HomeMy WebLinkAbout185 Highbank Road Sewage Disposal System Design 3SOIL TEST PIT DATA: xxx
TEST PIT #1 TEST PIT - 2
GRD EL. X GRD. EL. X
GVJ. EL X GW- FI - X
0'
2'
4'
5'
6'
7
Q'
10'
17'
A
B
EL = XX
C
76"
EL = XX
6„ LOAM SANDY 10YR 4/3
1'
LOAM SANDY 10YR 6/5 2'-
28"
3'
4'-
7'-
8,_
'7'8'
SAND 10YR 6/6
9,
10
132" 11'
a�
LOAM SANDY IOYR 4/3
8"
LOAM SANDY 10YR 6/5
30"
SAND 10YR 6/6
120" INDICATES
,7_ OBSERVED
GROUND WATER
DATE:
Ap
DATE:
B
EL
= XX
C
EL
= XX
LOAM SANDY IOYR 4/3
8"
LOAM SANDY 10YR 6/5
30"
SAND 10YR 6/6
120" INDICATES
,7_ OBSERVED
GROUND WATER
DATE:
ASSUMED
DATE:
BENCH MARK USED:
INDICATES
B
X
X
X
PROFILE: NOT
3, ESTIMATED
SEPTIC TANK (OUT)
TEST
BY:
TEST
BY:
- SEASONAL HIGH
TO WITHIN
THE
BSC GROUP, INC.
THE
BSC GROUP, INC.
GROUND WATER
INVERTS AT LEACHING FACILITY:
WITNESSED BY:
WITNESSED BY:
4" INVERT AT
BEGINNING
X
u�,
X
X
G
ELEVATION AT
INDICATES
SIDE 20
PERC.
RATE:
PERC,
RATE:
H
EXISTING UTILITY SYSTEM IN SERVICE.
PERC.
TEST
NOT IN A ZONE II DtS1RICT
2
MIN./INCH
2
MIN./INCH
1=D
ARE SHOWN. LOCATIONS AND
SOIL
EVALUATOR
SOIL
EVALUATOR
AND STRUCTURES AS REQUIRED PRIOR
TO THE START OF CONSTRUCTION.
X
6 THIS SYSTEM IS NOT DE�JGNED FOR
X
A GARBAGE GRINDER IS NOT
RECOMMENDED DUE TO RECD IgD
1=C
FACILITY.
1-E
`3Y BSC GROUP
657 Main Street, Unit 6
-'
INDICATES
508 778 8919
SOIL
CLASS:
SOIL
CLASS:
DIST. BOX
SEPTIC
UNSUITABLE
ll'E [
X
6"
X
IVAN DEMIRANDA
185 HIGHBANK RD.
SOUTH YARMOUTH
MATERIAL
DATE: JANUARY 8, 2001
L. T. A. R. L. T. A. R.
0.74 G.P.D./SQ.FT. 0,74. G.P.D./SQ.FT.
DATUM:
VERTICAL DATUM:
ASSUMED
4" INVERT AT
BENCH MARK USED:
X
B
BENCH MARK SET:
X
X
PROFILE: NOT
TO SCALE
SEPTIC TANK (OUT)
EL.= A
D
4" INVERT AT
TOP FOUNDATION
CONCRETE COVERS
TO WITHIN
EL.= X
6" OF FINISHED
GRADE.
F
47.,
INVERTS AT LEACHING FACILITY:
SHALL APPLY.
3. ALL PIPE CONNECTIONS AND CONCRETE
2-24" DIA CONCRETE MANHOLES
2" MIN.
4" INVERT AT
BEGINNING
4" PVC
u�,
OF LEACHING CHAMBER
X
G
ELEVATION AT
SCH 40
SIDE 20
1.
4" PVC SCH 40 °
„ 7/ /
�/' ��
CHAMBER
X
H
EXISTING UTILITY SYSTEM IN SERVICE.
OVERLAY DISTRICT:
NOT IN A ZONE II DtS1RICT
1=B
AT TEL. 1-888-344-7233. THE
ZONE DISTRICT:
ZONE 'C•
1=D
ARE SHOWN. LOCATIONS AND
ELEVATIONS OF UNDERGROUND UTILITIES
�=G
CONTRACTOR SHALL VERIFY SIZE.
LOCATION AND INVERTS OF UTILITIES
AND STRUCTURES AS REQUIRED PRIOR
TO THE START OF CONSTRUCTION.
6 THIS SYSTEM IS NOT DE�JGNED FOR
6"-J
A GARBAGE GRINDER IS NOT
RECOMMENDED DUE TO RECD IgD
1=C
FACILITY.
1-E
`3Y BSC GROUP
657 Main Street, Unit 6
-'
026x3
508 778 8919
PROJECT TITLE:
SEWAGE DISPOSAL
5 OUTLET1=F
'--- -ON
1500 GALL
DIST. BOX
SEPTIC
TANK
ll'E [
MAY 4, 2001
6"
STONE BASE
NVERT ELEVATIONS
TOP OF FOUNDATION
100.48 A
4" INVERT AT
BUILDING
98.38
B
4" INVERT AT
SEPTIC TANK (IN)
X
C
4" INVERT AT
SEPTIC TANK (OUT)
X
D
4" INVERT AT
DIST. BOX (IN)
X
E
4" INVERT AT
DIST. BOX (OUT)
X
F
47.,
INVERTS AT LEACHING FACILITY:
SHALL APPLY.
3. ALL PIPE CONNECTIONS AND CONCRETE
2-24" DIA CONCRETE MANHOLES
' ' .r r ' '4"'' °�'"' 2 cvc saeaiee
T UNLESS UNDER PAVEMENT, DRIVES OR
T TRAVELED WAYS WHEREIN H-20 LOADING
4" INVERT AT
BEGINNING
°
°
114
OF LEACHING CHAMBER
X
G
ELEVATION AT
BOTTOM
SIDE 20
SIBLE FOR PROPERLY LOCATING AND
OF LEACHING
CHAMBER
X
H
NO GROUNDWATER
OBSERVED X J
VARIANCES REQUESTED:
FIRST PIPE LENGTH
TO BE SET LEVEL
FOR MIN. 2'
FINISH GRADE
EL. = X
4" PVC (PERF)
I H
SEPERATION
NO OBSERVED GROUNDWATER
J BOTTOM OF TEST HOLE
SEPTIC TANK DETAIL: 1,500 GALLON DISTRIBUTION BOX DETAIL: NOT TO SCALE LEACHING DETAIL: NOT TO SCALE
NOT TO SCALE N0, OF OUTLETS 5 1 26.25'
NOTES: 1. SEPTIC TANK SHALL BE STEEL 5. INLET AND OUTLET TEES TO BE CAST IRON, FINISHED GRADE° o0 0 0 00 0 0 ° 0 0 0 ° o ° 0 0 0 0 0 0 0 0 0 0 0 0
REINFORCED CONCRETE. SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE. 0 00 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2. SEPTIC TANK TO WITHSTAND H-1.0 LOADING TEES TO BE CENTERED UNDER MANHOLE COVER.
UNLESS UNDER PAVEMENT, DRIVES
J
REMOVABLE-, �`--- 2" WALLS
COVER I NOTES:
oo
PERFORATED'OF
OF LEACHING
0 0 0
cc
OC' , DENS TY
'n 0 'O / POLYETHYLENE
(b 0 INFILTRATOR 3050
! O LEACHING
000 CHAMBER
On
0
T
POLYETHYLENE
OR
1
I`
3. ALL PIPES LOCATED UNDER PAVEMENT
X UNITS
o°
BOTTOM = 12' X
35' = 420
PRQPOSED LEACHING FACILITY NOR
TRAVELED WAYS, WHEREIN H-20 LOADING
+, rr, rr, r r 1, DIST. BOX TO WITHSTAND H-10 LOADING
°
LOCUS INFORMATION
ALL TOPSOIL, SUBSOIL AND OTHER
oo
52 " 12''
47.,
0
4" PVC °
PIPE oo
SHALL APPLY.
3. ALL PIPE CONNECTIONS AND CONCRETE
2-24" DIA CONCRETE MANHOLES
' ' .r r ' '4"'' °�'"' 2 cvc saeaiee
T UNLESS UNDER PAVEMENT, DRIVES OR
T TRAVELED WAYS WHEREIN H-20 LOADING
ASSESSORS MAP:
HIGH DENSITY
POLYETHYLENE INFILTRATOR 3050
°
°
114
ZONINO DISTRICT.
CONSTRUCTION SHALL BE WATERTIGHT. 0 0 0 0 0° o 0 0 0 0 0 0 0 -
W METAL HANDLES BROUGHT Tt5„ o°o0 0 0 00 0 0 0 0000 0 0000°0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
I T SHALL APPLY, 0 0 0 0 0 0°
4. FILL ALL UNUSED KNOCKOUTS WITH TO 6" OF FINISH GRADE J -
MORTAR. a- 2. PROVIDE INLET TEE OR BAFFLE WHERE
6" 5,5" OUTLETS 8" � � 35'
TEE TO BE UNDER SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR PLAN VIEW - LEACHING CHAMBERS
M.H. OPENING 12" MIN. " o �o „� o� 'r or"' i �.o r .-�-_ IN PUMPED SYSTEM.
COVER �/ 8' c �a vgaaoo`q�a��egap 4n��a° dao �a
. . 2° 3. FIRST TWO FEET OF PIPE OUT OF DIST.
RAISE M.H W I BOTTOM ON LEVEL/�'///�\ f-OAM & SEED DISTURBED AREAS
10-6
30"
I
OF LEACHING
0 0 0
cc
OC' , DENS TY
'n 0 'O / POLYETHYLENE
(b 0 INFILTRATOR 3050
! O LEACHING
000 CHAMBER
PRECAST SEPTIC TANK
_ C O
` USE HIGH DENSITY
POLYETHYLENE
SEWER BRICK !'. STABLE BASE 6 MIN. 3/4 TO BOX TO BE LAID LEVEL.
& MORTAR .. ." _ 1 1/2" CRUSHED
CROSS-SECTION STONE BASE 4. ALL PIPE CONNECTIONS AND CONCRETE 3' MAX. COMPACTED FILL 36" MAXIMUM, 12"MINRvIUM
NCRMAL WATER LEVEL CONSTRUCTION SHALL BE WATERTIGHT. - o
y 1.
r foo 00 0°0000 000 0 0 0 ° o i
10" 20•
INLET -TEE ,R 4L9'
5'-2• , •
4� 4'-0" MIN, 90, SEND CN �� i5 1/2"
a'�6• L'IOUID DEPTH OUTLET ONTRROL)
5.
d°Gu BOTTOM ON LEVEL STABLE BASE'
12
PLAN VIEW a� 7 1/2
s" MIN. 3/4" To Ui/..0/i� CROSS-SECTION VIEW ��'�//O..a/ir�� 22
1 112" STONE PLAN VIEW CROSS-SECTION OF CHAMBER
5. FILL ALL UNUSED KNOCKOUTS WITH MORTAR.
•
30"
24
EFFEC.
DEPTH
OF LEACHING
0 0 0
cc
OC' , DENS TY
'n 0 'O / POLYETHYLENE
(b 0 INFILTRATOR 3050
! O LEACHING
000 CHAMBER
0 000 0 0
OOOOO 0',
O O
O O 0
0 O
SOU
` USE HIGH DENSITY
POLYETHYLENE
3 LAYER
PEASTONE
REMOVE
UNSUITABLE
MATERIAL FOR
5' ALL AROUND
IF APPLICABLE
f
3. ALL PIPES LOCATED UNDER PAVEMENT
STDEWALL = 2(12'+35')
X 2' = 188
BOTTOM = 12' X
35' = 420
PRQPOSED LEACHING FACILITY NOR
608S.F,
608 S.F x 0.74 GPD/SF = 450GPD
LOCUS INFORMATION
ALL TOPSOIL, SUBSOIL AND OTHER
47" ...-- 50"
L_
IVAN 0EI12ANDA
47.,
DOC. E36619 CERT.136783
3/4" - 1 1/2"
WASHED STONE -
ASSESSORSAP 90
CB/DH PARCEL 48
FND.
A0' 9.0
,E
A 51'2 50 9 .0
CB/DH
FND. 99.1 99.
w 99.0
LOT 109 6OL SHED
ASSESSORS MAP 90 \
PARCEL 45 9.1
DECK J,
99.4
EXIS T 000 QAI. c1
BULKH ` \
\ 99.3
'9 5 EXISTING
HOUSE #185
I TOF=100.48
4 BEDROOMS Qq o x9.9
TO BE REMO
W
p s
99.6
v
I IDo.oSTOOP1
I
ASSESSORS MAP 80
PARCEL 112 I \ 99.7
I 99.7LOT C
\
0425 MAP $0
PARCEL
� I
IP 0.0
FND. UP 19.8
00
BENCHMARK:TOP OF IP �' DRIVEWAY �,
ELEVATION 100.0 DRIVEWAY J �p
100.1LOT 107 I
J 1
199._ 8•
ASSESSORS MAP 80 I
PARCEL 113 I
i
4 -
a
100.8
TID
LOT 10
ASSESSORS MAP 90
PARCEL 47
100.1 I _ -T v4L. ICE
0
ASSESSORS M P 90
PARCEL 46
100.0 s 0pA0�l
NONE wo
100.2 ��� �p
99.9 SPOT ELEVATION 42 4 g3 56 '
-OHI:- OVERHIEAD ELECTRIC N 8671:30' w 59 .00 Ad -*IDS) � Of'i'��%���
i
LIP UTILITY POLE �P
® WO WATER GATE aw'- N� ROP` '��-
4 HYD HYDRANT ��' N\NBP` a„i��
�i
�s
00
OWI 100 doop
dop low
HYD ap��i
PLAN VIEW
SCALE: V = 20 FEET
0 10 20 40 FT.
DESIGN CRITERIA:
DESIGN LOW:
4 BEDROOMS AT110G.P.B./D 440 G.P.D.
REQUIRED SEPTIC TANK:
440 X 200'/. = 880 GAL.
SEPTIC TANK PROVIDED: = 1500 GAL,
SIZE OF LEACHING FACILITY REQUIRED:
DESIGN PERC. RATE: <2 MIN./ INCH
LONG TERM APPL. RATE 0.74 G.P.D/S. F.
440 GPD _ 0.74 GPD/SF 595 S.F.
LOCUS PLAN: N❑ SCALE
J / LOCUS
LAEAN
POND
t
N
REVISIONS
FACILITY PROVIDED:
ISIZE
OF LEACHING
CONSTRUCTION OF THE SEWAGE.
DISPOSAL FACI_ITY ONLY.
` USE HIGH DENSITY
POLYETHYLENE
LEACHING CHAMBERS(4 UNITS) 12'X2'X35'
f
3. ALL PIPES LOCATED UNDER PAVEMENT
STDEWALL = 2(12'+35')
X 2' = 188
BOTTOM = 12' X
35' = 420
PRQPOSED LEACHING FACILITY NOR
608S.F,
608 S.F x 0.74 GPD/SF = 450GPD
LOCUS INFORMATION
ALL TOPSOIL, SUBSOIL AND OTHER
CURRENT OWNM
IVAN 0EI12ANDA
TME REFQtQ1CF.
DOC. E36619 CERT.136783
PLAN REFERENCE
L.C. 17392-C
ASSESSORS MAP:
80
PARI
114
ZONINO DISTRICT.
R-40
SETBACKS:
FRONT 30
IN THE DRAWINGS ARE APPROXIMATE.
SIDE 20
SIBLE FOR PROPERLY LOCATING AND
REAR 20
MINIMUM LOT SIZE:
40,000 S.F.
GROUNDWATER
EXISTING UTILITY SYSTEM IN SERVICE.
OVERLAY DISTRICT:
NOT IN A ZONE II DtS1RICT
FEMA FLOOD
AT TEL. 1-888-344-7233. THE
ZONE DISTRICT:
ZONE 'C•
LOCUS PLAN: N❑ SCALE
J / LOCUS
LAEAN
POND
t
N
REVISIONS
NO. DATE DESCRIPTION
GENERAL NOTES:
1. THIS PLAN IS FOR DESIGN AND
CONSTRUCTION OF THE SEWAGE.
DISPOSAL FACI_ITY ONLY.
2. ALL CONSTRUCTION METHODS AND
MATERIALS SHALL CONFORM TO MASS.
D.E.P TITLE 5 AND LOCAL BOARD
OF HEALTH REGULATIONS.
3. ALL PIPES LOCATED UNDER PAVEMENT
OR TRAVELED WAY SHALL BE SCHEDULE
40 OR EQUAL.
4. THERE ARE NO KNOWN PRIVATE 'HELLS
LOCATED WITHIN 150 FT. OF THE
PRQPOSED LEACHING FACILITY NOR
ANY KNOWN WELLS PROPOSED WITHIN
150' OF ANY KNOWN LEACHING FACILITY.
5. WITHIN LIMIT OF EXCAVATION REMOVE
ALL TOPSOIL, SUBSOIL AND OTHER
IMPERVIOUS MATERIAL.
6. REPLACE WITH CLEAN WASHED SAND
OR OTHER CLEAN GRANULAR SOILS
CONFORMING TO THE FOLLOWING
SIEVE ANALYSIS:
10io (MAX) BY WT. SHALL
PASS No. 50 SIEVE
<10 % OF No. 4 SIEVE SHALL
PASS No. 100
<5% OF No. 4 SIEVE SHALL
PASS No. 200
UNIFORMITY COEFFICIENT @ No. 4
SIEVE </=6.0
7. EXISTING UTILITIES WHERE SHOWN
IN THE DRAWINGS ARE APPROXIMATE.
THE CONTRACTOR SHALL BE RESPON-
SIBLE FOR PROPERLY LOCATING AND
COORDINATING THE PROPOSED CON-
STRUCTION ACTIVITY WITH DIG -SAFE
AND THE APPLICABLE UTILITY
COMPANY AND MAINTAINING THE
EXISTING UTILITY SYSTEM IN SERVICE.
DIG -SAFE SHALL BE NOTIFIED PER
THE STATE OF MASSACHUSETTS
STATUTE CHAPTER 82, SECTION 409
AT TEL. 1-888-344-7233. THE
ENGINEER DOES NOT GUARANTEE
THEIR ACCURACY OR THAT ALL
UTILITIES AND SUBSURFACE STRUCTURES
ARE SHOWN. LOCATIONS AND
ELEVATIONS OF UNDERGROUND UTILITIES
TAKEN FROM RECORD PLANS. THE
CONTRACTOR SHALL VERIFY SIZE.
LOCATION AND INVERTS OF UTILITIES
AND STRUCTURES AS REQUIRED PRIOR
TO THE START OF CONSTRUCTION.
6 THIS SYSTEM IS NOT DE�JGNED FOR
THE USE OF A GARBAGE GRINDER.
A GARBAGE GRINDER IS NOT
RECOMMENDED DUE TO RECD IgD
ADVERSE IMPACTS TO THE LEACHING
FACILITY.
`3Y BSC GROUP
657 Main Street, Unit 6
W. Yarmouth Massachusetts
026x3
508 778 8919
PROJECT TITLE:
SEWAGE DISPOSAL
SYSTEM DESIGN
185 HIGHBANK RD
SOUTH YARMOUTH
MASSACHUSETTS
(BARNSTABLE COUNTY)
ll'E [
MAY 4, 2001
TOWN OFYARMOIT
PREPARED FOR: BOARD OF APP LI
IVAN DEMIRANDA
185 HIGHBANK RD.
SOUTH YARMOUTH
MASSACHUSETTS 02664
DATE: JANUARY 8, 2001
COMP./DESIGN: L, MocDCNALD
CHECK: C. FIELD
DRAWN: P. HAGIST
FIELD: D. GAZZOLO / J. MCCARTIN
FILE NO. 8253-SEP.DWG
DWG NO. 527? -01
SHEET 1 OF
JOB NC 4-825_.00
11
5