Loading...
HomeMy WebLinkAbout8 Grouse Lane - Sewage Disposal System Repair with Addition 2EST. SOIL TEST PIT DATA: TEST PIT -#1- GRD. EL. 81.2 FIICihI VYY. BOX DETAIL: TOP OF FOUNDATION 81.67 LOAMY SPIND 4" INVERTII AT BUILDING 10YR 4 3 81 ADD 4 BAND S.S. CONN. 4" INVERT AT ADDITION 1 82 4" INVERT AT SEPTIC TANK (IN) 77.70 C 4" INVERT LOAMY SND 77.45 10YR 5 6 4" INVERT AT DIST. BOX (IN) 77.27 ' EL = 78.7 77.10 MEDIUM SAND 10YR 7/3 FL=69.7 - 1 DATE: 10/10/07 TEST BY: THE BSC GROUP, INC. 3" WITNESSED BY: AMY VON HONE PERC. RATE: 2 MIN./INCH SOIL EVALUATOR {0" MARK DIBB SOIL CLASS: 1 L.T.A.R. 0.74 G.P.D./SQ.FT. 38" INDICATES PERC. TEST INDICATES ® UNSUITABLE MATERIAL OCTOBER 10, 2007 HIGH GROUNDWATER COMPUTATION BASED ON TP#1 DEPTH TO BOTTOM OF HOLE 11.5 INDICATES y ESTIMATED SEASONAL HIGH GROUND WATER INDICATES y OBSERVED GROUND WATER DATUM: VERTICAL DATUM: ASSUMED BENCH MARK SET: TOP OF CONCRETE FOUNDATION ELEVATION 81.67 PROFILE: NOT TO SCALE EL= A TOP FOUNDATION CONCRETE COVERS TO WITHIN EL= 81.00 6" OF FINISHED GRADE. l l •-Uo -la FIRST PIPE LENGTH TO BE SET LEVEL FOR MIN. 2' FINISH GRADE EL -80.7-8 4" PVC SCH 40 10'-610 u -E LJ 4' 31'-B2 I=D I=G � B C i=E H 5 OUTLET I=� mid DIST. BOX 5.3' SEPARATION SEPTIC TANK EST. HIGH GROUNDWATER J INVERT ELEVATIONS: BOX DETAIL: TOP OF FOUNDATION 81.67 A 4" INVERTII AT BUILDING 79.97 81 ADD 4 BAND S.S. CONN. 4" INVERT AT ADDITION 78.70 82 4" INVERT AT SEPTIC TANK (IN) 77.70 C 4" INVERT AT SEPTIC TANK (OUT) 77.45 D 4" INVERT AT DIST. BOX (IN) 77.27 E 4" INVERT AT DIST. BOX (OUT) 77.10 F STONE BASE INVERTS AT LEACHING FACILITY: 3' MAX. 4" INVERT AT BEGINNING COMPACTED FILL 36"1 IMAXIMUM,12"MINIMUM OF LEACHING CHAMBER 77.00 G BREAKOUT 77.50 9,399± S.F. ELEVATION AT BOTTOM 00 0 000 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 OF LEACHING CHAMBER 75.00 H 0 00 00 0 000 0 0 0 0 0 NO OBSERVED GROUNDWATER FINISHED GRADE NOT A ZONE II BOTTOM OF HOLE 69.7 J VARIANCES REQUESTED: TI TLE 5: (1.) TO ALLOW THE LEACHING FIELD TO BE 16.0' FROM THE NEW FULL FOUNDATION WALL IN LIEU OF 20' (2.) TO ALLOW THE SEPTIC TANK TO BE 6.1' FROM THE NEW FOUNDATION WALL IN LIEU OF 10' (3.) TO ALLOW THE LEACHING FIELD TO BE 8' FROM THE PROPERTY LINE IN LIEU OF 10' FLOOR PLANS: SEE ATTACHED ARCHITECTURAL PLANS I SEPTIC TANK DETAIL: 1,500 GALLON NOT TO SCALE NOTES: 1. SEPTIC TANK SHALL BE STEEL 5. INLET AND OUTLET TEES TO BE CAST IRON, REINFORCED CONCRETE. SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE. 2. SEPTIC TANK TO WITHSTAND H-10 LOADING TEES TO BE CENTERED UNDER MANHOLE COVER. UNLESS UNDER PAVEMENT, DRIVES OR TRAVELED WAYS, WHEREIN H-20 LOADING SHALL APPLY. 3. ALL PIPE CONNECTIONS AND CONCRETE 2-24" DIA CONCRETE MANHOLES CONSTRUCTION SHALL BE WATERTIGHT. W METAL HANDLES BROUGHT 4. FILL ALL UNUSED KNOCKOUTS WITH Tb 6" OF FINISH GRADE MORTAR. TEE TO BE UNDER 12" MIN. M.H. OPENING W RAISE TAM.W/ ► 10'-6* SEWER BRICK e: • ' �•e :: AV, • &MORTAR10'-0 NORMAL WATER e 3" PRECAST SEPTIC TANK a 10' 14" INLET TEE -S 5 O 5'-2" 4'-6" a MIN. 90r am ON LIQUID 5'-8" QUID DEPTH cis caflmaJ i • e•--••- a ee•:' n BOTTOM ON LEVEL STABLE BASE Ao a { PLAN VIEW 6' MIN. 3/4" ro ��'���4W- 1 1/2" STONE CROSS-SECTION VIEW LOT #51 DISTRIBUTION BOX DETAIL: NOT TO SCALE LEACHING DETAIL: NOT TO SCALE 4" BOTTOM 6" MIN. 3/4" TO BOX TO BE LAID LEVEL 458.6 S.F x 0.74 GPD/SF = 339GPD rj 4" PVC PIPE 3. ALL PIPES LOCATED UNDER PAVEMENT D-BOx BLE BASE 1 1/2" (BRUSHED 4. ALL PIPE CONNECTIONS AND CONCRETE PLAN REFERENCE: L.C. PLAN 32827-A, SH -3 ASSESSORS MAP: 58 N0. OF OUTLETS 396 CROSS-SECTION STONE BASE CONSTRUCTION SHALL BE WATERTIGHT. 3' MAX. SIDE 15' COMPACTED FILL 36"1 IMAXIMUM,12"MINIMUM MINIMUM LOT SIZE: 25,000 S.F. EXISTING LOT AREA: 9,399± S.F. EX. LOT COVERAGE: 00 0 000 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 1,896± S.F. (20.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 00 0 000 0 0 0 0 0 3" LAYER FINISHED GRADE NOT A ZONE II FEMA FLOOD (0.075 mm EFFECTIVE "PARTICLE SIZE) ZONE DISTRICT' c c fs PORT PANEL #250015 0004 C COORDINATING THE PROPOSED CON- 000 AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER 0 00 0 0 STATUTE CHAPTER 82, SECTION 409 AT TEL 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE 'EMOVABLE UTILITIES AND SUBSURFACE STRUCTURES 2" WAS NOTES: TAKEN FROM RECORD PLANS. THE c c OBS. O AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. o ° 0 THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED 000 • 50 98 OVER �o:A a ;; 2. CONFIRM LOCATION & NUMBER OF INVERTS. 1. DIST. BOX TO WITHSTAND H-10 LOADING ANY FIELD CHANGES THAT MAY BE REQUIRED. 00° 349 Main Street, (RT. 28) Unit D W. Yarmouth Massachusetts 4 UNI S HIGH DENSITY PROJECT TITLE: DESIGN FOR ° o ° ° SYSTEM REPAIR WITH r ZhL ffu GROUSE LANE ,WEST YARMOUTH UNLESS UNDER PAVEMENT, DRIVES OR TRAVELED WAYS WHEREIN H-20 LOADING PREPARED FOR: SCOTT BUCKLEY o°o POLYETH ENE INFI TRATOR 3050 o°oo ° ° °O °o°o o° oo° °o° °o°o o° oo° °o°0 000 0 °o °0 0°00 COTUIT, MA 02648 SCOTT.WB®LIVE.COM (508) 367-2530 1 COMP. DESIGN: K. HEALY CHECK: M. DIBB DRAWN: K. HEALY FIELD: D. GAZZOLO / N. MERCIER FILE NO. 9283-SEP.DWG SHALL APPLY. SHEET 1 of 1 JOB NO. 4-9283.00 6" •. 5,5" OUTLETS: 8" 2. PROVIDE INLET TEE OR BAFFLE WHERE SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR 15 15' 2' 15' 35' 1.5' IN PUMPED SYSTEM. PLAN VIEW - LEACHING CHAMBERS 3"eaig' FACILITY PROVIDED: L-- 2" 3. FIRST TWO FEET OF PIPE OUT OF DIST. POLYETHYLENE LEACHING CHAMBERS(4 UNITS) 8.17'X2'X35' SIDEWALL = 2(8.17'+35') X 2' = 172.68 4" BOTTOM 6" MIN. 3/4" TO BOX TO BE LAID LEVEL 458.6 S.F x 0.74 GPD/SF = 339GPD D.E.P TITLE 5 AND LOCAL BOARD LOAM & SEED DISTURBED AREAS 3. ALL PIPES LOCATED UNDER PAVEMENT CURRENT OWNER: BLE BASE 1 1/2" (BRUSHED 4. ALL PIPE CONNECTIONS AND CONCRETE PLAN REFERENCE: L.C. PLAN 32827-A, SH -3 ASSESSORS MAP: 58 PARCEL: 396 CROSS-SECTION STONE BASE CONSTRUCTION SHALL BE WATERTIGHT. 3' MAX. SIDE 15' COMPACTED FILL 36"1 IMAXIMUM,12"MINIMUM MINIMUM LOT SIZE: 25,000 S.F. EXISTING LOT AREA: 9,399± S.F. EX. LOT COVERAGE: 5 FILL ALL UNUSED KNOCKOUTS WITH MORTAR. PROP. LOT COVERAGE: 1,896± S.F. (20.2 OVERLAY DISTRICT. NONE 0 00 00 0 000 0 0 0 0 0 3" LAYER f� 1 PLAN VIEW LOT #52 PUMP, CRUSH AND REMOVE ALL EXISTING SEPTIC COMPONENTS IN ACCORDANCE WITH TITLE 5. N31'48'20"W .+•v..nnuL rL1Yl.L - -- / 0 0 0 0 000 0 0 000 0 0 { PEASTONE T R HIGH 000 O 30 24" 0 p pp POLYETHYLENE 00 O O EFFEC. Cb p INFILTRATOR 3050 O Op 0 DEPTH �p0 CHAMBER 0 j� \\ 3/4" - 1 1/2" 24" 50" 24" WASHED STONE 98" CROSS-SECTION OF CHAMBER LOT #53 NOTE, AREAS OF ADDITIONS THAT ARE u4 o / N r LISTED AS (SLAB/CRAWL) HAVE THE 8 0' \ Z CRAWL SPACE FLOOR ABOVE THE ° - TOP OF THE LEACHING SYSTEM. �S`� PROPOSED 8.2'x 35' O LEACHING S.A.S. a / \ \ PROPOSED y / B)` _ ^ INSPECTION PORT }10, PROPOSED 'D' BOX Nib- CO 6 D 1500 PROP.Pp�POSED C.O. ^ `O T- GALLONESEPTIC TANK I BULKHEAD PORCH N 21.@' N 24' TP#1 -� B2 PROP.� 80 PROP. ADDITION ADDITION(FUL (CRAWL/SLAB) I \ GAS AS I KITCHEN BATH \ BED#3 rn BED#1 \ EXISTING 3 PROP. BEDROOM DWELLING W I ADDITION v I (CRAWL) y I �\ I LIVING ROOM o to HE10#2 Go PORCH h I CONCRETE STOOP LOT #50 0 M ��� i� L❑T #40 L❑T #49 / I I � `. J � 1 POST &RAIL FENCE y N31'48'20 "W 1 94.0 - - - - - - °"w--- -� OHW---� OHW oriw------- or+w----__ _ _ \ °mv-----_•_ orrw orrw ------ f �------- k!WAWRMeIN-- I I / ofnv OHW -------L-------iL car-` _ ° --------------------' ---------------- P. --- -W - -- - q � G R ❑USE LANE L id far NFPAIH (,H SEPItc I R1 �ytHOPy V� 4•TS It e to State and Local sevariances. e+ Ir, talth rev it, and approval required for �'� c aations/+to CP.AIOA•lities orstructureskl+seFIELD No.3armoull, Ileaith Ueparb--------- APPIZOVED----------------- --------. PLAN VIEW SCALE: 1' = 10 FEET 0 5 10 20 FT. DESIGN CRITERIA: DESIGN FLOW: 3 BEDROOMS AT 110 G.P.B./D 330 G.P.D. REQUIRED SEPTIC TANK: 330 X 200% = 660 GAL. SEPTIC TANK PROVIDED: _ X500 GAL. SIZE OF LEACHING FACILITY REQUIRED: DESIGN PERC. RATE: <2 MIN./ INCH LONG TERM APPL. RATE 0.74 G.P.D/S.F. 330 GPD + 0.74 GPD/SF = 446 S.F. LOCUS PLAN: NO SCALE REVISIONS FACILITY PROVIDED: SIZE OF LEACHING USE HIGH DENSITY POLYETHYLENE LEACHING CHAMBERS(4 UNITS) 8.17'X2'X35' SIDEWALL = 2(8.17'+35') X 2' = 172.68 BOTTOM = 8,17' X 35' = 285.95 FACILITY & THE BUILDING ADDITION ONLY. 458.6S.F, 458.6 S.F x 0.74 GPD/SF = 339GPD D.E.P TITLE 5 AND LOCAL BOARD LOCUS INFORMATION 3. ALL PIPES LOCATED UNDER PAVEMENT CURRENT OWNER: JOSEPH & ALICE SHERMAN TITLE REFERENCE: BOOK 1328, PAGE 65 PLAN REFERENCE: L.C. PLAN 32827-A, SH -3 ASSESSORS MAP: 58 PARCEL: 396 ZONING DISTRICT- R-25 SETBACKS: FRONT 30' OF SOIL SHALL NOT BE USED. THE FILL SHALL SIDE 15' TWO INCHES. A SIEVE ANALYSIS, USING A I{4 REAR 20' MINIMUM LOT SIZE: 25,000 S.F. EXISTING LOT AREA: 9,399± S.F. EX. LOT COVERAGE: 1,306± S.F. (13.970) PROP. LOT COVERAGE: 1,896± S.F. (20.2 OVERLAY DISTRICT. NONE NITROGEN SENSITIVE (0.30 mm EFFECTIVE PARTICLE SIZE) ZONE: NOT A ZONE II FEMA FLOOD (0.075 mm EFFECTIVE "PARTICLE SIZE) ZONE DISTRICT' "C" DATED 6/17/1986 THE CONTRACTOR SHALL BE RESPON- PANEL #250015 0004 C LOCUS PLAN: NO SCALE REVISIONS NO. DATE DESCRIPTION 1. 11/l/07 REDUCE ADD. 2. 10/3/12 MODIFY ADD. 3 11/16/12 ADD STAIRS TO BULKHEAD GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY & THE BUILDING ADDITION ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL, SUBSOIL AND OTHER IMPERVIOUS MATERIAL 6. REPLACE ALL EXCAVATED MATERIAL WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND DELETERIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT CLASSES OF SOIL SHALL NOT BE USED. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN TWO INCHES. A SIEVE ANALYSIS, USING A I{4 SIEVE, SHALL BE PERFORMED ON A REPRESENTATIVE SAMPLE OF FILL UP TO 45% BY WEIGHT OF THE FILL SAMPLE MAY BE RETAINED ON THE f4 SIEVE. SIEVE ANALYSES ALSO SHALL BE PERFORMED ON THE FRACTION OF FILL SAMPLE PASSING THE f4 SIEVE, SUCH ANALYSES MUST DEMONSTRATE THAT THE MATERIAL MEETS EACH OF THE FOLLOWING SPECIFICATIONS: 100% MUST PASS f4 SIEVE (4.75 mm EFFECTIVE PARTICLE SIZE) 10%100% MUST PASS f50 SIEVE (0.30 mm EFFECTIVE PARTICLE SIZE) 0%-20% MUST PASS #100 SIEVE (0.15 mm EFFECTIVE PARTICLE SIZE) 0%-5% MUST PASS f200 SIEVE (0.075 mm EFFECTIVE "PARTICLE SIZE) 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, LOCATION AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. B. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FACILITY. 9. EXITING INVERTS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONFIRM LOCATION & NUMBER OF INVERTS. 0. THE ENGINEER IS TO BE NOTIFIED OF ANY FIELD CHANGES THAT MAY BE REQUIRED. k BSC GROUP 349 Main Street, (RT. 28) Unit D W. Yarmouth Massachusetts 02673 508 778 8919 PROJECT TITLE: DESIGN FOR SEWAGE DISPOSAL SYSTEM REPAIR WITH BUILDING ADDITION ffu GROUSE LANE ,WEST YARMOUTH MASSACHUSETTS PREPARED FOR: SCOTT BUCKLEY P.O. BOX 1925 COTUIT, MA 02648 SCOTT.WB®LIVE.COM (508) 367-2530 DATE: OCTOBER 11, 2007 COMP. DESIGN: K. HEALY CHECK: M. DIBB DRAWN: K. HEALY FIELD: D. GAZZOLO / N. MERCIER FILE NO. 9283-SEP.DWG DWG NO. 5850-01 SHEET 1 of 1 JOB NO. 4-9283.00 1