNCFi `HZ'iniwiv -
PERCOLATION RATE _i N.. 11v G3 1
10 FT OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE _ - -- '
DEPTH HORIZ TEXTURE
COLOR
MOTT. - .OTHER
USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS.
10YR3/3
NO ROOTS
9-18 B LOAMY SAND
10YR5/6
4. ANY MASONRY UNITSUSED TO BRING COVERS TO GRADE SHALL
18-.48 Cl' FINE/MED. SAND
10YR6/8
78- 1 C2 FILL LAYER
BE; MORTARED IN PLACE:
TADCO ENVIRONMENTAL CONSULTANTS
26 (COMPASS LANE, DENNIS, MA 02638
(508) 385-2425
\
\ I x 100.9
COBBLE
5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH
73
DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO
REVISED ,j
OBTAIN SUCH DETERMINATION FROM APPROPRIATE- AUTHORITY.
z
-LOCATION MAP
6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR
SKEET 1 OF1
\
IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS
\
i \
101'8
PRIOR TO COMMENCING WORK ON SITE.
7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
SOIL \
\ \ \
SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION
1TEST 2
IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER
LaiP\
�\
\ \
\
G eASV
IMMEDIATELY.
92:9
N.
aEYAnAV- 100.00'C
100.3 (A =MM)
8. PARCEL IS IN :FLOOD ZONE 25 23
9. LOT IS SHOWN ON ASSESSORS MAP ------ AS PARCEL ------
\ \ :
`
10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR
A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED
DEPTH HORIZ TEXTURE
COLOR
MOTT. - .OTHER
0-9 0/A LOAMY SAND
10YR3/3
NO ROOTS
9-18 B LOAMY SAND
10YR5/6
18-.48 Cl' FINE/MED. SAND
10YR6/8
78- 1 C2 FILL LAYER
10YR6/2
TADCO ENVIRONMENTAL CONSULTANTS
26 (COMPASS LANE, DENNIS, MA 02638
(508) 385-2425
-138 C3 MED/COURSE SAND
ij
10YR6/4
COBBLE
6 8 \ 1 i 0�jop•0 WITH SAND AS SPECIFIED IN 310 CMR 15.255:(3).
11. A NEGATIVE GRADE OF 3/4" PER FOOT SHALL BE MAINTAINED FORA NO WATER ENCOUNTERED AT 138" ELEV. _ __$0.50
_ MINIMUM OF 15' AWAY FROM THE FOUNDATION. _.
100.2 12. A VARIANCE OF 2.8' IS REQUIRED FOR THE TOP OF FOUNDATION TO BE APPROVED:
PPRO ED: BO /I, pD OF
HEALTH
LESS THAN 2' ABOVE THE HIGH POINT IN ROAD.00
1: i` 1� V 1i L /�'1f� ( �'i
s o
D. BOX \ �cn
\ 93,1. �� \ �� o - 1 f \ o DAVE AGENT
LDT 20 & 22 3, pp \ 1 Q -
TOTAL AREA 27,814 f S. F. SOIL o a
EST 1A
x
\ 150" ALL Nty
�IMIT OF SEP�VC TAN t , pt; \ `�t01.,1Op•7 x
5'\ OVERDIG \ x J98.9 \ _- a5
x) 91.9
100.4
o j 4 / / 1 x 101: 101.8 7"
EXISTING SPOT ELEVATION x0.0 2k /
EXISTING CONTOUR ----00---- �6• / A i
FINAL SPOT ELEVATION
}'
FINAL CONTOUR 00 TP
501E TEST LOCATION
UTILITY POLE / 05• a* Pil
1c t°
TOWN WATER -W-W
CATCH BASIN.L;�
GAS LINE G ` x s'
I
C / 96.3 �� 1 �•�?`3w3P;�s
CESSPOOLOems C.
b 3
CLEANOUT -O.
n F 19 C.• \S8 PROJj2429-00dw \2429-OO.DWG 0_T.A. DUMAS
6P
zip
2
LOCUS
-
9�
o
F1, qyo
PROPOSED SEPTIC DESIGN
FOR
DI'I
PROJ: �;r�
Ili 24 22 ` ICS T RD
Y.IO ORT S
�
TADCO ENVIRONMENTAL CONSULTANTS
26 (COMPASS LANE, DENNIS, MA 02638
(508) 385-2425
DATEAPRIL 15, 2003
A.
scALE �,, _ 20'
JOB N0. 2703 -�
REVISED ,j
-LOCATION MAP
REVISED
SKEET 1 OF1
n F 19 C.• \S8 PROJj2429-00dw \2429-OO.DWG 0_T.A. DUMAS