Loading...
HomeMy WebLinkAbout15 Hemeon Drive Second Floor Framing PlanMurciple Member Beams LEGEND Side Loaded Connection Bearing Wall Below, 1/2"dia. Bolt (b) Max Uniform Load (lbs. per lin. ft. ) Number of0 C 6" o c. Members Bearing Wall Above 13,4"Ven a -Lam L _ _ _ _ _ _ _ _ _ _ _ _ ,Bolt SPacin 12"dia 2 500 1000 ;1500 _ __—_ +Bolt (b) 3 375 750 Non Bearing Wall Below 33c 670 2"min. Non -Bearing Wall Above I (a)7" w He members must be loaded from both sides. g (b) Design values apply to common bots (grade 5 or higher) I Use flatw ashers each side and drill holes 12' dia. .< µ' Staggarad{- (c)Aflvalues lnthe table above may be Increased 15% for snow badedroofsal 25% for non -snow roots w here code allow s. Post Below Post Above Post Above & Below wmmple mem0er teams Side Loaded Connection 1 314' Versa -Lam Nail Pattern 16d common nails. See chart Max Uniform Load ( Ica, per In. ft.) Number or grows 1. 3rows Members min. 2 520 I 780 3(a)t 390 - 585 ( a ) Nail pattern for 3 - piece member must occur on both sides. Nail values may be increased by 15% for snow - load roofs and by 25% for non - snow roofs where building code allows. F49 Multiple Member Connection Nail N.T.S. Nail each end with 1 - 3" (10d) nail i 1'h" minimum end bearing length at all floor and roof details. � F Attachment at End N.T.S. Load Bearii Wall AJS T" Blocking Panel. Use 3" (11 nails at T o.c. F13 -E kin Panels at Interior Bearing N.T.S. -- Solid block all posts from above to bearing below. U Post Load Transfer N.T.S. Toe nail rim board to plate w dh 2K" (8d) nags at 6" o.c. c r wth 3%" (16d) naffs at 12" o.c. or Rim Board 1 1-T— N.T.S. Joist 2nd Floor 1/4 If = 11.011 THE INTENT OF THIS DRAWING IS ONLY TO PROVIDE SUPPLIMENTAL INFORMATION FOR PROJECT MATERIAL ESTIMATING. MATERIAL RECOMMENDATIONS (THIS PLAN) WILL BE SUBMITTED, ALONG WITH RECOMMENDED DESIGN CALCULATION SHEETS, TO THE PROJECT ARCHITECT/ENGINEER, GERNERAL CONTRACTOR AND/OR INSTALLER TO REVIEW AND APPROVE PRIOR TO ORDER PLACEMENT AND INSTALLATION. REFER ALL METHODS OF CONSTRUCTION TO ORGINAL ARCHITECTURAL AND STRUCTURAL DRAWINGS AND NOT THIS PLAN. ist Saved Date: 1/4/2007 11:14 AM int Date: 1/5/2007 1:27 PM 2nd Floor Al 11-7/8" AJS 20 MSR 16" OCS III L6 2nd Floor Framing Schedule- Nominalized Tag Tag I Qty Description Length 1 19 11-7f8" AJS"`v 20 MSR 28'0" 2 114 11-718" AJSTM' 20 MSR 160" 3 2 11-7!8" AJSTM' 20 MSR 14' 0" 3 x 7-V_RS-: LAM® 2.0 3100 SP 8' 0" E 2 -3'-" x 9-1'2" V_RSA- LAM® 2.0 3100 SP 18-0" 11 2 Beam By O.hers 6101, 12 ! BILK 11-7'8" AJSTM 20 MSR 24'0" p -Lal I I LVL beam LVL Header Opening N.T.S. 2nd Floor Accessory Schedule Tag Qty Manufacturer Product Description H1 3 Simpson Strong -Tie Inc. HUC412 H2 14 Simpson Strong -Tie Inc. IUT312 Pimboard and AJS Tside-by-side. Nail rim board and rinnJoist with 2Yz" (8d) nails at 6" o.c. F 33-C. Exterior End Wall Support N.T.S. REVISIONS: rn I— z0 W W p cC LLJ lUWW,W i— W LL 0 U) z<W= W m 1-- noz J 1-- _J Q M Notes: Shop drawings, typical details and framing plans, outlining Installation procedures and unit Identification marks, shall be submitted for approval by the project architect and/or engineer. Exact quantities and lengths are the responsibility of the contractor. Contractor is to verify all beams and Joists at their exact locations. The floor system (1-jolst, LVL) are designed for floor loads only. Roof loads from rafters, bracing, and beams must bear on exterior walls and interior walls with bearing straight through to a footing. Any roof loads carried by the floor system must be so indicated on the framing plan submitted to us for take -off. Product to be stored, handled and Installed In accordance with manufacturer's recommendations. (n o ar) 2 U in (V I N M N O N U > O ca 0 Q Eo) A tri v � 'c L T cn = BC FRAMER® 6 SCALE: 1/4" = 1'4" DATE: 1/3/2007 BY: be FILE: Richardson Visceglio Residence.b DWG: SHEET: 213