Loading...
HomeMy WebLinkAbout597 Forest Road - Drawing IndexDRAWING INDEX E1 COVER SHEET B1 ANCHOR BOLT PLAN (SENT UNDER AN EARLIER COVER) E2 ROOF FRAMING PLAN E2, E3 SIDEWALL ELEVATIONS E3 ENDWALL ELEVATIONS /A MEZZANINE LAYOUT E CROSS SECTIONS FLASHING LAYOUT E- - E1 GENERAL DETAILS 0 THER DESIGN LOADING THIS STRUCTURE IS DESIGNED UTILIZING THE LOADS INDICATED AND APPLIED AS REQUIRED: BY THE MASS. 6th EDITION THE CONTRACTOR IS TO CONFIRM THAT THESE LOADS COMPLY WITH THE REQUIREMENTS OF THE LOCAL BUILDING DEPARTMENT. SPECIFIC LOADS.- (SEE STRUCTURAL CALCULATIONS AND FOUNDATION REACTIONS) 25 PSF ROOF LIVE LOAD 25 PSF ROOF SNOW LOAD 90 WIND SPEED (MPH) WIND EXPOSURE C 2.1 PSF DEAD LOAD (ROOF PANELS AND PURLINS) 10.0 PSF COLLATERAL LOAD SEISMIC ZONE— (Aa = 0.12 Av = 0.12 ) N/A CRANE CAPACITY (TONS) N/A MAXIMUM WHEEL LOAD (BEFORE IMPACT) N/A WHEEL SPACING, CMAA CRANE CLASS. = C N/A MEZZANINE TOTAL LOAD N/A MEZZANINE LIVE LOAD N/A MEZZANINE DEAD LOAD MT. PLEASANT(F) IOWA COL LIMBUS O MISSISSIPPI ROCKY MOUNT NORTH CAROLINA q S Trr, C0 MEMBER IEx MBMA SYSTEMS BUILDERS FODNDED �1 ASSOCIATION MEMBER ASSOCIATE METAL BUILDING MANUFACTURERS ASSOCIATION CONTRACTOR RESPONSIBILITIES THE CONTRACTOR MUST SECURE ALL REQUIRED APPROVALS AND PERMITS FROM THE APPROPRIATE AGENCY AS REQUIRED. APPROVAL OF CECO BUILDING SYSTEMS DRAWINGS AND CALCULATIONS INDICATE THAT CECO HAS CORRECTLY INTERPRETED AND APPLIED THE REQUIREMENTS OF THE CONTRACT DRAWINGS AND SPECIFICATIONS. (SEC. 4.2.1 AISC CODE OF STANDARD PRACTICE, 9th ED.) WHERE DISCREPANCIES EXIST BETWEEN CECO STRUCTURAL STEEL PLANS AND THE PLANS FOR OTHER TRADES, THE STRUCTURAL STEEL PLANS SHALL GOVERN (SEC. 3.3 AISC CODE OF STANDARD PRACTICE, 9th ED.) DESIGN CONSIDERATIONS OF ANY MATERIALS IN THE STRUCTURE WHICH ARE NOT FURNISHED BY CECO ARE THE RESPONSIBILITY OF THE CONTRACTOR AND ENGINEERS OTHER THAN CECO ENGINEERING UNLESS SPECIFICALLY INDICATED. THE CONTRACTOR IS RESPONSIBILE FOR ALL ERECTION OF STEEL AND ASSOCIATED WORK IN COMPLIANCE WITH CECO 'FOR CONSTRUCTION" DRAWINGS. TEMPORARY SUPPORTS, SUCH AS TEMPORARY GUYS, BRACES, FALSEWORK OR OTHER ELEMENTS REQUIRED FOR ERECTION WILL BE DETERMINED AND FURNISHED AND INSTALLED BY THE ERECTOR. (SEC 7.9.1 AISC CODE OF STANDARDS, 9th ED.) IT IS THE CONTRACTORS RESPONSIBILITY TO APPLY OR OBSERVE ALL PERTINENT SAFETY RULES AND REGULATIONS, AND PER OSHA STANDARDS AS APPLICABLE. THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL SHIPMENTS RECEIVED. SHORTAGES MUST BE REPORTED TO CECO BUILDING SYSTEMS WITHIN 48 HOURS OF DELIVERY. YOUR OUALITYBUILT PBE-ENGINEERED BUILDING SYSTEM FROM THE CONSTRUCTION PROFESSIONALS 7-7 CECO BUILDING SYSTEMS a Robertson Ceco company EASTERN REGION v P.O. DRAWER 2,387 ROCKY MOUNT, NC. 27802-2387 PHONE (919) 977-2131 FAX (800) 888-9489 THESE DRAWINGS ARE FOR M FINAL CONSTRUCTION DRAWINGS PRELIMINARY DRAWINGS - DO NOT USE FOR CONSTRUCTION APPROVAL DRAWINGS - DO NOT USE FOR CONSTRUCT70N aRELEASED FOR PERMIT PURPOSES PRIOR TO COMPLETION OF FINAL CONSTRUCTION DRAWINGS - DO NOT USE FOR CONSTRUCTION OTHER SHIP TO: WESTSTAR ASSOCIATES C/O YARMOUTH LANDFILL FORREST ROAD YARMOUTH, MA 02664 33061-48 1 E1 uF 13 w cxxgT °snr �'g u snnm7x2q Po a wf�rsrtxE°�°'ATTN: °nai n° i ` l U"A wry CTM UAI 9-24-97 CUSTOMER: WESTSTAR ASSOCIATES INC. 131 E. WASHINGTON STREET N. ATTLEBORO, MA 02761 PETER WESTCOTT CHECKED TL DATE 9-25-97 ENGINEER )Futnd DATE 9-90``r1 DET. DATE CHK. DATE SHIP TO: WESTSTAR ASSOCIATES C/O YARMOUTH LANDFILL FORREST ROAD YARMOUTH, MA 02664 33061-48 1 E1 uF 13