Loading...
HomeMy WebLinkAbout4 Homers Dock Road - Elevations0 CONSTRUCTION SET 2/18/10 PLAN NOTE: 1) DRAWINGS BASED ON BEST AVAILABLE INFORMATION AND FIELD OBSERVATION. GENERAL CONTRACTOR TO VERIFY ALL CONDITIONS AND DIMENSION IN FIELD AND ADJUST FOR DISCREPANCIES. BIRCHALL CONSULTING ACCEPTS NO LIABILITY FOR ERRORS OR OMISSIONS. 2) ALL CONSTRUCTION TO BE BY MASSACHUSTTES BUILDING CODE 780CMR SEVENTH EDITION EFFECTIVE 4/ 01 /07 PLANS IN SET: A1.0R FLOOR PLAN, ELEVATION DETAIL A2.0 SECTIONS. NOTES (2) E) 1x5 FF EXISTII ALL NI MATCF NTS VERIFY IN FIELD EXISTii�G REAR ELEVATIONREAR ELEVATION SCALE 1 /�" = 1'-0" AACTUAL LENGT V.I.F. t8' P&M SHINGLE, NEW DORMr SMOKE AND CARBON DIOXIDE DETECTORS. 1) HOUSE HAS EXISTING HARD WIRED SMOKE DETECTORS, REUSE 2) VERIFY IF CARBON DIOXIDE DETECTORS PRESENT, IF NOT INSTALL (2), ONE AT TOP AND ONE AT BOTTOM OF STAIRS. 1 L� /BROSCO BOSTON LAYOUT 10 FLAT TRIM, VERIFY MATCH EXISTING (3) 6x8 8/12 MATCH EXISTING. TRUE MUTTONS, INSULATED GLASS. NUWON POCKETS PROVIDE HURRICANE PLYWOOD PER CODE PROVIDE INSULATED TRUE DIVIDIED LIGHTS OR SINGLE GLAZE W/ TRIPLE TACK STORM WINDOWS - PROPO.ED REAR ELEVATION ' SCALE 1/4�= 1'-0" Ib-AoaA RECEIVED VAR 15 2010 L!;;r -SIHIGHWAY 1.0 0 W Y O 3 W F--:, 48 1--1( Z � F - LL p u) g X F� W F-1 � Z FY F /~ / Q / W W F --, Q o = W tet - 1.0