Loading...
HomeMy WebLinkAbout22 Glenwood Street Proposed AlterationsFLOOR PLAN AND NOTES EXISTING NO WALL CONST NEW (2) 2x81 1/2" TH. CDX TYPICAL DOOR AND WINDOW HEADER DETAIL SCALE: 3'=1'-0" EXTERIOR ELEVATIONS DEMOLITION PLAN 1) PLAN DIMENSIONS PROVIDED PER SURVEY BY HOLMES & MCGRATH 2) GUT THE INTERIOR INCLUDING INTERIOR PARTITION TO MAKE ONE LARGE SPACE 3) REMOVE EXISTING DOORS AND WINDOWS AND REPLACE PER FLOOR PLAN SOUTH ELEVATION NORTH ELEVATION TRASH 1) INSULATE WALLS AND CEILING AS AN OPTION (ADDIALTERNATE #1) 2) REMOVE THE EXISTING DOOR AND INFILL FRAME 3) PROVIDE REPLACEMENT DOOR LOCATED ON THE NORTH ELEVATION 4) PUT 4 REPLACEMENT WINDOWS, LOCATION AND TYPE AS INDICATED (MATCH MAIN HOUSE) 5) SHINGLE THE EXTERIOR TO MATCH THE NEW HOUSE 6) RE -ROOF TO MATCH THE NEW HOUSE 7) CARPET SELECTED BY OWNER, INSTALLED BY G.C. 8) RE -USE THE OLD BEAD BOARD ON THE CEILING OR (WAINSCOT IF NOT ENOUGH MATERIAL FOR CEILING) 9) UPGRADE ELECTRICAL AND TIE IN TO MAIN HOUSE (ONE DUPLEX PER WALL) 10) CABLE AND PHONE LINES AS INDICATED 11) ONE CEILING LIGHT SUPPLIED BY OWNER, G.C. INSTALLED 12) RE -FRAME AROUND EXISTING WINDOWS ON THE EAST AND WEST ELEVATIONS AS DIMENSIONED 13) WOODEN TRASH COLLECTION WITH HINGED COVER AND LATCH 14) REPLACE GUTTERS, PROVIDE TWO DOWNSPOUTS ON SOUTH ENDS EAST ELEVATION WEST ELEVATION s a M a M SCALE: 1/4" = 1'- 0" b I0 _ Top of Gable EL: 15'-5 1/4" Bottom of Eave EL: 8'-1 1/4" Finished Floor (Slab on Grade) EL: 0'-0" _ ,Top of Gable EL: 15'-5 1/4" Bottom of Eave EL: 8'-1 1/4" Finished Floor (Slab on Grade) EL: 0'-0" SCALE: 1/4" = 1'- 0" I1 102 Kapalis Shed Restoration 22 Glenwood Street West Yarmouth MA 1 Issued for Building Permit 5/3/05 No. Description of Revisions Date Shed Structure Floor Plans & Exterior Elevations Drawn by: DJK Job Number: 2301.00 Checked by: DJK Scale: 1/4"=1'-0" Plot Date: Feb. 21, 2005 Issue Date: Feb. 21, 2005 SKAml GLENWOOD STFEET DEMOLITION PLAN EXISTING CONDITIONS: LOT SIZE: 7,337 S.F. TOTAL FOOTPRINT AREA: 1,102 S.F. TOTAL GROSS SQUARE FOOTAGE: 1,61S.F. TOTAL COVERED PORCH AREA: 368 S.F. NUMBER OF BEDROOMS: 4 NUMBER OF PERVIOUS PARKING SPACES: (5) EXISTING HEIGHT AT GABLE: 41'-0" A.S. . EXISTING SETBACKS AS INDICATED ON PL AN SCALE: 1116" 1'- 0" 0 Additions and Alterations for the Kapalis Residence 22 Glenwood Street West Yarmouth MA 1 Existing Septic Tank Information 11/19/01 No. Description of Revisions Date W S N E Demolition Plan Drawn by: DJK Job Number: 2000.00 Checked by: DJK Scale: Plot Date: Nov. 5, 2001 Issue Date: Nov. 5, 2001 D 100 SITE PLAN o - TOWN OF WEST YARMOUTH MASSACHUSETTS SINGLE FAMILY RESIDENCE R-25 ZONE LOT SIZE: 7,337 S.F. TOTAL FOOTPRINT AREA: 1,680 S.F. TOTAL GROSS SQUARE FOOTAGE: 2,335 S.F. TOTAL DECK AREA: 655 S.F. NUMBER OF BEDROOMS: 3 NUMBER OF PERVIOUS PARKING SPACES: (4) HEIGHT RESTRICTION: 35'-0" SETBACK RESTRICTIONS AS FOLLOWS: FRONT: 28'-10" (30% OF A 96'-9" LOT DEPTH PER ZONING BYLAW SECTION 203.5.1) REAR: 20'-0" SIDE 15'-0" NOTE: DESIGNED STRUCTURE HAS BEEN DESIGN TO ALL ZONING AND BUILDING REQUIREMENTS A RESTRICTIONS AS STIPULATED WITHIN THE TOWN OF YARMO ZONING BYLAW DATED JANUARY 11, 2000 — f-4tL10-6 15 N° ?VV rp5f -W l.�ArLb f �17 y1S10O4AI_. LIN SCALE: 1/16'1411-0" 101 Additions and Alterations for the Kapalis Residence 22 Glenwood Street West Yarmouth MA 1 Proposed Septic Tank Information 11/19/01 No. Description of Revisions Date N W�E Site Plan Drawn by: DJK Job Number: 2000.00 Checked by: DJK Scale: 1/16"=1'-0" Plot Date: Nov. 5, 2001 Issue Date: Nov. 5, 2001 A o.1 ACCESS EASEMENT PERVIOUS GRAVEL DRIVING AREA 'I I � I .I II I I I II II I ,I .I I I I I II .I .I l 1 1 !I 1 1 i i i !I i 1 1 11 1 1 Il .I II 11 1 II !1 , FIRST LEVEL FLOOR PLAN ACCESS FJ PERVIOUS i j ! -------- PERVIOUS GRAVEL _ _ _ _ EXISTING LEECHING I PARKING AREA _ _ _ Ir_ _;_ GALLEYS TOREMAIN - I I j I I I I ; I ; i EXISTING RELOCATED I I DISTRIBUTION BOX I (NEW 1506 GALLON SEPTIC TANK) j REFER0 SEWAGE DISPOSAL PLANS , OR EXACT LOCATION I AND CONSTRUCTION DETAILS I LU I I ' I I ` I I 1 I j F I I I IT I 6� 14'-0" --- REAR YARD SETBACK 4'-1" 3 A4.1 1 UP 3.3 ---------------------------- -----------1- ----� y I' I' ' DNV , I ' BASEMENT I FLUSH PANEL MAPLE VENEER CABINETS BULKHEAD - BLACK GRANITE COUNTER SURFACE, OOSTAINLESS STEEL SINK APLIANCES SUPPLIED ; ! BY OWNER, INSTALLED BY G.C. �0 KITCHEN ; - 103 1- 7-1" TYP. I I HALL I I I 104 NEW 5" W. x 8" D. LVLT; M zo I � LIVING ROOM 102 102 First Floor EL: 1'-8" 14'-0' 5'-8" 1 4'-0' I ] \ DN 4'-4" FOYER 100 First Floor EL: T-8" I CLOSET 101 ; k100 UP I I I � EXTERIOR DECK — 108 I , I , 0 SUP 17 I� SLATE EN' WALK 14'-0' FRONT YARD PROPERTY LINE 4'-4" 1 12'-0" First Floor 0 EL: 1'-8" 106 BATH 106 SHELVING W/ MAPLE CABINET - FACE 31-01 E 30' FRONT YARD SETBACK SLATE 12'-0 6" W 0 W in 4 4 zo X W W J W a- a_ W EXISTING 15'-0' 4 SALVAGE EXISTING SHOWER STALL AND W RELOCATE AS SHOWN, PROVIDE NEW U CONCRETE PAD AND EXTERIOR PLUMING Z CONTROLS, AND SPIGOT HOOK-UP LL- EL Wi U EL a C3 O 2 I I I I I I I I PERVIOUS GRAVEL PARKING AREA ; ; 0 SCALEd �14" = 1'- 0" 101 Proposed Kapalis Cape Residence 22 Glenwood Street West Yarmouth MA 2 Structural Revision to Porch Per Bldg. Dept. 9/28/04 1 Revised Kitchen Layout 6/24/04 No. Description of Revisions Date First Level IF Plan Drawn by: DJK W Checked by: DJK S Plot Date: June 6, 2004 N EDAg04,i E JOHN/�rRc� - First Level IF Plan Drawn by: DJK Job Number: 2301.00 Checked by: DJK Scale: 1/4"=1'-0" Plot Date: June 6, 2004 Issue Date: Jan. 6, 2004 EDAg04,i JOHN/�rRc� - A '0.9905 OSTON, MA y J MASc,P 1.1OF V ACCESS EASEMENT PERVIOUS GRAVEL DRIVING AREA FIRST LEVEL FLOOR PLAN - - - _PERVIOUS GRAVEL_ _ _ r _ _ - - - - EXISTING LEECHING GALLEYS TO REMAIN - PARKING AREA I — ---j I I ---------------------- I I I I EXISTING RELOCATED DISTRIBUTION BOX i i i I 15'-0" I I I I I I I I I I i i i i I I I I ACCESS EA SEMENT i PERVIOUS 3RAVEL i DRIVING AREA II I I it I I I I I I (NEW 150 GALLON SEPTIC TANK) i REFER0 SEWAGE DISPOSAL PLANS • OR EXACT LOCATION AND CONSTRUCTION DETAILS I i I I ' • L J :a NEW CONTINUOUS 5"W. x 8"D. LVL BEAM ABOVE, SECURE TO POST AND FOUNDATION BELOV — — ------ REAR YARD SETBACK EXISTING TREE I I I I I I I t i I1 30' FRONT YARD SETBACK a� CN FRONT YARD PROPERTY LINE X W W Z I� W a O W a 0 W U) EXISTING 15t -0t" 4 A4.1 SALVAGE EXISTING SHOWER STALL AND ---�RELOCATE AS SHOWN, PROVIDE NEW U CONCRETE PAD AND EXTERIOR PLUMING W CONTROLS, AND SPIGOT HOOK-UP W U a O 0 2 , , , , i PERVIOUS GRAVEL PARKING AREA 0 SCALE: 1114" = 1'- 0" 1 01 * An* Proposed Kapalis Cape Residence 22 Glenwood Street West Yarmouth MA 2 Structural Revision to Porch Per Bldg. Dept. 9/28/04 1 Revised Kitchen Layout 6/24/04 No. Description of Revisions Date W Checked by:DJK DhV-'; l N ED ARCh� JOHN/ l�c� 105 First Floor EL: 1'-8„ 0.9905 OSTON, It r i - -REF - 1 DINT G t� BASEMENT FLUSH PANEL MAPLE VENEER CABINETS 10 BULKHEAD - BLACK GRANITE COUNTER SURFACE, STEEL SINK APLIANCES SUPPLIED ; OOSTAINLESS BY OWNER, INSTALLED BY G.C. 6" KITCHEN ; 103 " I I 2'-1"TYP. HALL 104 ° 4 NEW 5"W. x 8"D. LVLT; 106 _ _ zo BATH ' zo 108 107 ' LIVING ROOM 44 �? - - SHELVING W1 MAPLE CABINET 0 d 102 FOYER -- -- FACE 100 _ U First FlaorBEDROOM --- EL: 1,-8" 107 ^' CLOSET 101 First Floor r W 0 EL: 1'-8" 101 ; q LIP - IN -ACTIVE ACTIVE � 102 4 EXTERIOR DECK EO ' 108 EXISTING TREE I I I I I I I t i I1 30' FRONT YARD SETBACK a� CN FRONT YARD PROPERTY LINE X W W Z I� W a O W a 0 W U) EXISTING 15t -0t" 4 A4.1 SALVAGE EXISTING SHOWER STALL AND ---�RELOCATE AS SHOWN, PROVIDE NEW U CONCRETE PAD AND EXTERIOR PLUMING W CONTROLS, AND SPIGOT HOOK-UP W U a O 0 2 , , , , i PERVIOUS GRAVEL PARKING AREA 0 SCALE: 1114" = 1'- 0" 1 01 * An* Proposed Kapalis Cape Residence 22 Glenwood Street West Yarmouth MA 2 Structural Revision to Porch Per Bldg. Dept. 9/28/04 1 Revised Kitchen Layout 6/24/04 No. Description of Revisions Date First Level,TloQr,, F11a�' Drawn by: DJK W Checked by:DJK S Plot Date: June 6, 2004 N ED ARCh� JOHN/ l�c� E First Level,TloQr,, F11a�' Drawn by: DJK Job Number: 2301.00 Checked by:DJK Scale: 1/4"=1'-0" Plot Date: June 6, 2004 Issue Date: Jan. 6, 2004 ED ARCh� JOHN/ l�c� 0.9905 OSTON, It MA H OF MP55 0 1 , ACCESS EASEMENT PERVIOUS GRAVEL DRIVING AREA BASEMENT PLAN PERVIIOUS GRAVEL_ _ _ r _ ; _ _ _ _ _ EXISTING LEECHING L___________ ___ _ GALLEYSTOREMAIN I PARKING AREA ! 1 I 1 I I ' i I 1 1 I 1 ----------------- I I EXISTING RELOCATED DISTRIBUTION BOX I I � � "1�I I (NEW 15u GALLON SEPTIC TANK) ! I REFER 0 SEWAGE DISPOSAL PLANS�OR EXACT LOCATION J j AND CONSTRUCTION DETAILS I ACCESS EI PERVIOUS II TREE; W J W CL W Cn 151-011 8" CAST IN PLACE CONCRETE FOUNDATION WALL W/ 1'-0" DEEP BY 2'-0" WIDE FOOTING TYPICAL, @ 4'-0" MIN. BELOW GRADE — 14'-0" 3 ; A4.1 14'-0" I SLATE PATIO 12'-0" I 1 4 _ N ------- ---------------------; , I ------------------ lr —11—I ill ilil Issue Date: Jan. 6, 200 UNFINISHED i SHELVING �. r--- ------------------------------� ' No. 9905 BOSTON, W � O MA J I ' 1 —It -------------- -----------------1 1 1 I PROVIDE FULL HOOK-UP I - -- , tVASHER l R WASHER DRYER 1 I 5' SLAB ON GRADE W/ VAPOR i o BASEMENT WIN TYPICAL, A PLIANCES, DISPOSE OF I 1 r--- i-____Tli SPACE BELOW '--'-_-_-_- WA ER RUNOFF INTO ON 3.2 „ --------J II 1 _CRAWL 1 KITCHEN ROOM I _L'' -} SIT EPTIC SYSTEM, 1 , VENT OTO EXTERIOR I L __} _ _ I I :DRYER I 1 I 1 1 1 — --__--J •,. L_--- 1 a: ------------------------------ 1 Il __,_____JI I 1 11 1 ;r- 1 1 i 1 1 1 1 1 1 UP 1 I 1 I 1 I 1 1 1 1 1 _ I 1 1 Basement Level EL: -6'-4" 1 1 1 I `Q I 1 EXISTING TREE 1 Basement Level _ _ ; ; Basement Level EL: -6'4" - ' EL: -6,411 I I r - , � 1 I 1 I , 1 1 1 1 1 I 1 I I I 1 1 I I 1 1 1 1 1 1 I I 1 1 1 I 1 L_ � 1 1 , 1 r 1 i I , , EEi 1 1 ' LID T ---------------------------- I 12" DIAM. SONOTUBE PIER, TYP. I ---- --- -L- - -- = -- --- - -- - ------ - --{ 1 30' FRW YARD SETBACK ,I II 11 ------II STM ----I – Ra _1 ------------------------------------ I i I 1 SLATE ENTRY WALK I 1 ' I ' 1 1 , I 1 I 1 1 1 1 1 1 I 1 F- 1 1 I , 1 I 1 1 1 , 1 , 1 , I , 1 1 , I , I , 1 1 1 1 1 1 SLATE ENTRY WALK , 1 , I 1 , 1 , 1 1 I 1 I , 1 1 1 , , 1 1 , 1 1 1 , I , 1 , 1 , FRONT YARD PROPERTY LINE , 1 , I t4 N W W Z_ J W CL a W Fn EXISTING NOTE: THIS RESIDENCE WILL HAVE FURNISHED AND INSTALLED A FORCED WATER FIN -TUBE RADIANT HEATING SYSTEM IN ALL FINISHED SPACES. HEATING FUEL SPECIFIED AS OIL, EQUIPMENT AND CONTROL WILL BE LOCATED IN THE BASEMENT, NATURAL VENTILATION IS PROVIDED IN ALL ROOMS. THIS BUILDING WILL NOT HAVE AN AIR CONDITIONING SYSTEM, COOLING WILL BE PROVIDED BY CEILING FANS IN LIVING ROOM AND ALL BEDROOMS I I I I I 1 I I I I PERVIOUS GRAVEL PARKING AREA I I I I I I I I I 1 I I 1 SCALE: S/4" = 1'- 0" 101 Proposed Kapalis Cape Residence I 22 Glenwood Street West Yarmouth MA Drawn by: DJK Job Number: 2301.0 Checked by: DJK STORAGE Plot Date: June 6, 2004 Issue Date: Jan. 6, 200 UNFINISHED i SHELVING �. r--- ------------------------------� ' No. 9905 BOSTON, W � O MA J I 1.0 1 I I OPERABLE REVER HOPPER 1 I 5' SLAB ON GRADE W/ VAPOR i o BASEMENT WIN TYPICAL, I BARRIER AND INSULATION OVER I I -' PROVIDE CUT ON NORTH COMPACTED CRUSHED STONE, TYP. , ST WINDOW LOCATIONS EXISTING TREE 1 Basement Level _ _ ; ; Basement Level EL: -6'4" - ' EL: -6,411 I I r - , � 1 I 1 I , 1 1 1 1 1 I 1 I I I 1 1 I I 1 1 1 1 1 1 I I 1 1 1 I 1 L_ � 1 1 , 1 r 1 i I , , EEi 1 1 ' LID T ---------------------------- I 12" DIAM. SONOTUBE PIER, TYP. I ---- --- -L- - -- = -- --- - -- - ------ - --{ 1 30' FRW YARD SETBACK ,I II 11 ------II STM ----I – Ra _1 ------------------------------------ I i I 1 SLATE ENTRY WALK I 1 ' I ' 1 1 , I 1 I 1 1 1 1 1 1 I 1 F- 1 1 I , 1 I 1 1 1 , 1 , 1 , I , 1 1 , I , I , 1 1 1 1 1 1 SLATE ENTRY WALK , 1 , I 1 , 1 , 1 1 I 1 I , 1 1 1 , , 1 1 , 1 1 1 , I , 1 , 1 , FRONT YARD PROPERTY LINE , 1 , I t4 N W W Z_ J W CL a W Fn EXISTING NOTE: THIS RESIDENCE WILL HAVE FURNISHED AND INSTALLED A FORCED WATER FIN -TUBE RADIANT HEATING SYSTEM IN ALL FINISHED SPACES. HEATING FUEL SPECIFIED AS OIL, EQUIPMENT AND CONTROL WILL BE LOCATED IN THE BASEMENT, NATURAL VENTILATION IS PROVIDED IN ALL ROOMS. THIS BUILDING WILL NOT HAVE AN AIR CONDITIONING SYSTEM, COOLING WILL BE PROVIDED BY CEILING FANS IN LIVING ROOM AND ALL BEDROOMS I I I I I 1 I I I I PERVIOUS GRAVEL PARKING AREA I I I I I I I I I 1 I I 1 SCALE: S/4" = 1'- 0" 101 Proposed Kapalis Cape Residence I 22 Glenwood Street West Yarmouth MA Drawn by: DJK Job Number: 2301.0 Checked by: DJK Scale: 1/4"=1'-( Plot Date: June 6, 2004 Issue Date: Jan. 6, 200 UNFINISHED .�gRED ARCH. Q�,V �QJ JOHN�TF�,� ' No. 9905 BOSTON, W � O MA J I 1.0 1 I I BASMENT I I ' I ' 001 I L __} _ _ I I I 1 I 1 1 1 — 1 EXISTING TREE 1 Basement Level _ _ ; ; Basement Level EL: -6'4" - ' EL: -6,411 I I r - , � 1 I 1 I , 1 1 1 1 1 I 1 I I I 1 1 I I 1 1 1 1 1 1 I I 1 1 1 I 1 L_ � 1 1 , 1 r 1 i I , , EEi 1 1 ' LID T ---------------------------- I 12" DIAM. SONOTUBE PIER, TYP. I ---- --- -L- - -- = -- --- - -- - ------ - --{ 1 30' FRW YARD SETBACK ,I II 11 ------II STM ----I – Ra _1 ------------------------------------ I i I 1 SLATE ENTRY WALK I 1 ' I ' 1 1 , I 1 I 1 1 1 1 1 1 I 1 F- 1 1 I , 1 I 1 1 1 , 1 , 1 , I , 1 1 , I , I , 1 1 1 1 1 1 SLATE ENTRY WALK , 1 , I 1 , 1 , 1 1 I 1 I , 1 1 1 , , 1 1 , 1 1 1 , I , 1 , 1 , FRONT YARD PROPERTY LINE , 1 , I t4 N W W Z_ J W CL a W Fn EXISTING NOTE: THIS RESIDENCE WILL HAVE FURNISHED AND INSTALLED A FORCED WATER FIN -TUBE RADIANT HEATING SYSTEM IN ALL FINISHED SPACES. HEATING FUEL SPECIFIED AS OIL, EQUIPMENT AND CONTROL WILL BE LOCATED IN THE BASEMENT, NATURAL VENTILATION IS PROVIDED IN ALL ROOMS. THIS BUILDING WILL NOT HAVE AN AIR CONDITIONING SYSTEM, COOLING WILL BE PROVIDED BY CEILING FANS IN LIVING ROOM AND ALL BEDROOMS I I I I I 1 I I I I PERVIOUS GRAVEL PARKING AREA I I I I I I I I I 1 I I 1 SCALE: S/4" = 1'- 0" 101 Proposed Kapalis Cape Residence I 22 Glenwood Street West Yarmouth MA Drawn by: DJK Job Number: 2301.0 Checked by: DJK Scale: 1/4"=1'-( Plot Date: June 6, 2004 Issue Date: Jan. 6, 200 .�gRED ARCH. Q�,V �QJ JOHN�TF�,� No. 9905 BOSTON, W � O MA J �F t MaSSP� F 1.0 U � a Proposed Kapalis Cape Residence 22 Glenwood Street West Yarmouth MA 1 Revised Plan per Board of Health Review Comments 8/29/04 No. Description of Revisions Date W Checked by: DJK S Plot Date: June 6, 2004 N \SZEREDAROyi T�0 E QQ.v Q,\JOHN/C9a //AA,� N0.99D5 N y o BOSTON, 3 MA y MA �J 100 OF 1 ILu PERVI.OUSGRAVEL; ; EXISTING LEECHING -----1 1 I - GALLEYS TO REMAIN PARKING AREA 1• I r I , ; � --- - _-_--_-_--_.--.REAR YARD SETBACK --------------- 1 I ACCESS EASEMENT 1 PERVIOUS GRAVEL I 1 DRIVING AREA I I I I 3 I i EXISTING I RELOCATED SLATE PATIO I DISTRIBUTION BOX A4.1 11 I (NEW 150p GALLON SEPTIC TANK) I • 14'-0" 1; EXISTING TREE I REFER 10 SEWAGE DISPOSAL I PLANS ,OR EXACT LOCATION AND CONSTRUCTION DETAILS 1 W ! I 1 z A3.3 J 4 1 1 I I I I I L-------- 0 ------------------ ----- ----'- I ----- - ---- -y-, II fir___ II ___err III ~ .1 , I I I 1 I '-11++ -- --� O I I t "t • D N ree i �ij 1 1 ---` y a i---------------! ----------------- 1 1 PROVIDE FULL HOOK-UP Q i --- -- ---„ I ' VASHERI' RWASHERDRYER 1 11 1 "-----i - T;; i i I ' CRAWL SPACE BELOW ' �_ A PLIANCES, DISPOSE OF WA ER RUNOFF INTO ON ' 9 I i r A3.2 L -r - I „ ' KITCHEN ROOM I _ _ _ =r - 1 - " SIT EPTIC SYSTEM, LV VENT OTO EXTERIOR i i Q I I J II ' DRYER ' ' " ♦� I T 1 1 II 1 1 1 ___I ____ __ m I I " y.lr-____ ____ �___________J 1 1 L _________________________________ R __,_____JI 1 I L 1 W I I 1 } ; STORAGE i I I---- i 1--------- - - ---- ------� EI --------------------------------- r-- --------------------- ---------- i SHELVING i I 1 1 Q 1 ! } I 1 1 I 1 I I 1 I I I 1 1 11 UJ i i i i 5" SLAB ON GRADE W/ VAPOR i OPERABLE REVER HOPPER ' I 1 9 , BARRIER AND INSULATION OVER 1 BASEMENT WIN TYPICAL, I i 1 ; UP i COMPACTED CRUSHED STONE, TYP. I PROVIDE CUT ON NORTH ; EXISTING TR E I i ; i ST WINDOW LOCATIONS 1 1 1 1 I I I 1 N I 15'-O" ! I I IL I 1 I 1 UNFINISHED ; I ; 1 1 1 I 15 O F BASMENT ---' _ ... 1 I 1 ' i�-- 1 001 ' 1 ' 1 1 Q0 1 1 W I I I 1 L _ I 1 v ?' j Z 2 � ; Basement Level ; ; Basement Level _ _ _ _ _ _ _; ; Basement Level ; 4 — J A4.1 ^' EL: -6'-4„ i ; EL: -6'�" ; ; EL: -6'-4„ 1 I A4.1 1 1 Lu �1 A3.1 1 1 I 1 1 I lw 1 Q 8" CAST IN PLACE CONCRETE Q 11 ` FOUNDATION WALL W1 P-0" DEEP I 1 1 I 1 1 ' 1 I BY T-0" WIDE FOOTING TYPICAL, ' I '— 1 i ,'. 1 1 UP 1 1 i @ 4'-0" MIN. BELOW GRADE 1 1 L_______ __________ ______ 1 ' 1 1 L__ --------------------------- CIO1 d 1 LJ 1 i I I i 3'-10" i 1 I -> Q O ' ' I (V I I L_ __________________________________________' Z 1 1 I I y 1 j j EXISTING TRE w 1 I EDGE OF PORCH ABOVE 12" DIAM. SONOTUBE PIER, TYP. ,� -----;;, I 30 FIRM YARD SETBACK XISTINGTREE 11 T� ------- 1 I I I ------------------------------------ SLATE ENTRY THIS RESIDENCE WILL HAVE FURNISHED AND INSTALLED WALK FORCED WATER FIN -TUBE RADIANT HEATING SYSTEM IN ALL 1 FINISHED SPACES. HEATING FUEL SPECIFIED AS OIL, 1. I EQUIPMENT AND CONTROL WILL BE LOCATED IN THE I ---------------------------------------I , BASEMENT, NATURAL VENTILATION IS PROVIDED IN ALL ROOMS. I THIS BUILDING WILL NOT HAVE AN AIR CONDITIONING SYSTEM, COOLING WILL BE PROVIDED BY CEILING FANS IN LIVING ROON I C AND ALL BEDROOMS � I I , , I N I I ACCESS FJ SEMENT 1 PERVIOUS 3RAVEL ; 1 DRIVNG AREA 1 EXISTING SLATE ENTRY: PERVIOUS GRAVEL 1 I DOUBLETREE WALK PARKING AREA i ; I I , I I , I I , I I , I I I EXISTING TREE , I , I I , I I 1 j I I i FRONT YARD PROPERTY LINE I , I � I ' I I ' I I , , I EXISTING TREE, BASEMENT PLAN SCALE: 1/4" '- 0" = 171 1 Proposed Kapalis Cape Residence 22 Glenwood Street West Yarmouth MA 1 Revised Plan per Board of Health Review Comments 8/29/04 No. Description of Revisions Date m a Al ar�I�� Drawn by: DJK W Checked by: DJK S Plot Date: June 6, 2004 N \SZEREDAROyi T�0 E QQ.v Q,\JOHN/C9a m a Al ar�I�� Drawn by: DJK Job Number: 2301.00 Checked by: DJK Scale: 1/4"=1'-0" Plot Date: June 6, 2004 Issue Date: Jan. 6, 2004 \SZEREDAROyi T�0 QQ.v Q,\JOHN/C9a //AA,� N0.99D5 N y o BOSTON, 3 MA y MA �J 100 OF (U <