HomeMy WebLinkAbout4 Homers Dock Road - Elevations0
CONSTRUCTION SET 2/18/10
PLAN NOTE:
1) DRAWINGS BASED ON BEST AVAILABLE INFORMATION AND FIELD
OBSERVATION. GENERAL CONTRACTOR TO VERIFY ALL CONDITIONS
AND DIMENSION IN FIELD AND ADJUST FOR DISCREPANCIES.
BIRCHALL CONSULTING ACCEPTS NO LIABILITY FOR ERRORS OR
OMISSIONS.
2) ALL CONSTRUCTION TO BE BY MASSACHUSTTES BUILDING CODE
780CMR SEVENTH EDITION EFFECTIVE 4/ 01 /07
PLANS IN SET:
A1.0R FLOOR PLAN, ELEVATION DETAIL
A2.0 SECTIONS. NOTES
(2) E)
1x5 FF
EXISTII
ALL NI
MATCF
NTS VERIFY IN FIELD
EXISTii�G REAR ELEVATIONREAR ELEVATION
SCALE 1 /�" = 1'-0"
AACTUAL LENGT V.I.F.
t8' P&M SHINGLE, NEW DORMr
SMOKE AND CARBON DIOXIDE DETECTORS.
1) HOUSE HAS EXISTING HARD WIRED SMOKE DETECTORS, REUSE
2) VERIFY IF CARBON DIOXIDE DETECTORS PRESENT, IF NOT
INSTALL (2), ONE AT TOP AND ONE AT BOTTOM OF STAIRS.
1 L�
/BROSCO BOSTON LAYOUT 10 FLAT TRIM, VERIFY MATCH EXISTING
(3) 6x8 8/12 MATCH EXISTING. TRUE MUTTONS, INSULATED GLASS. NUWON POCKETS
PROVIDE HURRICANE PLYWOOD PER CODE
PROVIDE INSULATED TRUE DIVIDIED LIGHTS OR SINGLE GLAZE W/ TRIPLE
TACK STORM WINDOWS -
PROPO.ED REAR ELEVATION '
SCALE 1/4�= 1'-0"
Ib-AoaA
RECEIVED
VAR 15 2010
L!;;r -SIHIGHWAY
1.0
0
W
Y
O
3
W
F--:,
48
1--1(
Z
�
F -
LL
p
u)
g
X
F�
W
F-1
�
Z
FY
F
/~
/
Q
/
W
W
F --,
Q
o
=
W
tet -
1.0