Loading...
HomeMy WebLinkAbout23 Iroquois Blvd - Septic SystemFIRST 2' TO 9• MINIMUM COVER MIN. z' OF INVERT ELEVATIONS: DES I GN CR 1 TER IA.. BE LEVEL INVERT AT BUILDING: ACCESS COVERS MUST BE WITHIN TEE PEASTONE 4 VENT DESIGN FLOW: 103.33 6' OF FINISH GRADEINVERT IN SEPTIC TANK: 3 BEDROOMS AT I10 G. P. D. PER 7 102.9 2x 18' MIN 0 INVERT OUT SEPTIC TANK: BEDROOM EQUALS 330 G.P.D. 102.1 INVERT IN PUMP CHAMBER: 101 7' /o ` s' s I INVERT OUT PUMP CHAMBER: NO GARBAGE GRINDER o/AM PIPE 2' SCH 40 PVC 10L8 \ 40 MIL PVC I INVERT IN DIST. BOX: VAPOR BARRIER 5 STANDARD INFILTRATOR SEPTIC TANK REQUIRED: 6 5 i 8 5- . IX/ST/NO GRADE INVERT OUT DIST. BOX: SAS CHAMBERS W/4's STONE AROUND 100 1 330 G. P. D, X 200x - 660 GAL. 96 75 BAFFLE 98_4 � i 3 OUTLET INVERT /N LEACH CHAMBER: D-BOX 10'r X 39'1 X 7'dSEPTIC TANK PROVIDED: 1500 GAL. MIN. 3/4' - l 1/2' DIA. BOTTOM LEACH CHAMBER: 1500 GAL N-20 H-20 PUMP CHAMBER WASHED STONE ADJUSTED GROUND WATER: .$OIL ABSORPTION SYSTEM REQUIRED: SEPTIC TANKWATERTIGHT AND OBSERVED GROUNDWATER: DESIGN PERC RATE ( 5 MIN/INCH WATERTIGHT AND FACTORY WATERPROOFED BOTTOM OF TEST HOLE #/: SOIL TEXTURAL CLASS - I FACTORY WATERPROOFED INDEX WELL M/W 29. ZONE A EFFLUENT LOADING RATE - 0.74 GPD/SF 6' CRUSHED STONE BASE MAY 99 READING-6.3'. ADJ-1.7' 330 GPD / 0.74 GPD/SF - 446 S.F. REQUIRED ROUTE 28 PROVIDED: 5 STANDARD INFILTRATOR LOCUS PROFILE: Nor TO SCALE CHAMBERS W/4's STONE AROUND. A-447 S.F. A 447 S.F. x 0.74 - 331 GPD SOIL TEST PIT DATA&. 5° p BOUYANCY CALCULATIONS: N INDICATES _y INDICATES PERCOLATION = OBSERVED SEPTIC TANK: DISPLACEMENT - 197.1-94.01 x 11 x 6.18 - 211 C.F. TEST = GROUNDWATER 211 C.F. x 62.4 #/C.F. - 13150#. TANK - 21230# OX TP #1 PUMP CHAMBER: DISPLACEMENT - (97.1-93.65) x 9 x 5.25 163 C.F. O rHORIZON TEXTURE COLOR � 163 C.F. x 62.4 #/C.F. - 10171#. TANK - 14500# OK P� 0' 100.1 LOAMY 10 YR Q SAND 3/2 LOCUS MAP "' D 99.2 GENERAL NOTES: 100.E U SANDY 4/6R 0 /8- ... E ...................... ........ 98.6 1. THIS PLAN 15 FOR THE DESIGN AND CONSTRUCTION 9 39 �� n� C f MED-COARSE 7.5YR 5 o- SAND 5/8 OF THE SEWAGE DISPOSAL SYSTEM ONLY. LOT/ $ ? o O ! 42' �-- ' 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS SOIL REMOVAL ��� 13093 + S.F. `A' o, SET. SEE S I TE PLAN. 4EN� 1 .6 SEE NOTE P. ��� 44' °E VENT...................................... 96.4 yt 3. ALL CONSTRUCTION METHODS AND MATERIALS AND BM CORNER COA'C PAD \ �' C2 MED I UM I OYRSAND 5/6 ' MAINTENANCE OF THE SEPTIC SYSTEM SHALL / O 1h ELEV-IOL J9 - `°� v 56'_�V_95.4 CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL loo B 5 �\ 01, BOARD OF HEALTH REGULATIONS. 40 Mu PVC �\ y�� 100.40 84' NO WATER VAPOR BARRIER 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER DATE: +N° J 5 \ o DATE: MAY 18. 1999 AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3' IN DEPTH SHALL 8E CAPABLE OF WITH-loos N ;� loom 0551%pe p�tt°N 1� h TET BY: DSTEPHEN HAAS LOTTE STIEFEL STANDING H-20 WHEEL LOADS. a I 1 PERC RATE: ( 2 MIN/INCH 1 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 OR� t \ ) ^ o APPROVED EQUAL. CESSPOOL t +per H I 6. SEPTIC TANK. PUMP CHAMBER AND D-BOX SHALL BE �i 1 o� xo!'2 I CATCH BASIN i-soxb -� ® R/w•9e.es REINFORCED PRECAST CONCRETE. WATERTIGHT AND ° ' WATER➢ROOF: -F S \a �� ( VARIANCES REQUIRED: MAXIMUM FEASIBLE COMPLIANCE. TITLE 5: uDo SAL � I --- ?__� , rn, c (�� `�• `. ®i - 15.212:(6) DEPTH To GROUNDWATER. 5' IS REQUIRED BETWEEN BOTTOM OF THE ` 7. BEFORE CONSTRUCTION CALL 'DIG-SAFE'. c 14' OAK SEPTIC TAMN + SAS AND HIGH GROUNDWATER. 4' IS PROVIDED. 1-888-DIG-SAFE AND THE LOCAL WATER DEPT. \\ PWP CUMBER +100.2 • �` SHELLS FOR LOCATION OF UNDERGROUND UTILITIES. �� t►#1 �� 8. EXISTING CESSPOOL TO BE PUMPED DRY AND h\ BACKFILLED.439.20 G S E/D T / C S YS TEM DES �\ 59 / 9. ALL UNSUITABLE MATERIAL (A 6 8 HORIZONS) R9•e <\ ��'� 5 ENCOUNTERED BELOW THE INVERT OF THE LEACHING S 2 3 R O Li UO I S B L VD / . FACILITY TO BE REMOVED FOR A DISTANCE OF 5' p ! ,' ytogb AROUND AND REPLACED WITH SAND IN ACCORDANCE 04T S T YA R MO U TH , MA • g WITH TITLE 5. � ' -- r l0. THE ENTIRE LOT FALLS WITHIN FLOOD ZONE B. .JOIV TOLLE-Y N y� PUMP SYSTEM NOTES: 4 PVC /m£T YALYE Pvc OUTLET CATCH BASIN ti !!tea � i 5CALE-: / 20 .JUL Y 6. /999L v I. PWP TO BE MYERS RESIDENTIAL SEWAGE PWP MODEL JRM4 A*WMY FLOAT YELP is < _ OR EOUAL. eRTG $ IKKE t a i \ 1�i`. - 020 GRA r �,. E A G L E SUFRVEY i NO I NC - ALARM ON _.i YACYE 'Hf t }{ F "iRG _ 2. THE PWP SHALL START AND STOP AT THE ELEVATIONS SHOWN. PU# rLMr OFF 923 Route 6A J. THE PWP SHALL BE INSTALLED 1N STRICT CONFORMANCE WI7H - PW - -*t> a<j� *�"�� ���� � � � Ya r mo u t h p o r t MA . 02675 > THE MANUFACTURER'S SPECIFICATIONS AND TITLE V REXXATIONS, PL&P DISCHAROE SHALL BE 2 INCHES. PWP SHOULD Of ABLE TO BE C 5 0 8 �, 362-8 'I 3 2- DISCONNECTED AND LIFTED OUT OF THE PWP CHAMBER WITHOUT - • /i,i/ 508 .432-5333 HAVING 70 ENTER THE PLMP CHAMBER. - PUMP DETA IL :NOT TO SCALE 4. THE ALARM SHALL START AT. THE ELEVATION SHOWN AND BE - USING 1000 GAL. PUMP CHAMBER POWERED BY A CIRCUIT SEPARATE FROM THE PWP POWER. IATERTlOH1T AND WATERPROOF - - 0 10 20 40- JOB NO: 99-028 FIELD:CFW/EEK 'CALC:'SAHICFW CHECK:;CFW DRN: SAH