Loading...
HomeMy WebLinkAbout230 Great Western Road Site and Sewage PlanLOCUS 7 cps„ dpN 'Qd g IL $1G48� LOCATION MAP LOT 14 30,000 ± S.F. (0.69 -47-AC) N ASSESSORS MAP. 81 PARCEL: C 14 CURRENT ZONING: R-20 (1977 SUBDIVISION) BUILDING SETBACKS: F: 30' S: 20' R: 20' FLOOD ZONE: -C 3 PRECAST 500 GALLON CHAMBERS8S x 4B' s 2' DEEPJ WITH X OF STONE ALL AROUND. 31S x 10.8'x 2 DEN) (4' PVC PIPE TO BE USED BETWEEN CHAMBERS) AS ` co g gp ' 32 . _ ........ 36- - - .• ' 98 9 Z gE9� 0 m .o BENCHMARK AT t O. i / CONCRETE BOUND ELEVATION = 432 �i 3g 2 o S�PAVE g� A� '1a GUY POLE k'1 3 1 0 KEY. EXISTING CONTOUR: - - - - PROPOSED CONTOUR: .............................. EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 TEST HOLE:4 UTILITY POLE: -O FENCE LINE: - HYDRANT: -6 RETAINING WALL: DM # 98-156 D30F� - - ' gb - - 0 sg p gg. / / go AD MI TEST HOLE LOGS NOTES: 1. VERTICAL DATUM. FROM QUAD (NGVD +/-) ENGINEER: THOMAS McLELLAN, P.E. _ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. WITNESS: AMY VON HONE, R.S. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. DATE: 10-8-98 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 PERCOLATION RATE: < 2 MIN/IN LOADING SPECIFICATIONS. 5. PIPE PITCH= 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). TH-1 34.0 TH-2 as.0 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 0/A/E HORIZON LO SAND ELEV. o/A/E HORIZON ELEV. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE Y tOYR 3/2 83,4 ff LO SAND 1OYR 3/2 USE OF A GARBAGE DISPOSAL. 351 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE B HORIZON LOAMY SAND B HORIZON LOAMY SAND STATE OF MASS. ENVIRONMENTAL CODE TITLE FIVE AND LOCAL ( ) 36' fOYR 5/8 silo s0" IOYR 5/8 38B HEALTH REGULATIONS. C HORIZON C HORIZON 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR AfE2.5Y 14 SAND MEDIUM.4 SAND TO CONSTRUCTION. 10. GROUND COYER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0. 120• NO GROUNDWATER ENCOUNTERED (NO GROUNDWATER ENCOUNTERED ON LOT 11 AT ELEVATION - 12.0) SEPTIC SYSTEM DESIGN FLOW ESTIMATE: � BEDROOMS AT 110 CAL/DAY/BEDROOM = 330 GAL/DAY SEPTIC TANK: 330 GAL/DAY x 2 DAYS = 660 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 3 PRECAST 500 GALLON CHAMBERS (8.5' x 4.8' x 2' DEEP) WITH 3' OF STONE ALL AROUND. (31.5' x 10.8' x 2' DEEP) SIDE AREA 142.3') 2 x 2 = 169 SF (.74) = 125 GAL/DAY BOTTOM AREA: 31.5'x 10.8'= 340 SF (.74) = 252 GAL/DAY CAPACITY = 377 CAL/DAY SEPTIC SYSTEM SECTION COVERS WITHIN 12' OF 40.0 FINISHED GRADE TOP OF FOUNDATION (ONE COVER WITHIN C OF FINISHED GRADE 77 77 77 30.75 1500 GAL ELEV. SEPTIC TANK 31.0 (6" OF STONE UNDER OR ELEV. MECHANICALLY COMPACTED) (UNDER SLAB) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN DEMAREST-McLELLAN ENGINEERING 24 SCHOOL STREET PO. BOX 463 WEST DENNIS, MASSACHUSETTS 02670 PHONE # FAX : (508) 398-7710 90M�joxim WALK -OUT DECK60, PROPOSED 24' 3 BEDROOM DWELLING 26' GAR. 14' 16' 19.51 10.51 PROPOSED DWELLING 2" PEASTONE 3/4" -1 V2 - WASHED STONE ELEV. 29.0 30.5 L ELEV.ZL30.17 D -BOX ELEV. 2g 2 E-� e e. 262 E-> ELEV. 30.34 (6" OF V. 3' 3' ELEV. STONE E 31.5' UNDER) USE 3 PRECAST 500 GALLON CHAMBERS (8.5' x 4.8' x 2' DEEP) GAS BAFFLE WITH X OF STONE ALL AROUND. (31.5'x 10.8' x Z DEEP) AT OUTLET TEE (4" PVC PIPE TO BE USED BETWEEN CHAMBERS) DATE: a3 THOMAS MCLELLAN, P.E. �j JOHN Z. DEMAREST JR., SITE AND SEWAGE PLAN LOCATION.' 230 GREAT WESTERN ROAD SOUTH YARMOUTH, MA PREPARED FOR - REEF REALTY SCALE: 1" = 30' DATE: 10/29/98 REFERENCE: PLAN BOOK 395 PACE 50