Loading...
HomeMy WebLinkAbout33.234 - Site Plan and Sewage Disposal Systemq/„ P fnJ�ilSPry 7G` _e5.Fk /, FI FV . II �FV.7Z �: 10' j 0.1 r L�/mac. 12' I/asha ed 112'SYST.EMM_DESIGN ZX. wastone � /Design Flow: 3 bedrooms P gal/day - 3 gal ?X3 o4 -1,1 2 Sept lc Tank: gal. x 200% - ��o gal. S+one Use 1500 Ga I . Tank Leaching Fac i l i il' " / % �/ ' � l� (� ���n��i/•'I�Oi' �.iJO�I Ste✓ l Bottom: /!7XfS S S i des : z�!/7tfisJ�Osa%rpxC7lG/`= 5`/ �a/. I FI FV. !f s TOTAL Gal . Adj.G.W. Note: Garbage disposal is not permitted with this design. �(. Use 6" crushed stone ,, v /vh� under Septic Tank and -gas Dlat. LOCATION MAP 1500 Ga I . 1000GoI Ion Box Leooh ng Fao1I Ity Septic Tank Pump Chamber fa/1; Assessors s Map 33 S e P G//T� � Parcel 234 MonoI ithic Mono ithic � Area 7,500 SF SYSTEM PROF I LE_ — Not to scaleI T" AUGER HOLE TEST HOLE EL PUMP �oc.,,�,'o��% ------------------I��" ° 6.5�— N I— — vrly Sad+d 11 Submersible Pump-�.irir�r. f 9� j� %'v-�i`- �{'�/�l�t�/ /�• Affd 2.1 2' Check Valva - Coet Iron or PVC H,�y eet In horizontal pami Ion - 31 Alarm Panel 41 Pum Chamber - 1000 Galion Tank withyG_ /C� / Pump concrete manhole. ��na%yc0 / �i�(G , �/.Ql7JdG/_' JnI':i �/-1 ptI-f s"M f!'!.1: �' j 51 Alarm in to be on o separate Circuit _ _ _ .// ' 1t•`— — ///7,' �'.',•> { Gl;t �' /✓s-z.?� 7. b From the pump. = c G s - — 61 Piping is to be 2•dlam. PVC for force main and 4dlom. PVC For gravity pipe. Inspection Port Detail /�'lC� ' '-Y'�C/��'~�/^/ - � �,� d ,ra fel Wider- 7) ctier 71 Pump Sequonoe: / fh. 7"4)% / :^%��i, ..c. �nrl (Sr/� �s 1� — ' a) Pump of El. i'.6 // v b) Pump on EI. FiYt2 Jan•� G/ a) Alarm on E1.11 j- /%'O�f�ifiti../.,,.,4� i_wz 54.1 /2o.r �� �•-�fa-.�,-' ., - .- - '.._"rr Date. �/� � �'- N DATE: 41904 2:oop.'j PERFORMED BY: Z Oac�d =s,�PZNOFMAssgo WITNESS: B, ui ur la Y nN ti _ NOTES DESIGN RATE: {2_ mir+./in. o j L �j% a Itz 000 2-p1VE raR Z6Cv N°.294,7 PERCOLATION TEST G5 /Lo 9FG�gTEP��Q EXIST"� �=SSPOOLS ARE TC EE PUMPED AND ssrora.E�� B°= `" LED WITH CLEAN P;LL OR REMOVED. CGGaI?OrtS 6� Waf2N GLf 22 Fi �aVe` /S //V ZONE A9 (FL. lo) Sill -s=' = N .Edepth irr l rn'In qIr C" > UN SOILS ARE T __ REMOVED FOR 5' LEACHING APCA AND REPLACED mrP,0"JED FILL M A coIAL. k�a�e ��min.�incL! ,.r1O//7.- �i/���a1i�'s W 1 A, Pt ��' G>ilG/D % ' . '' DES -E"I' 'NEER TO C- I T'' 'HIES REMOVAL G ROtS AWAI ER �1DJ 1 Da��: 1°.4 �sP . 0,-') r��G�c - - SYSTEM INSTAL I_ ° :. �rI N„EER TO CEP` 1 G' SYSTEM INSTALLATION Ground waiet Fn '313.. ppEg' VI n BACKFILLING. (ndea{f�ell.Ai!(U.Z��Ltat) Cs/D4-�Z,4: 'l•3� s (00 D 15 _-' ON BOX I S TO BE +' A T EP, TESTED AT 00 T rc THE BOARD ^L HEALTH INSPECTION. G/cam` / r /r/ �sGo.lo ALL tr_e, n I STURBED BY Cr'!S ;PUC 1 Ly T ON ARE GRO DWATER ADJ . � cc r_ -ADE E. D AND SEEDED. y°,fieri �s a�. s �T- ®_. e T _ D LOAM CG': . ' Groundwater Found d;_ Elzv. 1L' rce me•+ f �s to overlap 7)Correr reli�fo 1 ndex ale I nfCrrof pal/ Sur4acc r� 10 �' Sealed y 1 O ! W.+h 40rrr/r4o/yJrnyl barrttr• Zone/ %G;�Y/ ��,�=7 /C/ �/�ev /am J �s.� /'9 ke ,va/! i Foo/iMfs 9 E /naerf�oc, Add. G.W. depth =�/. !1/ u r �f,lr, . r /z sr,. ieinf c / /D _ 17 %rI Ctr• ho ins ♦ !JP pMCn I M.r. 7 r �P1 rr Q°� i e rr� f : t� 6� et N o v� Cp�ln' F F- ins t u/a//. l 1 Gia[/ �1, c �' Concre+L RE�p'�)IrJ� per g p� p�� f p�� ^ y�� ' Returning z c'..� tU/ L �� � VR A N ENG I N E IE R I Ell 6Z7 1'§ is C: :,• a wall e -- a L3 •' � a @ ,z' 941 MAIN STREET, SO. NARW I CH, MA 02561 ��'�� 432-2878 P9Jrv:ry, S1 TE PLAN dt SEVIAGE DISPOSAL SYSTEM IN YARMOUTH FOR �C�v`,� .-„ /�✓/ �(/ L/�I Py 1 ,00 r� y([..._Tj. - FAiF,,.s, ROBERT L. ROYSTER �ov1G �Q., n li` / �T - ��' Y — T— - •/ t �,�JI 20 HOPE ROAD SOUTH YARMOUTH MA _1LL IPROJECT:04-122 SCALE: 1 "-20 ' DA TE: 817104 - OR e LY I a 0_ /7/0 ReLYIat y// aq 4W Test 0%,0! Revised,') Zla/64 Move sAS evward f -114C 1016—fall concre4if re�aih/ny �ya II as 3kown 7 A - 1 c�/ion I/8' o I/�' ELEVT�� ,00��y� �"o, �` �o.o dos ZX was ad -S YS TEM D S Z Gamer avi/ �ccDclAi// sfone Design Flow: 3/4'+a Iv 9 3 bedrooms Cagy � gal/da - 3� a 1 washd - 2 Sep 1 1 c Tank : 3� o l x 200% g a 9 — I '_.� — zx f nee. Use 1500 Gal . Tank lis G.8 --- — — .... Leaching Fac i I i t../<r-s/ r 1.-10' Bottom : Gori ELEV /7./I /� -itgn� o%T.�/�kf��s ✓% I�� f%x85 jT Sides 1El EV i0le5- ELEV. TOTAL 7.j Ad • . G.W. Gal uee 6 crushed Tank an 12 J Note: Garbage disposal is, not permitted with this design, 6o't under Septic Tank and - - D -Box 1500 Ga I. Olaf. 1000 Gallon Box Leaching Fao I l I ty L OCA TI 0N MAP Septic Tank Pump Chamber � f �. Mono 1 th IC Monolithic Assessors Map 33 SYSTEM PROFILE /� �--- --,� Parcel 2,34 r - 7-fs</��z/r�/��/� C� 6����-_� /.S Area 7, 500 SF No to scale 'i5' AUGER HOLE TEST HOLE PUMP _ 11 Submersible Pump-./f/�'ir 1. fi9/l/-Lw/✓inn�iG �,.. I_ _ — I : 6.� ,osor �/8 y -- -- ---- Coawi! Saud 2) 2' Check Valve - Cost Iron or PVC�� iiG/G — — — — — — — JrA /dyk'sef in horizontdl pass#Ion -Sf%`�9//i7/7 3) Alarm Panel%JiP /(f)M ►!/A K 6 241 Pump Chombar - 1000 Ga!Ion Tonk vl+h!/ylY �/concrete manhole.,/�4D�w/ ft�jiC o� (%�/O� Qre 51 Alarm Is fo ba an a separate olrout } ���/ �/f. ��/ Lv .fjplGf� /j Z70�� 1•- tt'' �� From .the pump.. !!'' / �/ ( 757 (9 61 Piping la to be 2•dlam. PVC far faros main — — Tom= _ G�/� �0/ice (o.Of%�(�}S-Z.J�?!C2/�_ and 4'dlam. PVC for gravity pipe. /v! .3.✓ sr 71 PumpSequanoe: InSpectiOnPOrtD t^jJ_ / fj3LS%/1�4`L 2$— a1 Pump aff E1 . 3.6 0!!/11�.T•�/.% �ODO�a�fU.bC�.a.7bY/-i/O/ - b) Pump on El -l9,0- a) Alarm on El.. �/f o�FlJfti.T"D� 7./ �K Qj4H /1- nw./ o��e 0 o �V A � 608 U{ 7t/�O1 �av1c TnH l✓f �i f�eir o ilOrlJ: %�3�o%�s {� �C1J�Cxatl�utoLfcr S,�c Z//Gz j p _ �tYtQ SCtri� Gweiaye C IV"/tZ S1 - fes/-9Lrtrc �! l✓i�hv�f .S%�= /8��f� /Zo•' Date :Z; 9 D - DATE: 0/04 2tooP/ 'PERFORMED BY: 2. v)uv WITNESS: B.MurpA�{ NOTES '` DESIGN RATE: <2 min ./in, I.) EXISTING CESSPOOLS ARE TO BE PUMPED AND f ERCOLAT I ON TEST 0 1 BACKFILLED WITH CLEAN FILL OR REMOVED. Y•2.) UNSUITABLE SOILS ARE TO BE REMOVED FOR �4Cra!lOri5 6f Wv�c of 22'�ayew) AROUND LEACHING AREA AND REPLACED P < q de fin trt ISrn;n " WITH APPROVED FILL MATERIAL. RaAeo? m/n / * � 3.) DESIGN ENGINEER TO CERTIFY SOILS REMOVAL BEFORE SYSTEM INSTALLATION. GF?oufoVdAf ER AD J, (Pafe;9/d �,uS�.BI =� 4.) DESIGN ENGINEER TO CERTIFY SYSTEM INSTALLATION Gr'ouv%dwaiet- Fi, PRIOR TO BACKFILLING. � 3 3 to, d2rclfAe 5.) DISTRIBUTION BOX IS TO BE WATER TESTED AT l� MJW� riOneCfa4-�%2} Fw. �SGn/ovi THE TIME OF THE BOARD OF HEALTH INSPECTION.' _ O FG4-,$ �B. 6.) ALL AREAS DISTURBED BY CONSTRUCTION ARE GROLNDIr{�ATER AOJ (�a4,:+d/o4_) TO BE GRADED/ LOAM COVERED AND SEEDED. 6o3 — - 7--_, 7)Corner re+iiforcemenf isto ai/eYlap Groundwo+er Found Znfer/or watt" surface i, +1 6. sealed I ndex Wel I W4b 40 mi/ Polyvinyl barrio. Zone / G/ ( Rrn 9 E sneer 1 / /_ L �G/ot 87 �_� ,oev y� 1 e 1 F f o 6c Fie�►t t7lJf _ f'O . $�.1kC Wa // Z F hA' S Cori creie< COAICKETE 4v_17 gineer to:nspa-#reinfo.'t'Pw Add . G , W . dep f h ' FIFrAINING n s Y Re l„ lI70 Clear r Q Wall lI �}cL ��.NEERI%C.IF C. ` 941 MAIN STREET, SO. HARWICH, MA 02661 432-2878 ,\� '-40>r,r P°I' "'y/ S/ TE PLAN SEVIAGE DISPOSAL SYSTEM IN YARMOUTH y4 FOR " fi ^l Yy 8„ ROBERT L ROYS TER t: < 20 HOPE ROAD V. 20 SOUTH YARMOUTH MA PROJECT: 04-122 SCALE: 1 '-20 , �, ,Add Test ole v/ (. i!evJsed� I 04 Move SAS e'fbward f rr / � � the dwe/lin Ind7`u71 ConGrC7Q /'e w5st', �� jj:a`,, •1 ,G.'dd Pmj �✓ n�t� �a 11 as sftous t7 1nJv�t/i e -?I / o o /D:3/LC ID.OS ' o ELEV�s was ed . ����Gyl%S/aD.i// ZX stone Z D 3/4•+a I/ esign Flow: bedrooms Cagy //O gal/day - 3_ gal Washed 2 Sept Ic Tank: 3 " gal. x 200/ gal . zxs nf!— Use I500,Gal. Tank _ 7: — = Leach i n Fac i I i t"' g Y � �! � � G �/J.1�,F/t�fo'�- LEY Low Bottom: X 45 X d S" Sides: 2 _'f_�fss'xas�%vx�7f/'r,�=}/ �F1 FLS s TOTAL Ga I . P,dj. G.W. Note: Garbage disposal is not permitted with this design. ELEV5 use b cruslh ene 12. tinder D -Box Septic Tank and 1�,Z,7Xg,�i<�gr%� DIe+. 741"l - 1500 o/ ' 500 Ga I 1000 Go l Ion Box Leaching Fooi I 1 ty Septic Tank Pump Chamber Monolithic Monolithic SYSTEM PROF I LE No+ to goal® I - 13 AUGER HOLE l� L OCA T Qlkl [V, F Assessors hlap 33 Parcel 232 Area 71500 65F TEST I-0LE 1 oafv4St�rnd _/fy /1 ,� jA t1Cr6"E E. 7. YK n 2v— IE I DATE: a/ `��r_ FCRr ORMED BY: r Ovc J W I T E r F. t��\ Cis f_`.>Jr �.,R1,. 4ii".-!a {A - i TES D:S1G�..�i FAT 1-- f!2' rr.In /in I .) EXISTING CESSPOOLS ARE TO BE PUMPED AND 11 BACKFILLED WITH CLEAN FILL OR REMOVED. �r•C(tl1Gn5 c�(:�vUafE 1 E,,', `�t`F'f rr i 0.00+ •{ jCt' :.. ,i / 2,) UNSUITABLE SOILS ARE TO BE REMOVED FOR `' 0 0 1 3eiicLi/L � d E i `' 1 r, I v r%i +� l �r r P 5• AROUND LEACHING AREA AND REPLACED ` /�/�las �al< /oma /Yu/�-✓L /,p/ar�i �7t S C o< eirira�2. AF^.< s 0'00' 7p ITH APPROVED FILL MATERIAL. �ro�ofcd 3.) DESIGN ENGINEER TO CERTIFY SOILS REMOVAL s t* I l ovtG BEFORE SYSTEM INSTALLATION. Gi�i�J�.�•�3-tJ�°,I.* iE7F -4)J. �II ;,rl-'o<•' ii 33-x �tsfi��vvsG - _ Q �.. 4.) DESIGN ENGINEER TO CERTIFY SYSTEM INSTALLATION GrcRtct+?pa's t 6-' S 36.. � l00 PRIOR TO BACKFILLING. 1 • 2 2 - no ,< � 00 5.) DISTRIBUTION BOX IS TO BE WATER TESTED ATy.. THE TIME OF THE BOARD OF HEALTH INSPECTION.'WATER I I O f_/G. S -S C n loci ''-y ,+-"' t `'{1^' e—^ r' �e r4; ,., S .) ALL AREAS D I STUBBED BY CONSTRUCTION ARE I l € D 4, A 1 33-- s +� �' z�3 ��s TO BE GRADED, LOAM COVERED AND SEEDED. C' M i �, g S G r o u n d w a i e r i , t.1 n /iv Index WWI I /'4:/� 1 u • x � O �r�i ' r — �--_ � t 63 �g i0 n o -- / 67 ; i �e`� pos � ewe � r4 �X,J,.n k' Adj. G.W. aE:p } n �� 1 92 • CI O.a ^ O ;'rr , 1 I <�� � �, !ti �o6c �'2.-noucd f 14 xK E4"aTr !t i kE".' Ya•�<Rt 1 12- 941 2941 MAIN STREET SO. HARV I CH MA O?F£ 1 q q 8r/ 7t, 1 6q8 o � 32-2 S 7 68+ I I J { S/TE FL/" -N A SEIVAGE DISPOS/L SYSTE11 IA YXi?1'11*�.�'U Th" �(J (V 2.61 4�%i3OVG 4 40;�r�s _5., t�r j.,� 88+ �.. FOR �xs� �y CO. l 0 Op` i �'I n�rjY ' / / I f-...�' � /' `�` ROBERT L. R YS TER , 18•29�, ~LSC' rC f�c „%,: %''` = /'.ter t ✓r r ,�Q1�1! 20 HOPE TOAD ' '�'i1 r°:Qf�� 1 7 4 = n ll fnr PROJECT: Qfr 2.2 SCALE • 1r " -20 DA T • 4 @ l* C V F /d PUMP IP I � / — — — — — — — — — — — — I ) Submere 161 a Pump -/f%/rl f��`%/jv/oihs�JiG �I�G_.fi�,PfO� . •8�B �G»�••iii9 — — — — — - 2) 2' Check Valve - Cost iron or PVCGa� ae} In horizontal poat}lon � -- 3) Alarm Panel 4) Pump Chamber - 1 000 Gallon Tank with concrete manhole. snoLr��r'G CCintG?ri�'�rlG G.�.RI/J.r1C!_ - 51 Alarm I#o on a separate circuit from h®.pumump t 61 . Piping 1s to be 2•dlam. PVC For Foros main - and 4'dlom. PVC For grovlty pipe. Inspection r� Port D�.i� alL 71 Pump Ssquance: o!% /h. Tn/s al Pump off E1.3.6 �' /1 % b) Pump on EL.�/yofi/i<.ti. o) Alarm on E1.1f! /%Ci__e!7/ 7./ l� L OCA T Qlkl [V, F Assessors hlap 33 Parcel 232 Area 71500 65F TEST I-0LE 1 oafv4St�rnd _/fy /1 ,� jA t1Cr6"E E. 7. YK n 2v— IE I DATE: a/ `��r_ FCRr ORMED BY: r Ovc J W I T E r F. t��\ Cis f_`.>Jr �.,R1,. 4ii".-!a {A - i TES D:S1G�..�i FAT 1-- f!2' rr.In /in I .) EXISTING CESSPOOLS ARE TO BE PUMPED AND 11 BACKFILLED WITH CLEAN FILL OR REMOVED. �r•C(tl1Gn5 c�(:�vUafE 1 E,,', `�t`F'f rr i 0.00+ •{ jCt' :.. ,i / 2,) UNSUITABLE SOILS ARE TO BE REMOVED FOR `' 0 0 1 3eiicLi/L � d E i `' 1 r, I v r%i +� l �r r P 5• AROUND LEACHING AREA AND REPLACED ` /�/�las �al< /oma /Yu/�-✓L /,p/ar�i �7t S C o< eirira�2. AF^.< s 0'00' 7p ITH APPROVED FILL MATERIAL. �ro�ofcd 3.) DESIGN ENGINEER TO CERTIFY SOILS REMOVAL s t* I l ovtG BEFORE SYSTEM INSTALLATION. Gi�i�J�.�•�3-tJ�°,I.* iE7F -4)J. �II ;,rl-'o<•' ii 33-x �tsfi��vvsG - _ Q �.. 4.) DESIGN ENGINEER TO CERTIFY SYSTEM INSTALLATION GrcRtct+?pa's t 6-' S 36.. � l00 PRIOR TO BACKFILLING. 1 • 2 2 - no ,< � 00 5.) DISTRIBUTION BOX IS TO BE WATER TESTED ATy.. THE TIME OF THE BOARD OF HEALTH INSPECTION.'WATER I I O f_/G. S -S C n loci ''-y ,+-"' t `'{1^' e—^ r' �e r4; ,., S .) ALL AREAS D I STUBBED BY CONSTRUCTION ARE I l € D 4, A 1 33-- s +� �' z�3 ��s TO BE GRADED, LOAM COVERED AND SEEDED. C' M i �, g S G r o u n d w a i e r i , t.1 n /iv Index WWI I /'4:/� 1 u • x � O �r�i ' r — �--_ � t 63 �g i0 n o -- / 67 ; i �e`� pos � ewe � r4 �X,J,.n k' Adj. G.W. aE:p } n �� 1 92 • CI O.a ^ O ;'rr , 1 I <�� � �, !ti �o6c �'2.-noucd f 14 xK E4"aTr !t i kE".' Ya•�<Rt 1 12- 941 2941 MAIN STREET SO. HARV I CH MA O?F£ 1 q q 8r/ 7t, 1 6q8 o � 32-2 S 7 68+ I I J { S/TE FL/" -N A SEIVAGE DISPOS/L SYSTE11 IA YXi?1'11*�.�'U Th" �(J (V 2.61 4�%i3OVG 4 40;�r�s _5., t�r j.,� 88+ �.. FOR �xs� �y CO. l 0 Op` i �'I n�rjY ' / / I f-...�' � /' `�` ROBERT L. R YS TER , 18•29�, ~LSC' rC f�c „%,: %''` = /'.ter t ✓r r ,�Q1�1! 20 HOPE TOAD ' '�'i1 r°:Qf�� 1 7 4 = n ll fnr PROJECT: Qfr 2.2 SCALE • 1r " -20 DA T • 4 @ l* C V F /d