REVISIONS
NO. DATE DESCRIPTION
SEPTIC TANK DETAIL:
1,500 GALLON
DISTRIBJTION BOX DETAIL:
NOT TO SCALE
LEACHING DETAIL' NOT TO SCALE
SOIL TEST PIT DATA:
MAY 31, 2005
OF HEALTH REGULATIONS.
3. ALL PIPES LOCATED UNDER PAVEMENT
OR TRAVELED WAY SHALL BE SCHEDULE
40 OR EQUAL.
4. THERE ARE NO KNOWN PRIVATE WELLS
LOCATED WITHIN 150 FT. OF THE
PROPOSED LEACHING FACILITY NOR
ANY KNOWN WELLS PROPOSED WITHIN
NOT TO SCALE
5. WITHIN LIMIT OF EXCAVATION REMOVE
ALL TOPSOIL, SUBSOIL AND OTHER
NO. OF OUTLETS : 5
6. REPLACE ALL EXCAVATED MATERIAL WITH
30.0
D -Box
9
TEST PIT #1-
MIXTURES AND LAYERS OF DIFFERENT CLASSES
NOTES: 1. SEPTIC TANK SHALL BE STEEL
5. INLET AND OUTLET TEES TO BE CAST IRON,
FINI'HED GRADE
SIEVE, SHALL BE PERFORMED ON A
4" PVC
BY WEIGHT OF THE FILL SAMPLE MAY BE
GRD. EL. 78.7 DATE:
HIGH GROUNDWATER COMPUTATION
REINFORCED CONCRETE.
SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE.
MATERIAL MEETS EACH OF THE FOLLOWING
SPECIFICATIONS:
PIPE 00 0 0 00 0 0 0 0 0
0) 0 O p 0 p 0 0 0 0 O 0 0 0 0 T
EST. HIGH GW. 68.2 5/31 /05
(BASED ON TP#1
2. SEPTIC TANK TO WITHSTAND H-10 LOADING
UNLESS UNDER PAVEMENT, DRIVES OR
TEES TO BE CENTERED UNDER MANHOLE COVER.
REMOVABLE 2" WALLS
COVER
NOTES:
0 0 0 0 0 p o 0 0 0 0 0 0 0 0 0 0 p p o p o
0 c
TEST BY:
DEPTH TO BOTTOM OF HOLE 11.0
TRAVELED WAYS, WHEREIN H-20 LOADING
SHALL APPLY.
COORDINATING THE PROPOSED CON-
ti.;y ,y;y ,q:;y ;;y ;; 2.
we RAFOM
1. DIST. BOX TO WITHSTAND H-10 LOADING
°
0
4 UNITS °o
IOYR 3/1 THE BSC GROUP, INC.
LOAMY SAND 13" WITNESSED BY:
-
INDEX WELL MIW_29
3. ALL PIPE CONNECTIONS AND CONCRETE
2-24" DIA CONCRETE MANHOLES
f
UNLESS UNDER PAVEMENT, DRIVES OR
TRAVELED WAYS WHEREIN H-20 LOADING
° HIGH DENSITY ° 50" 12
0 0 ° 0
o POLYETHYLENE INFILTRATOR 3050
B
WATER LEVEL RANGE ZONE _�
CONSTRUCTION SHALL BE WATERTIGHT.
W/ METAL HANDLES BROUGHT
LOCATION AND INVERTS OF UTILITIES
SHALL APPLY.
o°
o ° 0 ° 1
LYNN MULKEEN
1 OYR 5/8
LOAMY SAND PERC. RATE:
CURRENT DEPTHONDEX WELL(5/OS) 6.4 _
WATER LEVEL ADJUSTMENT
4. FILL ALL UNUSED KNOCKOUTS WITH TO 6" OF FINISH GRADE
MORTAR. TEE TO BE UNDER
15•
8"
6" "
2. PROVIDE INLET TEE OR BAFFLE WHERE
00
0 00 0 0 00 0 0 opo
°°° o
0 0 0 0 0 0 0 0 0 0 0 0 p o 0 0
° 0 0 0 0 00000 0 0 0 0 0 0
_ _P_- __
12• MIN.
5,5' JUILETS
FACILITY.
24"
DEPTH TO ADJUSTED HIGH WATER 10.5 _
M.H. OPENING
AVER
'"�
SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR
35'
EL = 76.7 -Z-MIN./INCH
W. Yarmouth Massachusetts
xe A 3"
�ea� e ,a ,ea�aa i
IN PUMPED SYSTEM.
PLAN VIEW - LEACHING CHAMBERS
SOIL EVALUATOR
M. DIBB, P.E.
SYSTEM REPAIR
RAISE M.H
r
W� 4"
2'
BOTDM ON LEVEL
3. FIRST TWO FEET OF PIPE OUT OF DIST.
LOAM
& SEED DISTURBED AREAS
P.O. BOX 170
ONE HOMER AVENUE
10'-6" SEWER BRICK e.-�--:_ q.e -:_-:
ST BLE BASE 6' MIN. 3 4" TO
1 1/2" Cf�USHED
BOX TO BE LAID LEVEL
CONCRETE
DATE: JUNE 8, 2005
-1711
SOIL CLASS:
DRAWN: P. HAGIST
10'-0' do MORTAR
12" c
CRSS -SECTION STONE BASE
4. ALL PIPE CONNECTIONS AND
3' MAX. COMPACTED
FILL 36" MAXIMUM 12"MINIMUM
1
NORMAL WATER LEVEL
a =3- �=
CONSTRUCTION SHALL BE WATERTIGHT.
0 p 0 0 p 0 pOo 0 0 0 0 0
o o p o 000 o p opo o p 3" LAYER
C 64 "
L. T. A.R.
L. T.
tOYR 7�3
INDICATES
ESTIMATED INDICATES
_ PERC.
- SEASONAL HIGH
PRECAST SEPTIC TANK
`-
t0" 14"
` INLET TEE :S
5. FILL ALL UNUSED KNOCKOUTS 1M M A .
PEASTONE
T O DENSITY 0000
30" 0 00 O
G.P.D./SQ.FT.
GROUND WATER TEST
a 5'-1'
30 1/2'
24" p
POLYETHYLENE 00 0
MEDIUM AND
-
�O O
050 0
INFILTRACHO
INDICATES
INDICATES
_ O V-2• 4'-6" :� 5'-8'
4'-0" MIN. av eQa ow
- _ =:
15 1 2"
/
I DEPTH `b0 0 0
00
NG
�_ OBSERVED ❑
- GROUND WATER UNSUITABLE
5-6"
LIQUID DEPTH (GAS �� �
:c =:
PRECAST DIST.
1 �
CHAMBER 00
= 126"
-
MATERIAL
r '.
�X
47"
3/4" - t 1/2"
50" 47" WASHED STONE
132"
� :.e-a�::. •a-8.:: e'+1:: ee •-': : : '.t,e-.. se_:�•::e
12'
EL = 67.7
�� ��
BOITOM ON LEVEL STABLE BASE b$a •
3
(-
PLAN VIEW
6" MIN. 3/4' Todt``��
CROSS-SECTION VIEW d�4X.�lbX.�
7
)LAN VIEW
CROSS-SECTION
OF CHAMBER
1 1/2" STONE
DATUM
VARIANCES REQUESTED:
VERTICAL DATUM: ASSUMED
.•�.
_,► ..
"``:
DESIGN CRITERIA:
NONE
BENCH MARK USED: TOP OF FOUNDATION
ELEV 80.00
�
DESIGN FLOW:
It
LFAAIG A.
cN�
4 BEDROOMS AT 110 G.P.B./D 440 G. P.D.
PROFILE:NOT TO SCALE
3880039
EL= A
OP FOUNDATION
/To
FIRST PIPE LENGTH
I '► LMO �/
'!i
REQUIRED SEPTIC TANK:
CONCRETE COVERS TO WITHIN
TO BE SET LEVEL
-
440 )( 200% - 880 GAL.
EL=79.2 6" OF FINISHED GRADE.
FINISH GRADE
EL.-78.5S-�RGLT
71 FOR MIN. 2'
CC
\� b/g�is
SEPTIC TANK PROVIDED: _SAL•
a" Pvcf
4' PVC SCH 40
UP M p,�N �pE YARMOUTH ROAD
D 40 BOUND W/REBAR
\ \
SCH 40 4' PVC H
LEACHING CHAMBER
Oy S _
FOUND
, ,_ -�
ut
SIZE OF LEACHING FACILITY REQUIRED:
1g37 LAYOU BRCKEN
�
DESIGN PERC. RATE: <2 MIN./ INCH
_ B 1=D
I=G
°�� �'
`
e: I=C I=E H
�- 5 OUTLET 1=F
.�` -
4`
\
l
LONG TERM APPL. RATE 0,74 G.P.D/S.F.
DIST.
BOX 5.3' SEPARATION
`
440 GPD + 0,74 GPD/SF
SEPTIC TANK
\N 77.83 \Z.;9
Q \
= 596 S.F.
1 EST. HIGH GROUNDWATER
9.6 y1 \ U)
GUT 77•45'p0
79.7
J
POLE
RAID FEt,CE \\
1\ \
SIZE OF LEACHING FACILITY PROVIDED:
/ AN D
O4
USE HIGH DENSITY POLYETHYLENE
I f
�'I;
INVERT ELEVATIONS:
31.3' `li
WOOD
2 STORY
FRAME\�
LEACHING CHAMBERS(4 UNITS) 12'X2'X35'
1
TOP OF FOUNDATION
80.0 A\\x
78.5
$
1
SIDEWALL = 2(12'+35') X 2' = 188
4 INVERT AT BUILDING
76.60 B REPLUMB EXISTING,
\ STOOP \1
BOTTOM _' 12' X 35' =.420
4" INVERT AT SEPTIC TANK (IN)
76.10 C
X 79.4 \
,� e6 23 ,S \
608
608S,F,
4" INVERT AT SEPTIC TANK (OUT)
75.85 D
\ X ,-�\\ o
_
608 S.F 0,74 GPD/SF 449GPD
4" INVERT AT DIST. BOX (IN)
75.74 E
14.3 N
'� 't\ `p
�+ 10° o \ �
2
TIM
C>
4" INVERT AT DIST. BOX (OUT)
75.57 F
N O,\ Q�
-t � 2 STORY �_ 1� \
\
WOOD FRAME
INVERTS AT LEACHING FACILITY:
$: DWELLING Tp#1 10� \
1�_ 101, TOF 80.00 10,9' MIN �\6 Q`
LOCUS INFORMATION
4" INVERT AT BEGINNING
76.0
CRAWL 10 ��\ L
MI V ° \ -
LOT 1
OF LEACHING CHAMBER 75.50 G BREAKOUT
`1 10' �° i N 1 U 2 14,246± S.F.
U
ELEVATION AT BOTTOM
3p5 TOO MIN ;\ G
11,8' , 0 \ a
N/F
EXISTING S.A.S NEWELL REALTY TRUST
CURRENT OWNER: JOHN & DIANE RYAN
OF LEACHING CHAMBER
73.50 H
"
/ / 4 PVC \\ to
TO BE PUMPED, AND ASSESSORS MAP 60
TITLE REFERENCE: DEED BOOK 12085/120
PROPOCSE D f /� / / / 1 8.8 \
REMOVED FROM THE
PARCEL 223
ADJUSTED
68.20 J
�-A PROPOSED
SITE IN ACCORDANCE
DEED BOOK 12263/28
PLAN REFERENCE: NO RECORD PLAN
GROUNDWATER
11 3' 20? 15' 10'
WITH TITLE 5
ROP 15001 \ MIN \ 12'x35'
NO OBSERVED GROUNDWATER
t°\
NEW FND. WOOD FRAM GAL SE 1 3\ S.A.S.
ASSESSORS MAP: 60
BOTTOM OF HOLE
67.70
x UNDER DWELLING NK \
PARCEL: 231
COTTAGE I78.8 256•UP REMOVE
0'
SINE
ZONING DISTRICT. RS -40
O
g,15' 78.5 EXISTING
SHED i
FENCE
SETBACKS: FRONT 3n0'
TREE
SIDE 20'
FIRST FLOOR PLAN
SECOND FLOOR PLAN
w 77.7
REAR 20'
78 3X7.6'
N/F X 203
OVERLAY DISTRICT: NONE
-t J. JOHN & DIANE GRAVEL
BENOIT RYAN DRIVEWAY
NITROGEN SENSITIVE
ASSESSORS
ZONE: NOT A ZONE II
GARAGE
MAP 60 % 78 7
MINIMUM LOT SIZE: 40,000 S.F.
DINING LIVING
3EDROOM #1
PARCEL 231i
�
EXISTING LOT SIZE: 12,932± S.F.
BEDROOM #3
12,932±S. F. / I POST
AND N/F
MAX. LOT COVERAGE: 25% (3,233± S.F. ALLOWED)
N/F JOHN & PATRICIA CREIGHTON
79.0RAIL FENCE ASSESSORS MAP 60
PRDP. LOT COVERAGE: 19.4% (2,517± S.F.)
RICHARD DAVIS 10.3' 78 6
PARCEL 224
FEMA FLOOD
ASSESSORS MAP 60 29 6' 78.1 853
DEED BOOK 7329 305
/
ZONE DISTRICT: "C" DATED 6/17/86
PARCEL 232 NCE
F�23„E
#250015 0004 C
OFFICE /
BEDROOM
QICKES
FILE COPY
KITCHEN GREAT ROOM
#2
7
1. N�g02
LOCUS PLAN: N❑ SCALE
ENTRY
_
Rs
78.6
FAMILY
N/F
`I
RICHARD CRECCO
NOTE:
28 }
ASSESSORS MAP 60
NEW SEPTIC SYSTEM TO BE INSTALLED
CB/DH
PARCEL 230
UPON COMPLETION OF ADDITION.
FND
PLUMBER TO MAINTAIN USE OF
FUTURE
EXISTING SEPTIC SYSTEM DURING
z Z
/BATHROOM
CONSTRUCTION.
J o E3
ADDITION
►j`�7 9
LOCUS
-< to
N .
CB/DH
1W OF yq •,_
\\4
r
a Z
�C Ao Z
FND
MARK D. s c
S�R� � :
DIBB m'I
S _
COTTAGE /
PLAN VIEW
CIVIL U -
No.459371i
t'P1N
INTERIOR
LAYOUT SHETCH
'��sTe^� .•=`1'
BEDROOM #4
_
Fs�o►uL�
Q�.F'
AS PROVIDED BY OWNER
SCALE: 1' = 20 FEET
0 10 20 40 FT.
REVISIONS
NO. DATE DESCRIPTION
GENERAL NOTES:
1. THIS PLAN IS FOR DESIGN AND
CONSTRUCTION OF THE SEWAGE
DISPOSAL FACILITY ONLY.
2. ALL CONSTRUCTION METHODS AND
MATERIALS SHALL CONFORM TO MASS.
D.E.P TITLE 5 AND LOCAL BOARD
OF HEALTH REGULATIONS.
3. ALL PIPES LOCATED UNDER PAVEMENT
OR TRAVELED WAY SHALL BE SCHEDULE
40 OR EQUAL.
4. THERE ARE NO KNOWN PRIVATE WELLS
LOCATED WITHIN 150 FT. OF THE
PROPOSED LEACHING FACILITY NOR
ANY KNOWN WELLS PROPOSED WITHIN
150' OF ANY KNOWN LEACHING FACILITY.
5. WITHIN LIMIT OF EXCAVATION REMOVE
ALL TOPSOIL, SUBSOIL AND OTHER
IMPERVIOUS MATERIAL.
6. REPLACE ALL EXCAVATED MATERIAL WITH
CLEAN GRANULAR SAND, FREE FROM ORGANIC
MATERIAL AND DELETERIOUS SUBSTANCES.
MIXTURES AND LAYERS OF DIFFERENT CLASSES
OF SOIL SHALL NOT BE USED. THE FILL SHALL
NOT CONTAIN ANY MATERIAL LARGER THAN
TWO INCHES. A SIEVE ANALYSIS, USING A #4
SIEVE, SHALL BE PERFORMED ON A
REPRESENTATIVE SAMPLE OF FILL. UP TO 45%
BY WEIGHT OF THE FILL SAMPLE MAY BE
RETAINED ON THE #4 SIEVE. SIEVE ANALYSES
ALSO SHALL BE PERFORMED ON THE FRACTION
OF FILL SAMPLE PASSING THE #4 SIEVE. SUCH
ANALYSES MUST DEMONSTRATE THAT THE
MATERIAL MEETS EACH OF THE FOLLOWING
SPECIFICATIONS:
1007 MUST PASS #4 SIEVE
(4.75 mm EFFECTIVE PARTICLE SIZE)
10%-100% MUST PASS #50 SIEVE
(0.30 mm EFFECTIVE PARTICLE SIZE)
07.-20% MUST PASS #100 SIEVE
(0.15 mm EFFECTIVE PARTICLE SIZE)
0%-57 MUST PASS #200 SIEVE
(0.075 mm EFFECTIVE PARTICLE SIZE)
7. EXISTING UTILITIES WHERE SHOWN
IN THE DRAWINGS ARE APPROXIMATE.
THE CONTRACTOR SHALL BE RESPON-
SIBLE FOR PROPERLY LOCATING AND
COORDINATING THE PROPOSED CON-
STRUCTION ACTIVITY WITH DIG -SAFE
AND THE APPLICABLE UTILITY
COMPANY AND MAINTAINING THE
EXISTING UTILITY SYSTEM IN SERVICE.
DIG -SAFE SHALL BE NOTIFIED PER
THE STATE OF MASSACHUSETTS
STATUTE CHAPTER 82, SECTION 409
AT TEL. 1-888-344-7233. THE
ENGINEER DOES NOT GUARANTEE
THEIR ACCURACY OR THAT ALL
UTILITIES AND SUBSURFACE STRUCTURES
ARE SHOWN. LOCATIONS AND
ELEVATIONS OF UNDERGROUND UTILITIES
TAKEN FROM RECORD PLANS. THE
CONTRACTOR SHALL VERIFY SIZE,
LOCATION AND INVERTS OF UTILITIES
AND STRUCTURES AS REQUIRED PRIOR
TO THE START OF CONSTRUCTION.
8. THIS SYSTEM IS NOT DESIGNED FOR
THE USE OF A GARBAGE GRINDER.
IS N''0'
RECOMMENDED DUE TO RECOGNIZED
ADVERSE IMPACTS TO THE LEACHINGI
FACILITY.
9. EXISTING INVERTS ARE TO BE CHECKED BY
THE CONTRACTOR PRIOR TO CONSTRUCTION.
0. THE ENGINEER IS TO BE NOTIFIED OF
ANY FIELD CHANGES THAT MAY BE
REQUIRED.
I G
657 Main Street, (RT. 28) Unit 6
W. Yarmouth Massachusetts
02673
508 778 8919
PROJECT TITLE:
DESIGN FOR
SEWAGE DISPOSAL
SYSTEM REPAIR
f
HOMER AVENUE
SOUTH YARMOUTH
MASSACHUSETTS
PREPARED FOR:
JACK RYAN
P.O. BOX 170
ONE HOMER AVENUE
SOUTH YARMOUTH
MA 02664
(508) 394-3300
DATE: JUNE 8, 2005
COMP. DESIGN: K. HEALY
CHECK: M. DIBB
DRAWN: P. HAGIST
FIELD: D. GAZZOLO / J. McCARTIN
FILE NO. 8776-SEP.DWG
DWG NO. 5598-03
SHEET 1 OF 1
JOB NO. 4-8776.00
I�� COPY