Loading...
HomeMy WebLinkAbout258 Highbank Road Proposed Septic Design10 TOP OF FOUNDATION I HORIZ I 20 FT. MINIMUM FROM CELLAR ELEV. tOI=Ci 10 FT. MINIMUM OTHER 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE �hr,�`Y icyl �i or,-,� COVERS 4' SCHEDULE 40 PVC PIPE <r,�fay` �b4'F' MIN. PITCH 1/8' PER FT. 4' CAST IRON PIPE (OR EQUAL MINIMUM p ltr plv/ (1)'!i-, PITCH 1/4 PER FT. lib FLOW LINE ELEV. a�:. U —{MIN. Grl /� [ i 0• ELEV. _ ELEV. = t;! 6' SUP LEV. 5 ,� BGAS DISTRIBUTION LIQUID OUTLET BOXDEPTH 4 FEET TEE 14 INCHES (TO BE PLACED ON FIRM BASE) TO BE WATER TESTED 5 FEET 19 INCHESIF 1500 GALLON MORE THAN ONE OUTLET 6 FEET 7 FEET 24 INCHES 29 INCHES(TO SEPTIC TANK BE PLACED ON FIRM BASE) 8 FEET 34 INCHES 3/40 TO 1 1/2.J WASHED STONE SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE CLEAN SAND LOAM AND SEED 2' LAYER OF MA r 1 /8' TO 1/2- 1,! 9 u /2"ou WASHED STONE VENT �' r NOT REQUIRED Z 1 CU. FT. OF g CONCRETE S g o ANCHOR 07 '1Q ELEV. 1 7 HIGH CAPACITY INFILTRATORS WITH STONE IN AN 11 y 36 � /0TRENCH FORMATION ` WELL J SOIL ABSORPTION ZONE N j� SYSTEM (SAS) INDEX ADJUST USCS PROBABLE WATER TABLE ELEV. OBSERVED WATER TABLE ( / / ) ELEV. BOTTOM OF TEST HOLE ELEV. = 7 f 42 rr t � 0 1 M \ n, r1\ ` A C nS n 1� \ \_ M SOIL TEST DATE OF SOIL TEST f-'1'>kr FPy SOIL TEST DONE BY SW'EETSER ENGINEERING WITNESSED BY OBSERVATION HOLE 1 ELEV.- 90L OBSERVATION HOLE 2 ELEV.- PERCOLATION RATE .� MIN. NCH AT l/ / INCHES PERCOLATION RATE G 2i MM./INCH DEPTH I HORIZ I TEXTURE COLOR MOTT. OTHER tom' I �hr,�`Y icyl �i or,-,� <r,�fay` �b4'F' lr� foil p ltr plv/ (1)'!i-, r /J WATER ENCOUNTERED AT !' ELEV. LEGEND: EXISTING SPOT ELEVATION 00„0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION 00. FINAL CONTOUR SOIL TEST LOCATION Q UTILITY POLE -O- TOWN WATER —WSW CATCH BASIN (®� GAS LINE CLEAN OUT C. CESSPOOL C.P. O r w. l:" •h N�. 6161 rl! DEPTH HORIZ TEXTURE COLOR MOTT. OTHER lr� foil lib ^A) WATER ENCOUNTERED AT 1-2CL EtEV.� DESIGN CALCULATIONS-' NUMBER OF BEDROOMS GARBAGE DISPOSAL UNIT NO TOTAL ESTIMATED FLOW OZ REQUIRED SEPTIC TANK CAPACITY � GAL ACTUAL SIZE OF SEPTIC TANK 1500 GAT„ SOIL CLASSIFICATION I DESIGN PERCOLATION RATE <_ MIN./N. EFFLUENT LOADING RATE X7.74 GAL/DAY/S.F. LEACHING AREA ti , • 3 SO. FT. 0x o �- 4'77SLY ID;'Q ..., LEACHING CAPACITY (AREA X RATE) Z /=U GAL/DAY 17C,iX 0,79 mss/ b RESERVE LEACHING CAPACITY L._ GAL/DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN OF �LIL'2 20Tq I RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6' OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING PECULATION 'a OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL 'DIG -SAFE' AT 1-888-344-7233 AT LEAST 72 HOURS' PRIOR TO COMMENCING WORK ON SITE I., 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 8. PARCEL IS "IN FLOOD ZONE 9. LOT IS SHOWN ON ASSESSORS MAP f= AS PARCEL F� APPROVED: BOARD OF HEALTH DATE AGENT PROPOSED SEPTIC DESIGN FOR ' �UC31�i�1 Co�ls7l:vc�ria�/ PROJECT LO/CATION LO 7- v2- SWEETSER ENGINEERING 235 GREAT WESTERN ROAD c' ' :.,�_.<n•. 508— P.O. BOX 713 a�a + r �tl 398-3922 SOUTH DENNIS, MASS. 02660 . �Nr+, Ail `�L DAt f>F,1tlpF-1/ el; ZOOO SCALE t C,, REVISED JOB N0. LOCATION MAP REVISED SHEET / OF / L..........JCUTt'TCPD [YINIICCDIA