Loading...
HomeMy WebLinkAbout15 Hemeon Drive First Floor Framing PlanLEGEND Bearing Wall Below Bearing Wall Above Non -Bearing Wall Below Non -Bearing Wall Above Post Below Post Above Post Above & Below Multiple Member Beams Side Loaded Connection 1/2" dia. Bolt (b) I Staggered-'« F50 Multiple Member Beams Side Loaded Connection 1 314" Versa -Lam Nail Pattern 16d common nails. See chart Max. Uniform Load be per in. ft.) Numberof grows Brows Members min. 2 520 780 9(a) _390 585 min, (a)7" wide members must be loaded t rom both a Ides, tj (b) Design values apply to common bona (grade 5 or higher) ( a ) Nail pattern for 3 - piece member must occur on both sides. Use flaw ashers each side and drill hales 12" dia. (c) Alivalues In the table above may be Increased 15% for avow loaded roofs ar 25% for non -snow roof w here code a row a. Nail values may be increased by 15% for snow - load roofs and by 25% for non - snow roofs where building code allows. m Bolt14' Multiple Member Connection Nail N.T.S. N.T.S. AJS'" Blocking Panel. Use 3" (1 Od) nails at 6- o.c. Nail each end with 1 - 3" (10d) nail Load Bearing Walls I 11,T minimum end bearing length at all floor and roof details. Attachment at End king Panels at Interior Bearing N.T.S. F13 -E': N.T.S. — Sold block all posts from above to bearing below. Post Load Transfer N.T.S. Toe nail rim board to plate w dh 21/z' (6d) nails at 6' o.c. or w Rh 3W (16d) nails at 12" o.c. I- 1 - 2%r- (50) hail for �V each joist flange Rim Board N.T.S. Joist V GI J P-LOI11 LVL beam F19 LVL Header Opening N.T.S. 1st Floor 1/4 11 = 1'-0" THE INTENT OF THIS DRAWING IS ONLY TO PROVIDE SUPPLIMENTAL INFORMATION FOR PROJECT MATERIAL ESTIMATING. MATERIAL RECOMMENDATIONS (THIS PLAN) WILL BE SUBMITTED, ALONG WITH RECOMMENDED DESIGN CALCULATION SHEETS, TO THE PROJECT ARCHITECT/ENGINEER, GENERAL CONTRACTOR AND/OR INSTALLER TO REVIEW AND APPROVE PRIOR TO ORDER PLACEMENT AND INSTALLATION. REFER TO ALL METHODS OF CONSTRUCTION TO ORGINAL ARCHITECTURAL AND STRUCTURAL DRAWINGS AND NOT THIS PLAN. ist Saved Date: 1/4/2007 11:14 AM int Date: 1/5/2007 1:26 PM Lany-s capacity. bee caic UZb. Neeas review by project's architect/engineer. 1st Floor Framing Schedule - Nominalized Tag Qty Description Length 1 Q 11-7/8" AJS TM 20 MSR 32'0" 2 Max Uniform Load 30'0" 3 25 11-7/8" AJS' 20 MSR 28'0" 4 1 11-7,18" AJSTM 20 11 160" 5 ( lbs, per lin. fl ) Nurcber of 24'O.C. 12"col 6"o,c, li Members 14' 0" 6 1 l l-718" AJS'' 20 MSR 8101, 7 5 11-713" AJS"' 20 MSR 6' 0" 8 3 11-78" AJSw 20 MSR 1312 "Versa -Lam 4 Bolt Spaang iQ 2' 0" — 1000 2000 —.__ Bolt (b) 3 375 750 1500 ® T 4 (a) 330 _ .._ 670 .. ._ 1330 I Staggered-'« F50 Multiple Member Beams Side Loaded Connection 1 314" Versa -Lam Nail Pattern 16d common nails. See chart Max. Uniform Load be per in. ft.) Numberof grows Brows Members min. 2 520 780 9(a) _390 585 min, (a)7" wide members must be loaded t rom both a Ides, tj (b) Design values apply to common bona (grade 5 or higher) ( a ) Nail pattern for 3 - piece member must occur on both sides. Use flaw ashers each side and drill hales 12" dia. (c) Alivalues In the table above may be Increased 15% for avow loaded roofs ar 25% for non -snow roof w here code a row a. Nail values may be increased by 15% for snow - load roofs and by 25% for non - snow roofs where building code allows. m Bolt14' Multiple Member Connection Nail N.T.S. N.T.S. AJS'" Blocking Panel. Use 3" (1 Od) nails at 6- o.c. Nail each end with 1 - 3" (10d) nail Load Bearing Walls I 11,T minimum end bearing length at all floor and roof details. Attachment at End king Panels at Interior Bearing N.T.S. F13 -E': N.T.S. — Sold block all posts from above to bearing below. Post Load Transfer N.T.S. Toe nail rim board to plate w dh 21/z' (6d) nails at 6' o.c. or w Rh 3W (16d) nails at 12" o.c. I- 1 - 2%r- (50) hail for �V each joist flange Rim Board N.T.S. Joist V GI J P-LOI11 LVL beam F19 LVL Header Opening N.T.S. 1st Floor 1/4 11 = 1'-0" THE INTENT OF THIS DRAWING IS ONLY TO PROVIDE SUPPLIMENTAL INFORMATION FOR PROJECT MATERIAL ESTIMATING. MATERIAL RECOMMENDATIONS (THIS PLAN) WILL BE SUBMITTED, ALONG WITH RECOMMENDED DESIGN CALCULATION SHEETS, TO THE PROJECT ARCHITECT/ENGINEER, GENERAL CONTRACTOR AND/OR INSTALLER TO REVIEW AND APPROVE PRIOR TO ORDER PLACEMENT AND INSTALLATION. REFER TO ALL METHODS OF CONSTRUCTION TO ORGINAL ARCHITECTURAL AND STRUCTURAL DRAWINGS AND NOT THIS PLAN. ist Saved Date: 1/4/2007 11:14 AM int Date: 1/5/2007 1:26 PM Lany-s capacity. bee caic UZb. Neeas review by project's architect/engineer. 1st Floor Framing Schedule - Nominalized Tag Qty Description Length 1 Q 11-7/8" AJS TM 20 MSR 32'0" 2 8 11-7/8" AJSw 20 MSR 30'0" 3 25 11-7/8" AJS' 20 MSR 28'0" 4 1 11-7,18" AJSTM 20 11 160" 5 3 11-7.3" AJSw 20 MSR 14' 0" 6 1 l l-718" AJS'' 20 MSR 8101, 7 5 11-713" AJS"' 20 MSR 6' 0" 8 3 11-78" AJSw 20 MSR 4'0" 4 3 11-7.3" AJS " 20 MSR 2' 0" 15 ELK 11-713" AJS-" 20 MSR 560" 0 MING HERE 1st Floor Al 11-7/8"AJS 20 MSR 16" OCS ISI L4 1st Floor Accessory Schedule Tag Qty Manufacturer Product Description H1 4 Simpson Strong -Tie Inc. HUC412 H2 6 Simpson Strong -Tie Inc. IUTM2 i7vn board and AJS '"lode -by -aide. Phil rlr 2Yo" (1 REVISIONS: � Exterior End Wall Support � �,I N.T.S. ,. M L F— rn I— Z0 WWp 2 iJ WWW I— WILLz<LJ= W m �— 2OZ J I— J Q Notes: Shop drawings, typical details and framing plans, outlining Installation procedures and unit Identification marks, shall be submitted for approval by the project architect and/or engineer. Exact quantities and lengths are the responsibility of the contractor. Contractor Is to verify all beams and joists at their exact locations. The floor system (1 -joist, LVL) are designed for floor loads only. Roof loads from rafters, bracing, and beams must bear on exterior walls and Interior walls with bearing straight through to a footing. Any roof loads carried by the floor system must be so indicated on the framing plan submitted to us for takeoff. Product to be stored, handled and installed In accordance with manufacturer's recommendations. BC FRAMER® 6 SCALE: 1/4" = 1'-0" DATE: 1/3/2007 BY: be FILE: Richardson Visceglio Residence.b DWG: SHEET: 1 / 3