Loading...
HomeMy WebLinkAbout22.215.2 - Title 5 Site PlanALL SYSTEM L OMPONE SYSTEM PROFILE MARKED WTHCMAGNETICTTAPEAOLR BE (NOT TO SCALE) COMPARABLE MEANS FOR FUTURE LOCATION. ACCESS COVERS TO WITHIN 6" OF FIN. GRADE \ TOP FOUND. EL. 14.5'** �Q 13.7' MINIMUM .75' OF COVER OVER PRECAST 2% SLOPE REQUIRED OVER SYSTEM RISERS (irP.) PROVIDE INSPECTION PORT TO WITHIN 3" OF FIN �� 2® 4"0SCH40 PVC C%, tJ� PIPES LEVEL 1ST 2' 2" DOUBLE -WASHED PEASTON Q pJ OR GEOTEXTILE FABRIC QQ'p *12.1' 10° 1500 GAL H-10 14- 11.66' 1 1.74' TEE SEPTIC TANK TEE 1 1 49' o°0 0 0 0 0 ° ° o ° o° °o°o O 1 1.1 6'°0000°oo°o°°o°°oo°°o°°o^°o^°°�o^oo�o^v00000000 °o°oe<oo°o 000°a°o GAS BAFFLE °.°°o�o,°,o°o,°,o° °Oo°000°°°°°°oo°o°°oo°°°o°oo°o°°oo°o°o°oo°oo°oo°0 0 000°0,°° °o°°oo°ooo"oe°o°o o°o°o 0.0 10 o o°o°o°o ° o 0 0 0 0 0 °o°o o°o°o°0 1D.5' 4' UQ. LEVEL (ACME OR EQUAL) 11.36' 1 1.19' 4" PVC SET AT .005'/' SLOPE-'/ '•�'" `^- ' ' ON 6" DOUBLE WASHED 3/4"- 1 1/2" STONE .J aa00000e000000000°o°000e000°o°o°o°o°o°o°o°o°o °,°o 0 0 °°°°,°o WATER -TEST D'BOX FOR LEVELNESS } 5' L� 6" CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 [21) SLOPE) (-L% % SLOPE) (-L-7 SLOPE) FOUNDATION- 16' - SEPTIC TANK 13' D' BOX 5' LEACHING USE ADJ. G -W ® 5.5' *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM **MIN ELEVATION TO PROVIDE GRAVITY FLOW AND HOLD MINIMUM 5' SEPARATION TO ADJUSTED GROUNDWATER LEGEND- EGEND99- 99- EXISTING CONTOUR X 99.1 EXIST. SPOT ELEV. FT971 OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF DATE: 12/18/06 PROPOSED CONTOUR 99 PROPOSED SPOT EL. TH1 < 2 MIN/INCH LOCUS IS CURRENTLY WITHIN FEMA FLOOD ZONE "A9 TEST HOLE 21= SLOPE OF GROUND CQ, UTILITY POLE FIRE HYDRANT NOTE NOT ALL SYMBOLS MAY APPEAR IN DRAWING LEACH FIELD DETAIL 1" = 20' TEST HOLE LOGS ENGINEER: DAVID FLAHERTY, R.S., SE2755 WITNESS: PHIL RENAUD, YBoH OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF DATE: 12/18/06 WORK. USE A, _ 330 GPD DESIGN FLOW PERC. RATE _ < 2 MIN/INCH LOCUS IS CURRENTLY WITHIN FEMA FLOOD ZONE "A9 SHALL BE REMOVED 5' BENEATH AND AROUND THE EL 10 & B" AS SHOWN ON COMMUNITY PANEL#250015 PROPOSED LEACHING FACILITY. CLASS I SOILS USE A Q ELEV. ZONING DISTRICT: R-25 DISTRICT Q ELEV. 0" 11.0' 0" 11.0' MIN. FRONTAGE 150' A MIN. FRONT SETBACK 30' MIN. SIDE SETBACK 15' A SITE IS NOT WITHIN APD LS GARBAGE DISPOSER IS NOT ALLOWED LS 1OYR 5/4 1OYR 5/4 11" g" B B LS LS 35" 1OYR 5/8 8.08P36" 36" 5/8 8.0' PERC C ®57" 0 FMS FMS 2.5Y 6/4 2.5Y 6/4 108" 2_0' 108" G -W ADJ. DATA: WELL: MIW 29 ZONE: BORDER A/B ADJ: 1.9'/2.8' (AVG. 2.3') '113-184 3.17' 2.0' 10/17/13 D. GONSALVES, SE WITNESS: B. MURPHY & P. RENAUD ELEV. 10.0' PROP. WATERLINE G -W ADJ. DATA (AH): WELL: MIW 29 ZONE: BORDER A/B ADJ: 2.5'/3.7' (AVG. 3.1') Scale:1 "= 20' 0 10 20 30 40 50 FEET FACILITY ` I� 722 +17.61 `�7f 82 I&SM 1. DATUM IS NGVD29 2. MUNICIPAL WATER IS AVAILABLE 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS TO BE AASHO H -1Q 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH 310 CMR 15.000 (TITLE 5.) 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. Route P'e �e 0 �Psr Se/ e � APs °3 ! 0 l Lewis ° Lewis Bay Pond Rodeo , owe"s 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (1-888-344-7233) LOCUS MAP AND VERIFYING THE LOCATION OF ALL UNDERGROUND & DESIGN OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF NOT TO SCALE WORK. USE A, _ 330 GPD DESIGN FLOW ASSESSORS MAP 22 PARCEL 215.2 11. ANY UNSUITABLE MATERIAL ENCOUNTERED LOCUS IS CURRENTLY WITHIN FEMA FLOOD ZONE "A9 SHALL BE REMOVED 5' BENEATH AND AROUND THE EL 10 & B" AS SHOWN ON COMMUNITY PANEL#250015 PROPOSED LEACHING FACILITY. 0005D DATED REV.7/2/92 12. WETLAND FLAGGED BY HAMLYN CONSULTING USE A ZONING SUMMARY GAL. SEPTIC TANK ZONING DISTRICT: R-25 DISTRICT LEACHING' MIN. LOT SIZE 25,000 S.F. MIN. BLDG COVERAGE: 25% MIN. FRONTAGE 150' MIN. FRONT SETBACK 30' MIN. SIDE SETBACK 15' MIN. REAR SETBACK 20' SITE IS NOT WITHIN APD SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED 5' REMOVAL OF UNSUITABLE SOIL REQUIRED AROUND PERIMETER of LEACHINGFACILITY, DOWN TO SUITABLE SOIL LAYER.ER.REPLACE DESIGN FLOW: 3 BEDROOMS ® 110 GPD = 330 GPD CLEAN MED. SAND, TOMFFT SPECIFICATIONS 15.2 SPE 15.2 CATIONS OF 310 CMR 55(3) USE A, _ 330 GPD DESIGN FLOW A\ SEPTIC TANK: 330 GPD (2) = 660 USE A 1500 GAL. SEPTIC TANK 13��'6 r [moi LEACHING' FILE COPY -PROVIDE 90 OF 40 MIL ' LINER AT 5' OFF SAS IN SIDES: N/A AREA SHOWN. TOP ELEV. 11.T, BOTTOM AT EL.L. 7.7'±BOTTOM 30 x 15 (.74) = 333 GPD _ TOTAL: 450 S.F. 333 GPD USE 30' x 15' x 0.5' DEEP LEACH FIELD WITH (3) 4" C\ PERF. PVC IN DOUBLE WASHED STONE. SEE DETAIL i� U_\ L POLE 1 C.42 P.E., P.L.S. APPROVED DATE BOARD OF HEALTH MA I TITLE 5 SITE PLAN OF 47 FRANKLIN ST. EXT. WEST YARMOUTH PREPARED FOR ANTHONY DISIPIO DECEMBER 26, 2013 I off 508-362-4541 fax 508-362-9880 downcape.com down cape engineering, enc. Civil engineers land surveyors 939 Main Street ( Rte 6A) YARMOUTHPORT MA 02675