Loading...
HomeMy WebLinkAbout142 Great Western Road Proposed Septic Design 3TDP OF FOUNDATION ELEV. _ 11)0.0 (ASSUMED) ��� 4" CAST IRON PIPE PARC EQUAL) PER MUU�M LEV.-3" ELEV. - `T7•2, If IT r:rl!ltl�l CLEAN SAND 4" SCHEDULE 40 PVC PIPE LOAM AND SEED TEXTURE MIN. PITCH 1/S" PER FT. MO . 2" LAYER OF 0-7 /??T 1/b" TO 1/2" 4 RE:OLRRED SEPTIC TANK CAPACITY71 GAL S WASHED STONE N, OTTRECVIRED SWEETSER ENGINEERING 235GREATWESTERN ROAD 508- P. 0. 8% 713 398-3922 SOUTH DENNI . MASS. 0200 DESIOH PFRCMATION RATE 1CONCRETE LEACHING AREA17SOL FT.LFA iot / 3` y CHMG CAPACITY (AREA k RATE) M/IDAY ANCHOR "-TIN. 95,3 BNE V. DISTRIBUTION�y�"" BOX -J TO BE WATER TESTED 1000 GALLON IF MORE THAN ONE OUTLET SEPTIC TANK (TO BE PLACED ON FIRM BASE) /t 3/4" TO 1 1/*--)�� �F 5 ) WASHED STONE SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE `k i t Yt ! t v' I'y; pv 'I t €fix sR esti 10" •EXV. e 7V '7 ti MGH WA TNONE i►NH LTR TORS WM4 G Ij ><YTRENCH FORMATION WEII / n SOIL ABSORPTION WELL N /1 SYSTEM (SAS) Aon USGS PROBABLE WATER TABLE ELEV. - OBSERVED WATER TABLE ( / / ) a". - BOTTOM OF TEST HOLE ELEV. - go 7 _Y\ ,I' / t zy, ter,; • ' _' �v OF 1 T. A. la DUMAS l" tio. •t9 LEGEND: EXISTING SPOT ELEVATION 00„0 DDOSTING CONTOUR----00---- FINAL SPOT ELEVATION FINAL CONTOUR SOIL TEST LOCATION UTILITY POLE -0- TOWN WATER —WSW CATCH BASIN (®/ CLEAN GAS NO OUT C� CESSPOOL C.P.0 SOIL TEST DATE OF SOIL TEST F vb v $ f1 A99 SOIL TEST DONE BY ✓6GNU Wt7NESSEDBY K wvc s OBSERVATION HOLE 1 =V- 97-49 PERCOLATION RATE G Z WANCH AT - DEPTH I HORIZI TEXTURE COLOR MO . 0 0-7 togr.Y t (� 4 RE:OLRRED SEPTIC TANK CAPACITY71 GAL ACTUAL SIZE OF SEPI TANK L s,g, I> SWEETSER ENGINEERING 235GREATWESTERN ROAD 508- P. 0. 8% 713 398-3922 SOUTH DENNI . MASS. 0200 DESIOH PFRCMATION RATE 7-0 LEACHING AREA17SOL FT.LFA iot / 3` y CHMG CAPACITY (AREA k RATE) M/IDAY 62_,C13 RESERVE LEACHING CAPACITY N CAL/DAY NOTES: JOB N0. . r� 1. ALL WORIOAANSHIP AND MA ALS SMAII CONFORM TO D.E.P. 14e7tr04 (Dy2o REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. fo."rr 2711 WITHIN e" OF FINISHED GRADE �; 3. ALL COMPONENTS OF THE SANITARY SYSTEM SMALL .BE CAPAM OF . CA�l/32as WnHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHM rp USED UNDER OR WM41N 10 FTI OF DRIVES OR PARION0 AREAS. i'. S j - /Jo WATER ENCOUNTERED AT /Ze OV , DESIGN - CALCULATIONSf �$ NUR?SF7t of BEDROOMS � � � '' GARBAGE DISPOSAL UNIT .��. KSL. TOTALESTIMATED D W GAL//DDAY BR.X ETR.) OAL./bAY 4 RE:OLRRED SEPTIC TANK CAPACITY71 GAL ACTUAL SIZE OF SEPI TANK _CAL SOIL CLASSIFIMIM SWEETSER ENGINEERING 235GREATWESTERN ROAD 508- P. 0. 8% 713 398-3922 SOUTH DENNI . MASS. 0200 DESIOH PFRCMATION RATE EFFLUENT LOADING RATE CAL/DAY/V. LEACHING AREA17SOL FT.LFA ; 3` y CHMG CAPACITY (AREA k RATE) M/IDAY 62_,C13 RESERVE LEACHING CAPACITY N CAL/DAY NOTES: JOB N0. . r� 1. ALL WORIOAANSHIP AND MA ALS SMAII CONFORM TO D.E.P. TITLE S AND THE TOWN OF Y441'o RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2- ALL COVERS TO SANITARY UNITS SHALL BE BROVCHT, TO WITHIN e" OF FINISHED GRADE R`ED 3. ALL COMPONENTS OF THE SANITARY SYSTEM SMALL .BE CAPAM OF . r< WnHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHM 10 FT. OF DRIVES OR PARIONG AREAS. M-20 LOADING SHALL. DE USED UNDER OR WM41N 10 FTI OF DRIVES OR PARION0 AREAS. i'. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SMALL. .. BE MORTARED IN PLACE. S. NO DETERMINATION HAS BEEN MADE AS TO COIMANCE %M ;. DEEDED OR ZONING REGULATIONS. OWNER I APPLICANT IS TO ' OBTAIN SUCH DETERMINATKIN FROM'APPROPRIATE /WTHORw, s. UTLrno SHOM'N ARE APPROXIMATE ONLY, MMVAIION CONTfCRCR%t IS TO CALL "DIC -SAFE" AT 1-889-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON snt 7. CONTRACTOR IS 11) VERIFY`ORAD$S AND -MA'fl 6 A3 11wu XS . SITE CONDITIONS PRR1R TO COMMENCING WOW ON SITE. ANY VARIATM '. IS 1O BE BROUGHT' TO THE ATTEHTON OF THE DESICH ENGINEER u IMMEDIATELY. , S. PARCEL IS IN FLOOD ZONE 9. LOT IS SHOWN ON ASSESSORS MAP A� PARCEL �/- 3 x' ... 10. E70STING ptY ' /S TO BE PUMPED AND RE�odtt� wT APPROVED: BOARD OF HEALTH. DATE AGENT 0 1999 SWEE75ER ENGiNF.ER1htC { [ , j T Ci Q. wcs''AN �Dn M1. 7 PROPOSED SEPTIC DESIGN ' : FORNowJ PROJECT LOCATION �/T z Y✓� %�'K.J iC t f SWEETSER ENGINEERING 235GREATWESTERN ROAD 508- P. 0. 8% 713 398-3922 SOUTH DENNI . MASS. 0200 DA'IF4Ldy� 26 , 1999 SCALE REVISED JOB N0. . r� LOCATION MAP R`ED SHEET/ / OF 0 1999 SWEE75ER ENGiNF.ER1htC { [ ,