HomeMy WebLinkAbout301 Highbank Road Proposed Septic Design20 FT. MINIMUM FROM -CELLAR SOIL TEST
T. MINIMUM FROM SLAB OR CRAWL SPACE DATE OF SOIL TEST
ON CLEAN SAND SOIL TEST DONE BY,%WEMENGINEERING
ER
OVERS WITNESSED BY
4' SCHEDULE 40 PVC PIPE LOAM AND SEED OBSERVATION HOLE 1 ELEV.- to" 2
MIN. PITCH 1/8- PER FT OBSERVATION HOLE 2 ELEV-001 /c� I
2- LAYER OF
PERCOLATION RATE MIN./INCH AT —7 INCHES PERCOLATION RATE MIN AmCk
1/B- TO 1/2 -
STONE VENT
NOT REOUIRED
5 1 CU. FT. OF
FLOW LINE CONCRETE
ANCHOR
-PIN. 04
ELEIJQ�u ELEV.
GAS ELEV. ELEV.
BAFFLE DISTRIBUTION CLEV.J HIGH CAPACITY INFILTRATORS WITH
(TO BE PLACED ON FIRM BASE) BOX C'7o � ,!-
STONE IN AN
TO BE WATER L51
lr,r%n GAIN nIF MORE THAN ONE —m i- Y 3 TRENCH FORMA11CN 5
DEPTH
HORIZ
TOP OF FOUNDATION
COLOR
ELEV. 10 ft. MINIMUM
I OTHER
f9
e CAST IRON PIPE
EFFLUENT LOADING RATE .-0-74 GAL/bAY/S.F.
(OR EOUAL) MINIMUM
LEACHING AREA so. FL
C;y3C)
PITCH 11/4' PER FT.
LEACHING CAPACITY (AREA X RATE) GAL/DAY
ELEV fur.),
20 FT. MINIMUM FROM -CELLAR SOIL TEST
T. MINIMUM FROM SLAB OR CRAWL SPACE DATE OF SOIL TEST
ON CLEAN SAND SOIL TEST DONE BY,%WEMENGINEERING
ER
OVERS WITNESSED BY
4' SCHEDULE 40 PVC PIPE LOAM AND SEED OBSERVATION HOLE 1 ELEV.- to" 2
MIN. PITCH 1/8- PER FT OBSERVATION HOLE 2 ELEV-001 /c� I
2- LAYER OF
PERCOLATION RATE MIN./INCH AT —7 INCHES PERCOLATION RATE MIN AmCk
1/B- TO 1/2 -
STONE VENT
NOT REOUIRED
5 1 CU. FT. OF
FLOW LINE CONCRETE
ANCHOR
-PIN. 04
ELEIJQ�u ELEV.
GAS ELEV. ELEV.
BAFFLE DISTRIBUTION CLEV.J HIGH CAPACITY INFILTRATORS WITH
(TO BE PLACED ON FIRM BASE) BOX C'7o � ,!-
STONE IN AN
TO BE WATER L51
lr,r%n GAIN nIF MORE THAN ONE —m i- Y 3 TRENCH FORMA11CN 5
DEPTH
HORIZ
TEXTURE
COLOR
MOTr.
I OTHER
GAS LINE
EFFLUENT LOADING RATE .-0-74 GAL/bAY/S.F.
CLEAN OUT
CESSPOOL C.P. 0
LEACHING AREA so. FL
C;y3C)
LEACHING CAPACITY (AREA X RATE) GAL/DAY
PROJECT LOCATION
C- C7
�A
3
1. AM WORKMANSHIP AND MATERIALS
TITLE 5 AND THE TOWN OF '�CONFORM TO D.E.P.
-L-eo^ - RULES AND
REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
WITHIN e* OF FINISHED GRADE.
3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE Or
WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN
10 FT. OF DRIVES OR PARKING AREAS, H-20 LOADING SHALL BE
USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS.
1c,
. BE MORTARED IN PLACE. -
� lo -/p
5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE wrm
DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS To
/1Z." 1"�
S. UTiLlilES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR
REVISED
i E
,IS TO * CALL -DIG-SAFE- AT 1-888-344-7233 AT LEAST 72 HOURS
PRIOR TO COMMENCING WORK ON SITE.
7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
SITE CONDITIONS PRIOR TO COMMENCING WORK ON STE ANY VARIAT11
IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER
3�'20
c
S. PARCEL IS IN FLOOD ZONE
9. LOT IS SHOWN ON ASSESSORS 'MAPS AS PARCEL
/ 2"1' REV. '719
SEPTIC TANK (TO BE PLACED ON FIRM BASE) SOIL ABSORPTION WELL. 111,1�4 1pIP WATER ENCOUNTERED AT 4e, WATER ENCOUNTERED AT ELEV.
3/4- TO 1 11t ZONE
WASHED STONE SYSTEM (SAS) INDEX
1 ADJUST— LEGEND: D I ESIGN CALCULATIONS
SEWAGE DISPOSAL SYSTEM PROFILEUSGS PROBABLE WATER TABLE ELEV. = EXISTING SPOT ELEVATION 00,10 NUMBER OF BEDROOMS
NOT TO SCALE SERVED WATER TABLE ( / / J nEv. - EXISTING CONTOUR GARBAGE DISPOSAL UNIT NO
"-A-S57, � BOTTOM OF TEST HOLE ELEV. - Y FINAL SPOT ELEVATION M TOTAL ESTIMATED FLOW
r it FINAL CONTOUR ( 110 GAL/8R./DAY X � SR.) 730 GAL/DAY
SOIL TEST LOCATION REQUIRED SEP71C TANK CAPACITY Ir ( C' CAL
5-17
J
14'
L 1,
rf-
\Z
- L
?
39
DEPTH
HORIZ
I TEXTURE
COLOR
Morr.
I OTHER
GAS LINE
EFFLUENT LOADING RATE .-0-74 GAL/bAY/S.F.
CLEAN OUT
CESSPOOL C.P. 0
LEACHING AREA so. FL
C;y3C)
LEACHING CAPACITY (AREA X RATE) GAL/DAY
PROJECT LOCATION
C- C7
RESERVE LEACHING CAPACITY GAL/DAY
3
1. AM WORKMANSHIP AND MATERIALS
TITLE 5 AND THE TOWN OF '�CONFORM TO D.E.P.
-L-eo^ - RULES AND
REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
WITHIN e* OF FINISHED GRADE.
3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE Or
WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN
10 FT. OF DRIVES OR PARKING AREAS, H-20 LOADING SHALL BE
USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS.
1c,
. BE MORTARED IN PLACE. -
� lo -/p
5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE wrm
DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS To
OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY.
S. UTiLlilES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR
REVISED
i E
,IS TO * CALL -DIG-SAFE- AT 1-888-344-7233 AT LEAST 72 HOURS
PRIOR TO COMMENCING WORK ON SITE.
UTILITY POLE -o-
ACTUAL SIZE OF SEPTIC TANK 1500 GAL
TOWN WATER —W�
SOIL CLASSIFICATION I
CATCH BASIN J
DESIGN PERCOLATION RATE < 5 WN./iN.
GAS LINE
EFFLUENT LOADING RATE .-0-74 GAL/bAY/S.F.
CLEAN OUT
CESSPOOL C.P. 0
LEACHING AREA so. FL
C;y3C)
LEACHING CAPACITY (AREA X RATE) GAL/DAY
PROJECT LOCATION
C- C7
RESERVE LEACHING CAPACITY GAL/DAY
NOTES:
1. AM WORKMANSHIP AND MATERIALS
TITLE 5 AND THE TOWN OF '�CONFORM TO D.E.P.
-L-eo^ - RULES AND
REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
WITHIN e* OF FINISHED GRADE.
3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE Or
WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN
10 FT. OF DRIVES OR PARKING AREAS, H-20 LOADING SHALL BE
USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS.
4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL
. BE MORTARED IN PLACE. -
5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE wrm
DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS To
OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY.
S. UTiLlilES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR
REVISED
i E
,IS TO * CALL -DIG-SAFE- AT 1-888-344-7233 AT LEAST 72 HOURS
PRIOR TO COMMENCING WORK ON SITE.
7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
SITE CONDITIONS PRIOR TO COMMENCING WORK ON STE ANY VARIAT11
IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER
IMMEDIATELY.
S. PARCEL IS IN FLOOD ZONE
9. LOT IS SHOWN ON ASSESSORS 'MAPS AS PARCEL
lo
T A
APPROVED: BOARD OF HEALTH
LJL14
nAlr
PROPOSED SEPTIC DESIGN
FOR
PROJECT LOCATION
C- C7
SWEETSER ENGINEERING
235 GREAT WESTERN ROAD
508— P. 0. BOX 713
398-3922 SOUTH DENNIS, MASS. 02666
REVISED
LOCATION MAP j
REVISED
i E
SHEET OF