HomeMy WebLinkAbout34 Glenwood Street Sewage Disposal System UpgradeSOIL TEST PIT DATA:
TEST PIT #1
GRD. EL. 101.1
0' GW. EL. N A
9/21/00
P LOAMY SAND 7.5YR 4/2
1' B 12"
2' LOAMY SAND 10YR 5/6
3' 36"
EL = 98.1
4' C
5'
66!-
6'-
7'-
81-
SAND
6"6'7'8'SAND 10YR 6/6
9'
10'
11' EL = 90.1 132"
DATE-
9/21/00
ATE:9/21/00
TEST BY:
THE BSC GROUP, INC.
WITNESSED BY -
YARMOUTH BOARD OF HEALTH
PERC. RATE:
<2-MIN./INCH
SOIL EVALUATOR
C. FIELD
SOIL CLASS:
1
L.T.A.R.
0.74 G.P.D./SQ.FT.
SEPTIC TANK DETAIL:
1,500 GALLON
NOT
TO SCALE
98.80
NOTES: 1.
SEPTIC TANK SHALL BE STEEL
5. INLET AND OUTLET TEES TO BE CAST IRON,
C
REINFORCED CONCRETE.
SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE.
2_
SEPTIC TANK TO WITHSTAND H-10 LOADING
TEES TO BE CENTERED UNDER MANHOLE COVER.
E
UNLESS UNDER PAVEMENT, DRIVES OR
97.43
F
TRAVELED WAYS, WHEREIN H-20 LOADING
v';;v„♦•v';;v..+,a:•v....;:•v.:," Z'
00
SHALL APPLY.
(2) LEACHING AREAS
3.
ALL PIPE CONNECTIONS AND CONCRETE
97.20
G BREAKOUT 97.7
CONSTRUCTION SHALL BE WATERTIGHT.
GROUNDWATER
4.
FILL ALL UNUSED KNOCKOUTS WITH
MORTAR.
2-24" DIA CONCRETE MANHOLE COVEF
TEE TO BE UNDERBROUGHT TO 6 OF FINISH A
INDICATES M.H. OPENING 12" MR T-
PERC. RAISE M.H W/_
TEST I- 10'-6"
SEWER BRICK -
10' -0' do MORTAR
NORMAL WATER LEVEL 12"
c 3'
PRECAST SEPTIC TANK atTl0" 14"
INLET TEE
TE
DO O C 5'-2. 4'-6" a 4'-0" MIN. wpu ODD ON
5'-8" LIQUID DEPTH (c♦sROW
_N -Y
�a BOTTOM ON LEVEL STABLE BASE
PLAN VIEW 6" MIN. 3/4' To
1 1/2" STONE CROSS-SECTION VIEW
DATUM:
VERTICAL DATUM: ASSUMED
BENCH MARK SET: TOP OF CONCRETE BOUND ELEVATION =101.22
PROFILE: NOT TO SCALE
EL.= A
TOP FOUNDATION FIRST PIPE LENGTH
CONCRETE COVERS TO WITHINTO BE SET LEVEL
EL= 103.0 6" OF FINISHED GRADE. FOR MIN. 2'
7 FINISH GRADE
2' MIN., EL=100.8-101.2
1�e VC l
20'®2% U u 35'01.5% =08SERVED
11=B I=D
1=E 6'
1=c
5 OUTLET
1500 GALLON DIST. BOX
SEPTIC TANK
6' STONE BASE
J BOTTOM OF TEST HOLE
INVERT ELEVATIONS:
TOP OF FOUNDATION
104.4
A
4" INVERT AT BUILDING
98.80
8 (REPLUMB & NEW LOCATION)
4" INVERT AT SEPTIC TANK (IN)
98.38
C
4" INVERT AT SEPTIC TANK (OUT)
98.13
D
4" INVERT AT DIST. BOX (IN)
97.60
E
4" INVERT AT DIST. BOX (OUT)
97.43
F
INVERTS AT LEACHING FACILITY:
v';;v„♦•v';;v..+,a:•v....;:•v.:," Z'
00
4" INVERT AT BEGINNING
(2) LEACHING AREAS
TPAVEMENT,UNLESS
OF LEACHING CHAMBER
97.20
G BREAKOUT 97.7
ELEVATION AT BOTTOM
GROUNDWATER
SHALL APPLY.
OF LEACHING CHAMBER
95.20
H
NO GROUNDWATER
OBSERVED
VARIANCES REQUESTED:
NONE
FLOOR PLANS
90.1 J
SEE ATTACHED ARCHITECTURAL PLANS
S
rn
0
I
N
n
rn
z
Q
J
a
0
U
0
z
a
J
NOTE:
ISOLATED AREA OF WETLAND VEGETATION
DELINEATED BY NORMAN HAYES, PWS OF
THE BSC GROUP. CONFIRMED BY Mr. BRAD
HALL - YARMOUTH CONSERVATION AGENT - TO
BE NON -JURISDICTIONAL UNDER THE STATE AND L
BYLAW AS THE WETLAND AREA IS LESS THAN THE
MINIMUM SQUARE FOOTAGE REQUIRED TO BE
CONSIDERED A JURISDICTIONAL WETLAND.
PLAN VIEW
SCALE: 1" = 20 FEET
0 10 20 40 FT.
911c AL
AL AVC.
N/F
W.F. MAKEPEACE
PROPOSED
D" BOX
PROPOSED AREA 1
8'x24' S.A.S
PROPOSED
OBSERVATION
PORT 6
PROPOSED
1500 GALLON
SEPTIC TANK
DISTRIBUTION
BOX
DETAIL:
NOT TO SCALE
I-
22.5'
PLAN REFERENCE:
NO. OF OUTLETS: 5
FINISHED GRADE
0 o
0 0 0 0
20
OR TRAVELED WAY SHALL BE SCHEDULE
REMOVABLE -�
Imo- 2' WALLS
NOTES:
COVER
R-25
150' OF ANY KNOWN LEACHING FACILITY.
SETBACKS:
v';;v„♦•v';;v..+,a:•v....;:•v.:," Z'
00
1. DIST. BOX TO WITHSTAND H-10 LOADING
(2) LEACHING AREAS
TPAVEMENT,UNLESS
T
UNDER
TRAVELED WAYSWHEREIN HD20 LOADING
1
25,000 S.F.
GROUNDWATER
SHALL APPLY.
3 UNITS EACHHIGH
T
15"
50"
6' 5,5" OUTLETS
a 8"
L
2• PROVIDE INLET TEE OR BAFFLE WHERE
ESO°0
DENSITY°°
AND THE APPLICABLE UTILITY
COMPANY AND MAINTAINING THE
SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR
A.
♦ :�••♦eee ••ee a oe♦ oe♦
`' o�°eb �'a♦ 9'�' q'a�4'a
T
L_
IN PUMPED SYSTEM.
BOTTOM ON LEVEL
INFILTRATOR 305°
2"
3. FIRST TWO FEET OF PIPE OUT OF DIST.
STABLE BASE
6" MIN. 3/4' TO
BOX TO BE LAID LEVEL
CROSS-SECTION
1 1/2" CRUSHED
STONE BASE
4, ALL PIPE CONNECTIONS AND CONCRETE
TO THE START OF CONSTRUCTION.
°
S. THIS SYSTEM IS NOT DESIGNED FOR
CONSTRUCTION SHALL BE WATERTIGHT.
�. 30 /2"
PRECAST DIST.
Box
T T
'7 1/2"
PLAN VIEW
AL
.L f
AL
I f AL
JL
VETLAND/
DILATEDVE,GA TI N
2,657±//S.F. /
AL /C�JIL
AL
/ N o a� /
2
SHED /
5. FILL ALL UNUSED KNOCKOUTS WITH MORTAR.
ASSESSORS #20-86
PROPOSED AREA 2
8'x24' S.A.S
LtAUHIINU
UL I AIL: NOT TO SCALE
DORAN
TITLE REFERENCE:
I-
22.5'
PLAN REFERENCE:
PLAN
00 0 0 00 0 0 0 0 0 0 0 0
p o 0 0 0 000000,000,000,000 0 0 o 0 0 0 0
0 o
0 0 0 0
20
OR TRAVELED WAY SHALL BE SCHEDULE
PARCEL:
85
LOCATED WITHIN 150 FT. OF THE
RESIDENTIAL ZONE:
R-25
150' OF ANY KNOWN LEACHING FACILITY.
SETBACKS:
FRONT 30
00
SIDE
(2) LEACHING AREAS
CONFORMING TO THE FOLLOWING
REAR
20
MINIMUM LOT SIZE:
25,000 S.F.
GROUNDWATER
NONE
3 UNITS EACHHIGH
OVERLAY DISTRICT:
SIEVE </=6.0
50"
8'
THE CONTRACTOR SHALL BE RESPON-
SIBLE FOR PROPERLY LOCATING AND
COORDINATING THE PROPOSED CON-
ESO°0
DENSITY°°
AND THE APPLICABLE UTILITY
COMPANY AND MAINTAINING THE
EXISTING UTILITY SYSTEM IN SERVICE.
DIG -SAFE SHALL BE NOTIFIED PER
THE STATE OF MASSACHUSETTS
PVC ooPOLYETHYLENE
AT TEL. 1-888-344-7233. THE
INFILTRATOR 305°
THEIR ACCURACY OR THAT ALL
UTILITIES AND SUBSURFACE STRUCTURES
ARE SHOWN. LOCATIONS AND
ELEVATIONS OF UNDERGROUND UTILITIES
TAKEN FROM RECORD PLANS. THE
PIPE °
LOCATION AND INVERTS OF UTILITIES
AND STRUCTURES AS REQUIRED PRIOR
TO THE START OF CONSTRUCTION.
°
S. THIS SYSTEM IS NOT DESIGNED FOR
THE USE OF A GARBAGE GRINDER.
A GARBAGE GRINDER IS NOT
°o°Oo 000 00°0 °o °o°oO° °o° °0 00°0
0
FACILITY.
0°°o°
0 p
°°Oo
349 ROUTE 28, (UNIT D)
WEST YARMOUTH, MA 02673
(508) 778-8919
24.0'
SEWAGE DISPOSAL
SYSTEM UPGRADE
34 GLEN WOOD ST.
PLAN VIEW - LEACHING CHAMBERS
MASSACHUSETTS
LOAM & SEED DISTURBED AREAS
d
3' MAX.
COMPACTED
FILL 36" MAXIMUM 12"MINIM
M
MARK DORAN
34 GLENWOOD STREET
WEST YARMOUTH, MA 02673
DATE: 9/25/07
0 0 0o°p0o° °0°0 000 0°0
CHECK: M. DIBB
DRAWN: P. HAGIST
3" LAYER
TQ
DWG NO. 5156-04
HIGH 000 0
DENSITY
JOB N0.4-8211.00
PEASTONE
„
30" 24
0
POLYETHYLENE 00 0 O
000
EFFEC.
0 INFILTRATOR 3050 0 00 0
DEPTH
LEACHING
coo
00 CHAMBER 00
2 3" 50" 23"
3/4" - 1 1/2
WASHED STONE
NOTE:
EXISTING SEPTIC COMPONENTS
TO BE PUMPED, CRUSHED do
ABANDONED IN ACCORDANCE
WITH TITLE 5.
e ,
/ O BENCHMARK:
TOP OF CONCRETE BOUND
p^ / 0.4'/PR//OPOSED P0' W�\ ELEVATION=101.22
GAMASLABON 5
N
10
S \,g 4j L
1 �. \\, a• DECK `_2�
j ASSESSORS # Qe85
BULKHEAD
16,701± S Vis, �G1
0.38± ACS I APPROXIMA4E
/ J SEPTIC /
(� 2 STORY `~ , ` t LOCATION 4 CB�H
WOOD FRAME
\HOUSE #34
�I•� TOF=104.4 9 ?P
INV=(99.64 p. 0
00,
C3 N
o 'o' I UP CB/DH
.to a0. #Tp /�a�
ESSORS # 20-83 .4 Co
�t
O 4�
c������Q
V
JclLS/ oo 7
96"
OSS -SECTION OF CHAMBER
DESIGN CRITERIA:
DESIGN FLOW:
4 BEDROOMS AT110G.P.B./D 440 G.P.D.
REQUIRED SEPTIC TANK:
440 X 200% = 880 GAL.
SEPTIC TANK PROVIDED: = 1500 GAL.
SIZE OF LEACHING FACILITY REQUIRED:
DESIGN PERC. RATE: <2 MIN./ INCH
LONG TERM ACCEPT. RATE 0.74 G.P.D/S.F.
SIZE OF LEACHING FACILITY PROVIDED:
440 GPD + 0.74 SF/GPD = 595 S,F,
USE HIGH DENSITY POLYETHYLENE
(2 SETS) LEACHING CHAMBERS 8'X2'X24' _
SIDEWALL = 2(8'+24') X 2 = 128
BOTTOM = 8' X 24' = 192
320 S,F,
320 S,F, x 2 AREAS = 640 S,F,
640 S,F x 0,74 SF/GPD = 473 GPD
LOCUS INFORMATION
CURRENT OWNER:
MARK
DORAN
TITLE REFERENCE:
BOOK
21065, PAGE 281
PLAN REFERENCE:
PLAN
BOOK 9, PAGE 29
ASSESSORS MAP:
20
OR TRAVELED WAY SHALL BE SCHEDULE
PARCEL:
85
LOCATED WITHIN 150 FT. OF THE
RESIDENTIAL ZONE:
R-25
150' OF ANY KNOWN LEACHING FACILITY.
SETBACKS:
FRONT 30
IMPERVIOUS MATERIAL.
SIDE
15
CONFORMING TO THE FOLLOWING
REAR
20
MINIMUM LOT SIZE:
25,000 S.F.
GROUNDWATER
NONE
PASS No. 200
OVERLAY DISTRICT:
SIEVE </=6.0
7. EXISTING UTILITIES WHERE SHOWN
LOCUS PLAN: NO SCALE
r Q
O
GENERAL NOTES:
1. THIS PLAN IS FOR DESIGN AND
CONSTRUCTION OF THE SEWAGE
v�
' LOCUS �
Pik Alec n
FILE COPY
REVISIONS
NO. DATE DESCRIPTION
GENERAL NOTES:
1. THIS PLAN IS FOR DESIGN AND
CONSTRUCTION OF THE SEWAGE
DISPOSAL FACILITY ONLY.
2. ALL CONSTRUCTION METHODS AND
MATERIALS SHALL CONFORM TO MASS,
D.E.P TITLE 5 AND LOCAL BOARD
OF HEALTH REGULATIONS.
3. ALL PIPES LOCATED UNDER PAVEMENT
OR TRAVELED WAY SHALL BE SCHEDULE
40 OR EQUAL
4. THERE ARE NO KNOWN PRIVATE WELLS
LOCATED WITHIN 150 FT. OF THE
PROPOSED LEACHING FACILITY NOR
ANY KNOWN WELLS PROPOSED WITHIN
150' OF ANY KNOWN LEACHING FACILITY.
5. WITHIN LIMIT OF EXCAVATION REMOVE
ALL TOPSOIL, SUBSOIL AND OTHER
IMPERVIOUS MATERIAL.
6. REPLACE WITH CLEAN WASHED SAND
OR OTHER CLEAN GRANULAR SOILS
CONFORMING TO THE FOLLOWING
SIEVE ANALYSIS:
10% (MAX) BY WT. SHALL
PASS No. 50 SIEVE
<10 % OF No. 4 SIEVE SHALL
PASS No. 100
<5 % OF No. 4 SIEVE SHALL
PASS No. 200
UNIFORMITY COEFFICIENT 0 No. 4
SIEVE </=6.0
7. EXISTING UTILITIES WHERE SHOWN
IN THE DRAWINGS ARE APPROXIMATE.
THE CONTRACTOR SHALL BE RESPON-
SIBLE FOR PROPERLY LOCATING AND
COORDINATING THE PROPOSED CON-
STRUCTION ACTIVITY WITH DIG -SAFE
AND THE APPLICABLE UTILITY
COMPANY AND MAINTAINING THE
EXISTING UTILITY SYSTEM IN SERVICE.
DIG -SAFE SHALL BE NOTIFIED PER
THE STATE OF MASSACHUSETTS
STATUTE CHAPTER 82, SECTION 409
AT TEL. 1-888-344-7233. THE
ENGINEER DOES NOT GUARANTEE
THEIR ACCURACY OR THAT ALL
UTILITIES AND SUBSURFACE STRUCTURES
ARE SHOWN. LOCATIONS AND
ELEVATIONS OF UNDERGROUND UTILITIES
TAKEN FROM RECORD PLANS. THE
CONTRACTOR SHALL VERIFY SIZE,
LOCATION AND INVERTS OF UTILITIES
AND STRUCTURES AS REQUIRED PRIOR
TO THE START OF CONSTRUCTION.
S. THIS SYSTEM IS NOT DESIGNED FOR
THE USE OF A GARBAGE GRINDER.
A GARBAGE GRINDER IS NOT
RECOMMENDED DUE TO RECOGNIZED
ADVERSE IMPACTS TO THE LEACHING
FACILITY.
349 ROUTE 28, (UNIT D)
WEST YARMOUTH, MA 02673
(508) 778-8919
PROJECT TITLE:
SEWAGE DISPOSAL
SYSTEM UPGRADE
34 GLEN WOOD ST.
W. YARMOUTH,
MASSACHUSETTS
d
r �
,f
PREPARED FOR:
MARK DORAN
34 GLENWOOD STREET
WEST YARMOUTH, MA 02673
DATE: 9/25/07
COMP. DESIGN: K. HEALY
CHECK: M. DIBB
DRAWN: P. HAGIST
FIELD: GPH/DPG
FILE NO. 8211-SEP.DWG
DWG NO. 5156-04
SHEET 1 OF 1
JOB N0.4-8211.00