Loading...
HomeMy WebLinkAbout15 Hemeon Drive First Floor Framing Plan 21elJ4n+ili 11 Bearing Wall Below Bearing Wall Above Non -Bearing Wail Below Non -Bearing Wall Above Post Above Post Above & Below Multinle Mpmhpr Ropme Side Loaded Connection 1/2" dia. Bolt (b) Max Uniform Load (lbs, per lin. ft.) Nurrter of 24 c.c. 12' o.c 6" o_c. 13/4"Vs 1 314 Versa Lam _ Bolt Spacing. ,-12"dia. 2 l 500 1000 2000 Bolt (b) 3 I._ $75 750 1500 I 4 (a) _ 330_ 670 1330 2" min. (a) 7" w be members must" loaded from both sbea. (b) Design values apply to common bots (grade 5 or higher) Use f]at was here each aMe and drill holes 1/2" dia. (c) All values in the table ahove may be Increased 15% for snow based roofs al 25% for no" now roofs where code a lbw s. Side Loaded Connection 1 314" Versa -Lam Nail Pattern 16d common nails. See chartMas Uniform Load (lbs. perm. ft ) (Number of 2rowe 3rows Member_ min. r 2 1 520 780 1 3(a)�_ 390 585 ( a ) Nail pattern for 3 - piece member must occur on both sides. Nail values may be increased by 15% for snow - load roofs and by 25% for non - snow roofs where building code allows. F49 Multiple Member Connection Nail N.T.S. Nail each end with 1 - V 41 (10d) mail 1%" minimum end bearing length at all floor and roof details. F3) -D Attachment at End N.T.S. Load Bearil wail AIS'" Blocking Panel. Use 3" (10d) naffs at 6 -ox. CF13-E)kIng Panels at Interior_ Bearing N.T.S. L- Solid block a0 posts from above to bearing below, 1( F08.Post Load Transfer N.T.S. Toe nal rim board to plate w lh 2'h" (fief, roils at T do. or with 3%" (16d) nails at 12" o.c. ww pmr i rmge )r F14 A1 Rim Board N.T.S. Joist hanger - -Versa-Lam LVL beam F19 LVL Header Opening N.T.S. 1st Floor 1/4 Iff= 11.011 THE INTENT OF THIS DRAWING IS ONLY TO PROVIDE SUPPLIMENTAL INFORMATION FOR PROJECT MATERIAL ESTIMATING. MATERIAL RECOMMENDATIONS (THIS PLAN) WILL BE SUBMITTED, ALONG WITH RECOMMENDED DESIGN CALCULATION SHEETS, TO THE PROJECT ARCHITECT/ENGINEER, GENERAL CONTRACTOR AND/OR INSTALLER TO REVIEW AND APPROVE PRIOR TO ORDER PLACEMENT AND INSTALLATION. REFER TO ALL METHODS OF CONSTRUCTION TO ORGINAL ARCHITECTURAL AND STRUCTURAL DRAWINGS AND NOT THIS PLAN. ist Saved Date: 1/4/2007 11:14 AM int Date: 1/5/2007 1:26 PM --v — ---r-- LJ• w+ , a"aw vcU. IVGCUS review by project's architect/engineer. 1 st Floor Framing Schedule - Nominalized Tag Qty Desorption Length 1 e 11-7,'E" A_'S^' 20 MSR 32'0"' 2 E -7'E" A.JS„ 20 MSR 30' 0" 3 2 11-7 "AJS"' 20 MSR 128'0" G 1 14-7.--'AJS-,' 20 MSR i 116.0" Simpson Strong -Tie 11-7 E AJS-" 20 MSR 14'0" 6 t 1-7="AJS"''20MSR 8'0" 7 1'-7.E"AJS"'20MSR ' =_IS ' 20 MSR 4.0" c z „- c- r I� -,' 20 MSR 2'0" — I I I I 156-0" I O i mm I rK/AroiNG HERE 1 st Floor Al 11-7/8" AJS 20 MSR 16" OCS 111 L4 1st Floor Accessory Schedule Tag Qty Manufacturer 4 Simpson Strong-TieH2 aProductDescriptionH1 6 Simpson Strong -Tie I'6mboardand AJS T%Ide-by-slo,. mil fir^ �---� —• -..... ... 2'h" (E F13 -C Exterior End Wall Support N.T.S. REVISIONS: { rn H- Zp W Luo wwFrw kL O(0>w Z W m 20Z J F - _I Q M Notes: Shop drawings, typical details and framing plans, outlining Installation Procedures and unit Identification marks, shall be submitted for approval by the project architect and/or engineer. Exact quantities and lengths are the responsibility of the contractor. Contractor is to verify all beams and Joists at their exact locations. The floor system (I-Jolst, LVL) are designed for floor loads only. Roof loads from rafters, bracing, and beams must bear on exterior walls and Interior walls with bearing straight through to a footing. Any roof loads carried by the floor system must be so indicated on the framing Plan submitted to us for takeoff. Product to be stored, handled and Installed in accordance with manufacturer's recommendations. rn w t5 U z N N m 2 _ aN`oaCoo maDo-ov) � 0Mto z oM E H Mn (D > m m c(n z BC FRAMER@ 6 SCALE: 1/4" = 1'-0" DATE: 1/3/2007 BY: be FILE: Richardson Visceglio Residence.b DWG: