Loading...
HomeMy WebLinkAbout54 Grandview Drive - Hydrographic PlanI ynnmo� 1 E,Y/ST!,v G D tvF-!L xivG - EX/ STiN G tAU ti�FNT FL — ... _",�•.-_ _�_ ^'—"i".r'�==2.'?:=+. __+. -mac-.��c-: --.. STILT .� I l CC7PS TqL L'E�GH j , 20 /D I /0 f'1�;/✓ sC�L c hx5' /l?OPOSE7 1E t., g-� T- 7- 5'3' s' 7-f I>'� 411 .5 r i v 0 Y2 - F[DC.0 El r j f ! 2 CC) S. i. - F'EriETh�eF,v , O /0 20 30 40 _ 50 60 70 60 z"x 46CA,- op apGp21 �y .2 AP ; r fr ..49� I} —_ I. 2•.x_�..l�/G'R/o!L 3e9"sia•r .yi`{ {C: 3 3"xE?'" rrs/hit FE`S E/l BOLTS "fr}" Cj 3"Y 8"-SpLlTGs,P " _ 1 �8 s /1N liv, a' f LET? e�7[E To n<T rr>AR S'f{ I I� . �/✓D SG�aLE } GENERAL NOTES 1. PLAN REFERENCE: LAND COURT PLAN 17002 B, LOT 7; LOT LINE, TOPOGRAPHY AND OTHER 6. ALL HARDWARE USED FOR CONSTRUCTION SHALL BE HYDROGRAPHIC PLAN 80 OF HOT DIP GALVANIZED STEEL OR EQUAL. a�oP. /6• nnmP �'w. SHOWING BREWSTER, MA. WITH HYDROGRAPHIC AND TIDAL YARMOUTH CONSERVATION COMMISSION PROPOSED PIER, RAMP AND FLOAT f Clo. FL !'s9 T INC. S. DECK PLANK SPACING SHALL BE A MINIMUM OF V2 INENGINEERING, 2. ELEVATIONS REFER TO AILW = 0.0. CONTACT CAPE INCH. BASS .RIVER COD ENGINEERING INC FOR ADDITIONAL BENCHMARK 9. CONSTRUCTION MATERIALS AND DEBRIS SIiALL NOT 54 GRANDVIEW DRIVE, SOUTH YARMOUTH, MA INFORMATION. BE STORED OR DISCARDED ON THE BANK OR BEACH. 3. CONSTRUCTION ACCESS SHALL BE PRIMARILY BY THE THE BEACH AND BUFFER ZONE SHALL BE COMPLETELY PREPARED FOR RIVER WITH LIMITED ACCESS DIRECTLY THROUGH CLEARED OF ANY DEBRIS ON A DAILY BASIS. ' RONALD R. JR. AND JUDITH A. PARISEA U .PFI!/✓G'v/xyFD THE PROPERTY. /l?OPOSE7 1E t., g-� T- 7- 5'3' s' 7-f I>'� 411 .5 r i v 0 Y2 - F[DC.0 El r j f ! 2 CC) S. i. - F'EriETh�eF,v , O /0 20 30 40 _ 50 60 70 60 z"x 46CA,- op apGp21 �y .2 AP ; r fr ..49� I} —_ I. 2•.x_�..l�/G'R/o!L 3e9"sia•r .yi`{ {C: 3 3"xE?'" rrs/hit FE`S E/l BOLTS "fr}" Cj 3"Y 8"-SpLlTGs,P " _ 1 �8 s /1N liv, a' f LET? e�7[E To n<T rr>AR S'f{ I I� . �/✓D SG�aLE } GENERAL NOTES 1. PLAN REFERENCE: LAND COURT PLAN 17002 B, LOT 7; LOT LINE, TOPOGRAPHY AND OTHER 6. ALL HARDWARE USED FOR CONSTRUCTION SHALL BE HYDROGRAPHIC PLAN SITE DATA OF HOT DIP GALVANIZED STEEL OR EQUAL. _ L PREPARED BY OUTERMOST LAND SURVEYING OF x 7. ALL TIMBER USED SHALL BE CONSISTENT WITH SHOWING BREWSTER, MA. WITH HYDROGRAPHIC AND TIDAL YARMOUTH CONSERVATION COMMISSION PROPOSED PIER, RAMP AND FLOAT DATA DETERMINED AND PROVIDED BY CAPE COD REQUIREMENTS. INC. S. DECK PLANK SPACING SHALL BE A MINIMUM OF V2 INENGINEERING, 2. ELEVATIONS REFER TO AILW = 0.0. CONTACT CAPE INCH. BASS .RIVER COD ENGINEERING INC FOR ADDITIONAL BENCHMARK 9. CONSTRUCTION MATERIALS AND DEBRIS SIiALL NOT 54 GRANDVIEW DRIVE, SOUTH YARMOUTH, MA INFORMATION. BE STORED OR DISCARDED ON THE BANK OR BEACH. 3. CONSTRUCTION ACCESS SHALL BE PRIMARILY BY THE THE BEACH AND BUFFER ZONE SHALL BE COMPLETELY PREPARED FOR RIVER WITH LIMITED ACCESS DIRECTLY THROUGH CLEARED OF ANY DEBRIS ON A DAILY BASIS. ' RONALD R. JR. AND JUDITH A. PARISEA U THE PROPERTY. .: 10.RAMP AND FLOAT REMOVAL SHALL BE ATA SUITABLE t of 4. THE EXISTING STAIRS AND SHORT PIER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF OFF-SITE LOCATION. THE FLOAT SHALL NOT BE �' oy ERT APRIL 15, 2006 SCALE - AS NOTED ACCORDANCE WITH APPLICABLE SOLID MATERIAL E STORED ANYWHERE WITHIN THE RESOURCE AREAS OR THE BUFFER ZONE ON THE PROPERTY. � P R y PREPARED BY DISPOSAL PROCEDURES I LREFER TO ANY ORDER OF CONDITIONS ISSUED FOR c L B o CAPE COD ENGINEERING INC ' 5. EXCAVATION SHALL BE LIMITED TO THAT NECESSARY THIS PROJECT. BY THE YARMOUTH CONSERVATION 9 FO/ �ER��� ROBERT I P.E. FOR PILING INSTALLATION. WHERE NAVIGABLE COMMISSION AND OTHER PERMITTING AGENCIES FOR BOX151PERRY, L Ewe '' P.O. BOX 1517 WATER ALLOWS, PILINGS SHALL BE HAMMER DRIVEN. CONSTRUCTION SCHEDULE, USE PROCEDURES AND EAST nENN'IS, MA 02641 MINIMUM PILING EMBEDMENT DEPTH SHALL BE 12 FT. GUIDELINES. RF1. 9-7.06 vi FrPiEit' toc. 508-385-1445