Loading...
HomeMy WebLinkAboutEngineered Plan - 2015N ACCESS COVERS MUST BE WITHIN INSPECTION 9" MINIMUM. 6` OF FINISH GRADE PORT 3' MAXIMUM COVER 101.6 FIRST 2' TO BE LEVEL 4' DIAM PIPE CLEAN SAND BACKFILL 99.6 98.0 97.5 / / " AROUND AND 2" OVER CHAMBERS v GAS 97.67 97.42 96 5 98.25 BAFFLE 6 OUTLET 16 HIGH CAPACITY INFILTRATOR m Z�- D -BOX CHAMBERS IN BED FORMATION 1500 GAL H-20 SEPTIC TANK 6. CRUSHED STONE OR COMPACTED BASE PROFILE : NOT TO SCALE INVERT ELEVATIONS: INVERT AT BUILDING: 99.6 INVERT IN SEPTIC TANK: 98.25 INVERT OUT SEPTIC TANK: 98.0 INVERT IN DIST. BOX: 97.67 INVERT OUT DIST. BOX: 97.5 INVERT IN LEACH CHAMBER: 97.42 BOTTOM OF LEACH CHAMBER: 96.5 ADJUSTED GROUND WATER: N/A OBSERVED GROUND WATER: N/A BOTTOM OF TEST HOLE #/: 88.8 r L OCUS MAP ITC I r,llrA In 0 CB CONCRETE BOUND -W WATER L I NE O HYDRANT G GAS L INE OHW- OVER HEAD WIRES -0 LIGHT POST -E--- UNDERGROUND ELECTRIC LINE -T- UNDERGROUND TELEPHONE LINE - CTV- UNDERGROUND CABLEVISION LINE +40.4 SPOT ELEVATION -......40 ....... EXISTING CONTOUR 40 __ PROPOSED CONTOUR DESIGN CRITERIA: DESIGN FLOW: 3 BEDROOMS AT /10 G.P.D. PER BEDROOM EQUALS 330 G.P.D. NO GARBAGE GRINDER SEPTIC TANK REQUIRED: 330 G.P.D. X 200% - 660 GAL. SEPTIC TANK PROVIDED: 1500 GAL. MIN. SOIL ABSORPTION SYSTEM REQUIRED: DESIGN PERC RATE C 5 MIN/ I NCH SOIL TEXTURAL CLASS - I EFFLUENT LOADING RATE - 0.74 GPD/SF 330 GPD / 0.74 GPD/SF - 446 S.F. REQUIRED PROVIDED: 16 HIGH CAPACITY INFILTRATOR CHAMBERS. I00'x 4.73 SF/FT - 473 S.F. 473 S.F. x 0.74 - 350 GPD SO I L TES T PIT DA TA I NO 1 CA TES �_ INDICATES PERCOLATION = OBSERVED TEST - GROUNDWATER 0. HORIZON TP #/ TEXTURE COLOR A LOAMY IOYR SAND 3/3 /0 -------------------- B LOAMY l OYR SAND 4/6 28` -------------------- Cl MED I UM l OYR SAND 6/4 40" 132 . I NO WATER DATE: MAY 13. 2015 TEST BY: STEPHEN HAAS WITNESSED BY: PHIL RENAUD PERC RATE: ( 2 MIN/INCH GENERAL NO TES : I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE D l SPOSAL SYSTEM ONLY. 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS SET. SEE SITE PLAN. 3. ALL CONSTRUCTION METHODS AND MA TER I AL S AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOARD OF HEALTH REGUL A T I ONS . 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN J' IN DEPTH SHALL BE CAPABLE OF WITH- STANDING H-20 WHEEL LOADS. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR APPROVED EQUAL. 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE OR APPROVED POLYETHYLENE. BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER TESTED FOR LEVEL WHEN THERE IS MORE THAN ONE OUTLET. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE 1 -888 -DIG -SAFE AND THE LOCAL WATER DEPT. 99.8 FOR L OCA T I ON OF UNDERGROUND UTILITIES. 8. EXISTING CESSPOOL TO BE PUMPED DRY AND 99.0 BACKFILLED. 97.5 9. ALL UNSUITABLE MATERIAL (A & 8 HORIZONS) ENCOUNTERED BELOW THE INVERT OF THE LEACHING FACILITY TO BE REMOVED FOR A DISTANCE OF 5' AROUND AND REPLACED WITH SAND IN ACCORDANCE WITH TITLE 5. ['I•�3 JOIN Z. i®uth Health Department DEMAREST, JR-�_ No.36859E APPROV ` OFE Oa AIN '101015 JRNJ Date ilEAU"CH DEPS //l, )Oeap 7 SEPT / C SYSTEM CIES l GN 98 STUDLEY ROAD. MAP 79 . PARCEL 1 45 SOUTH YARMOUTH. MA P'RE'PARED FOR : EL_ A / N )=R / TCHER 8029 MARATHON OR/ VE-. PLANO TX 75024 SCALE l 20 ' JUNE 1 4 . 20 / 5 STEPHEN A. HAAS _ ENGINEERING, INC P . O . Box 16 South Doe nn1s, MA 02660 ( SOB) 362-8132 JOB N0: 15-0/8