Loading...
HomeMy WebLinkAbout920 Great Island Road Title V Site PlanLEN 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION o- 00 -o PROPOSED CONTOUR -100 - EXISTING CONTOUR N SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED ) DESIGN FLOW: 5 BEDROOMS (110 GPD) = 550 GPD USE A 550 GPD DESIGN FLOW SEPTIC TANK: 550 GPD" (2 = 1100 USE A 1500- GALLON SEPTIC TANK LEACHING: SIDES: 2(69.5 + 8.83) 2 (60) = 188 BOTTOM: 69.5 x 8.83 (.60) = 368 TOTAL: 927 S.F. 556 SPD USE (10) H-20 HIGH CAPACITY INFILTRATORS WITH 3' STONE AT SIDES, 3,5' AT ENDS AND 14" UNDER ger PROVED DA'T'E BOARD OF HEALTH MA +51 20.34 TOP FNDN = ELEV. 22.5' SYSTEM PROFILE ACCESS COVER TO WITHIN 6" OF FIN. GRADE - {NOT TO SCALE) ACCESS COVER (WATERTIGHT) TO ZO MINIMUM ,75' OF COVER OVER PRECAST WITHIN 6" OF FIN. GRADE 2% SLOPE REQUIRED OVFR SYCTcu s 18.5' RUN PIPE LEVEL 2' DOUBLE WASHED PEASTONE PROPOSED 1 00 -FOR FIRST 2' \ 17 25' SLED 17.0' TANK (H- 10) TEE GAS 14.5' MIN BAFFLE 14.87' '��"� 14.70' 2 (-_._.Y"' SLOPE) �6" .CRUSHED STONE OR MECHANICAL gQ 2 4' COMPACTION. (15.221 [2D 088 74' ogg DEPTH OF FLOW m (2� SLOPE) TEE SIZES: 3/4" TO 1 1/2" DOUBLE WASHED STONE INLET DEPTH = 10" OUTLET DEPTH 14" 17.0' - 18, 15.0' 3' O SIDES 3.5' O ENDS 12.5' FOUNDATION- 22 6.6T --- SEPTIC TANK 10' D' B LEACHIN 2J / +79 36. 05 +50.71 +50 1 ' 21.09 / . PROP. WELL FRO 16, / 0 +53 18 2, •QQ 21.46 - ) -------- 4218.46 --_-- 49 __+21009`f_1 2j \�O i +7$/ 47 1✓S79. ! - 1 +2224 �y+q�E +91.58 \ \ 19 _ \ +21 5 (+461 +,�2 39 7"OAK ,� r \ `� '_. __. +21.63 ` `\ , ��� 1 +0.0 \ 12' 091 N ` 14"FINE \i N 6 D 7 0.00 AKS �,\ 21� +20 `\ +8a (� +ab / / 23.17 +92 .28 21.75 \ G 1.67 / Y /� EXISTING SHED N \ - -� ^ �4, j 19 i Off\ v + RE -LOCATED E 10" OAK ' /' O>, �4O 1�\ OAK / +2 5 /'r' Q / 6z a 8" PIN d2 / 19.42 1 n OAK 67 +55 �.� `_ PROP. DWELL. +21. +18.36 /+2 TOP FNDN a 22.5' 11.x/ psi COMMON �Q . $� AREA ; c) +112 00 - TM 85 18.97 / +07000 6894 +22.35 , I' 42 / �R�'' 14" OAK 6002 . 69 !9 +19.29 / ,9 \ +20.5, +21 ' p 5' REMOVAL OF UNSUITABLE SOIL V' 8 \ REWIRED AROUND PERIMETER OF LEACH 15.03 ,� +2983 / , FACILITY, DOWN TO SUITABLE SOIL LAYER (C7). REPLACE WITH CLEAN MED. SAND. / ENGINEER TO INSPECT AND CERTIFY 59 of REMOVAL 41 s 6.13 I / +16.82 � LrJ /' +35 ,Q \ 17.79 13 17 ' 11 UTILITY o.00 +5826 CLUSTER 7 40 ELEC.& --- + o v.oz / +? .sa +40 k 0 TEL. 7 I LOT 83 +�17 HIGH POINT----�.�+16.56 �°8r 0'Oo' �' 87127± SF 34 16.15 �19+30.12 . \ 37 10 14,00 200 +2 , +36.6, COMMON -9T \ +3a AREA 95T 'giyO \ 90. '1"O \`\ 13.84, qp .� \ QB, FND BENCHMARK 1 -. 93-305 zz ELEV.= 12.2 � 10.84 OX 0 _4 G FACILITY V78 a 78 3 1!1 5,83' Of O Z' � >kz X36 150 'A 13 43 O , i �z'$ 0 ? 2 ' , 99 4.19 , i , , , - ..�96 0 Loo 20.29 +9 213,69 +76 zo.59 63 2.55 3 +94 1+22A6 22.51 86 +23.47 TEST HOLE LOGS ENGINEER: RICK JUDD, RS, SE WITNESS: AMY VON HONE B DATE: 11/29/00 PERC. RATE = < 5 MPI IN TH1; < 8 MPI IN TH2 CLASS -21 -SOILS P# GREAT ISLAND ELEV. Q ELEV., LOM p.. 18_5' p.. 17.5' 417. 0 4 4 LOCATION A/E A/E MAP NTS LFS LFS 8" 10YR 5/3 ASSESSORS MAP 3 PARCEL 10.1 10YR 4/2 16„ ZONING DISTRICT: R 87 :1OYR:5j/6l,5.1-7,'BWFRONT YARD SETBACKS: 40" = 30'* LS SIDE = 501* Cl 46" 10YR 5/6 13.67' REAR = 75'* PERC LS Cl PLAN REF, - LCP 4075 K, SH 2 10YR 5/4 PERC LS FLOOD ZONE: C /CLODS/LAYE S 10YR 6/6 OF LS WITH FINES /CLODS/LAYE S * THESE SETBACKS VARIABLE 122" 8.33' 126" OF LS WITH FINES 7.0' PURSUANT TO CLUSTER DEVELOPMENT ZONING C2 C2 BY-LAW. BUILDER/OWNER TO MED/COS MED/COS CONFIRM SETBACKS WITH BUILDING COMMISSIONER PRIOR ' 138" 2.5Y 6/6 7,0' 140" 2.5Y 7/3 5.83' TO ANY CONSTRUCTION a NO WATER ENCOUNTERED NOTES: 1. DATUM IS NGVD 2, MUNICIPAL WATER IS NOT AVAILABLE 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H- 10 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6, CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS, ENVIRONMENTAL CODE TITLE V. 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING, 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC, C:�IJ,P{:iJEiJTS NV I 1`0 BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. CONT 10 LOCATION OF ALLLL BE UNDERGRO ND RESPONSIBLE & OVERHEADFYING UTILITIES EPRIOR TO COMMENCEMENT OF WORK, 11. NO KNOWN POTABLE WELLS WITHIN 150' OF LEACH FACILITY TI TLE 5 S/TE PLAN pF #920 GREAT ISLAND ROAD IN THE TOWN OF: (WEST) YARMOUTH PREPARED FOR: PHYLLIS DETWILER SCALE: 1" = 30' DATE: DECEMBER 5, 2000 1" IN 4/�,� , `H DF god ARNE y�3, �3 ARM E H. 0, ALA m� C. 261,4412 VIL h 30792 ARYIFls' "H: "OJAL L,tN s, DATE A ti O71 508-362-4541 fm 508 362-9880 down cape engineering, Inc. CIVIL ENGINEERS LAND SURVEYORS 939 main st, yarmouth, ma 02675