Loading...
HomeMy WebLinkAbout271 Highbank Road Proposed Septic DesignTOP OF FOUNDATION 20 FT. MINIMUM FROM CELLAR SOIL TEST L ELEV. c1pY f717 10 FT. MINIMUM 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE DATE OF SOIL TEST _AU 14. 1997 CLEAN SAND SOIL TEST DONE BY SWEETSER ENGINEERING COVERCONCRS WITNESSED BY AMY VON HONE LOAM AND SEED OBSERVATION HOLE 1 ELEv- OBSERVATION HOLE 2 ELEv.a /OJ 3 • 4' SCHEDULE 40 PVC PIPE /Q/.� MW. PITCH 1/8' PER FT. 2' LAYER PERCOLATION RATE < 2 MIN./INCH A7 INCHES 1/8' TO 1/2' DEPTH HORIZ TEXTURE COLOR MOTT. OTHER IDEPTHHORIZTEXTURE COLOR MOTT. OTHERl4' C ST IRON PIPE WASHED STONE VENT /(OR OUAL1 MINIMUM NOT REQUIRED p�q LOAMY �� �r g! PIT 1/4 PER FT. SAND Y n 0/A LOAMY1 CU. FT. OF SAND CONCRETE �•FLOW LINE ANCHOR (0 /� i� G -7 MIN. a • • f f B SANN� fl � J ".'��. 8 LOAMY SAND i V. m J7' �?0 • • f tZ »1S ELEV. r i GAS ELEV, e r 7� 6' SU P ELEY. m n • �z =.: - D• ELEV. m r} �,� ate. VEL �„ (, - , 1, C SANDM YT f 7F C Mf DIUM /z', c� a � . _ • BAFFLE _t.___ .. _ fw0 SAND DISTRIBUTIONELEV. 6r.=, UOUiD 1 TRENCH FORMATI ii 4 FEET 14 I CHES (TO BE PLACED ON FIRM BASE} IF MORE THAN ONE OUTLET 1�' ( HCH CAPATONE ININFlLAIRNATORS N1 DEPTH TEF BOX 5 FEET 19 I CHES TO BE WATER TESTED y , y bN 6 FEET 24 I cHEs 1500 GALLON (TO BE PLACED ON FIRM BASE) SOIL ABSORPTION t/ WELL N A NO WATER ENCOUNTERED AT /� ELEV. �� NO WATER ENCOUNTERED AT J' -p d ?. y ' s F�EE�T sa i a`�+Es SEPTIC TANK �' ZONE �• - 3/4- TO D 1 1/2' SYSTEM (SAS) INDEX WASHED STONE ADJUST LEGEND: DESIGN CALCULATIONS {� SEWAGE DISPOSAL SYSTEM PROFILEUSGS PROBABLE WATER TABLE ELEV. - N A EXISTING SPOT ELEVATION 00,0 NUMBER OF BEDROOMS T' NOT TO SCALE OBSERVED WATER TABLE ( / / ) ELEV. . N/A EXISTING CONTOUR ----00---- GARBAGE DISPOSE UNIT BOTTOM OF TEST HOLE ELEV. a v FINAL SPOT ELEVATION TOTE ESTIMATED FLOW �— FINL CONTOUR ( 110 GAL/8R./DAY X BR.) JJ .GAL,/DAY SOIL TEST LOCATION ® REQUIRED SEPTIC TANK CAPACITY = GAL UTILITY POLE -0- ACTUAL SIZE OF SEPTIC TANK 1500 GAL TOWN WATER —W-ixw­­-W SOIL CLASSIFICATION CATCH BASIN f®\ DESIGN PERCOLATION RATE15 _ MIN. N. GAS UNE EFFLUENT LOADING RATE n } D CLEAN OUT C CH1NG SO. FT. YJS.F. } CESSPOOL C.P. 0 / E .. tIrK6 } s"7�z r : .%SQ. FT. tf F LEACHING CAPACITY (AREA X RATE) . GAL/DAY 7 71 136 RESERVE LEACHING CAPACITYyy y' % GAL/DAY l/ NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TO REGULATIONS FOR THEJSUBSURFACE ISP SAL OF SEWAGE. t u , 2 ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO ,r <r�> , �p 6' OF FINISHED GRADE , 1 k � /' , k ;/ 3. ALL ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20. LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. A.NY V#S^"NAFY WJS USED TO 8S'INC COVL•P,S TO GRAVE S44LL -- ` K, •z �- �. BE MORTARED IN PLACE. _ 5. NO DF.TLRV'NALnrN HAS PErN. MADE AS TO COVPLIANCE WITH U DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS To OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. ! * 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL 'DIG -SAFE' AT 1-800-322-4844 AT LEAST 72 HOURS PRIOR TO �l 7. CONTRACTOR �ISFITO COMMENCING WORK IGRAD SAND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. 8. i, C{ i/ .�' ash 9. LOT IS SHOWN ON AIS IN FLOODSSESSORS MAP 80 � )tONE AS PARCEL C.M=. t _ APPROVED: BOARD OF HEALTH �� r' : DATE AGENT f' q PROPOSED SEPTIC DESIGN FOR LOCUS DESIMONE CUSTOM BUILDERS Cos _ g f o PROJECT LOCATION LOT L Qw Z7/ HIGHBANK RD., YARMOUTH R SWEETSER .ENGINEERING 235 GREAT WESTERN ROAD —39 SOUTH DENNIS MASS. 02660 398-3922 .*rf C 620 — �,4t,d c� .^" `f` DATE 20' T kV J` ,, 6-0� � REVISED Joe No.3 1 `i38-0 1 71, LOCATION MAP sED �•` REw o`i c SHEET 1 OF 1 1 .AL2 - 01997 SWEETSERENGINEERING