NOTES
THE TOP OF BANK IS AT THE FLOOD ZONE LINE j
AS SHOWN BY BRAD HALL ON 09/06/99.
LIMIT OF WORK #1 SHALL REMAIN IN PLACE AND MAINTAINED
AS NECESSARY UNTIL THE PROJECT IS COMPLETED. THE AREA
BETWEEN LIMIT OF WORK #1 AND LIMIT OF WORK #2 SHALL BE
GRADED, LOAMED, AND SEEDED.' IF THE PROJECT SHOULD BEG N
DURING THE TIME OF YEAR WHICH WOULD NOT PERMIT HYDR05EEDING
OR PLANTING GROUND COVER, THE CONTRACTOR SHALL PROVIDE A
DETENTION AREA WITHIN THE FORMER BUILDING FOOTPRINT. THE
DETENTION BASIN SHALL BE PROVIDED TO RETAIN SURFACE
RUNOFF AND SILTS.
THIS PLAN WAS PREPARED FROM AN ON THE GROUND INSTRUM NT
SURVEY. THE BEARINGS AND DISTANCES SHOWN WERE TAKEN FROM
A PLAN RECORDED AT THE BARNSTABLE REGISTRY OF DEEDS IN BOOK
280 PAGE 16, TITLED "PLAN OF LAND IN SOUTH YARMOUTH, MA.,
AS SURVEYED FOR DWIGHT ROGERS, BY CROWELL & TAYLOR CORP.", DATED
MAY 1972. BOOK 280 PAGE 16 ALSO SHOWS THE PRECISE LOCATION OF
THE EXISTING DWELLING. i
THIS PLAN IS BASED ON NGVD. DATUM
;z?A3W
W
�; � " i � PAVED DRIVgW AY
A5.51
/�� j 51322
t
PROPOSED J �Rw4 A�18.3 P
ty� SE 20.8 I� / rn 0 ✓,
sp,
RETAINING
INGALLS m. � � 3� 33 U 5 GA� �F ON cD �a9 _
,sL 0 a� 5 15 , EGg / dtI e/ _r� P
O0lJ S� 1 E a�St Y X12.1 0
19/
2 .3 P
THIS AREA TO BE a /) (� �� } C ��� V'
ALO �C p SELECTIVELY PRUNED A �!� _t _ , - 1/ may. / 13.3 Ft�5��
o p1J o� o
L 2p 20� k ( 1�3 CP
_�'N
15. E`1
iG
s.; 11.EtJcl
. \ \ • `/ 5 , E q � � �� �� \ � `o
L
CP t
,ice o�✓G h 9�OlS5Og
.A�"
5� F 2
E Ev
00028, �i511 GRP���63 mi �8+5�� 22.9 F
o�N5 2 �
gQ.\0
t B B 9u 0 / r ?f� j
/
lcl
A 20' WIDE STRIP OF y� 1�' 0
INDIGENOUS PLANTS IS T BE l P r v
PLANTED AND MAINTAINED 0 THE
NORTH OF THE EXISTING R PRAP
WALL. PLANTS SHALL BE cvr 1 PROPOSED
PLACED 5' ON CENTERI '�f RETAINING
r*1
BENCKMARK;
TOP OF CB/DH
ELEVATION 20.12
THE CONTRACTOR SHALL HAVE 'Zp WALL LEGEND:
THE PLANT TYPES ED o
BY THE CON. COM. PRIORPRIOR TREE LINE TO '' � ' � mo '�
THE START OF INSTALLAT ON. O
A 4' WIDE FOOTPATH DRYRELL
TO THE STAIRS IS TO REMAIN
PROPOSED SPOT ELEVATION 12+0 P
EXISTING SPOT ELEVATION 11.08 E
0 10 20 30' 40'
SCALE 1' 20'l REV.02/16/00 JDR
�2 REV 12/08/99 JDR
I
i
119.18'
N06 -11,53"V
S06°31'53"F.�� g
119.23' �GO,
Op.,
14.
T_p �P�•(N OF M,gssgc
Pa PAUL ti� �.
RYYLL
o No.32448 y
/D SLR`
tN
F "
I JOHN <{
�'�CAULEY e'
No. K101 ! it
SITE PLAN
PREPARED FOR
ON HOMES
OF
#422 - GHBANK ROAD
ARMOUTH, MA
J.E. LANDERS-CAULEY, P.E.
CIVIL ENVIRONMENTAL ENGINEERING
P.O. BOX 364 WEST FALMOUTH, MA 02574
(508) 540-7733 ph. (508) 540-3022 ph.
508 540 — 3344 fax
14 DATE: 09 27 99
ILE: 1" = 20' IDRAWN BY: JDR
I N0. 857 SHEET: 1 OF 1
�vrGh