Loading...
HomeMy WebLinkAbout661 Higgins Crowell Road Site Plan of Land 2PUMP SYSTEM NOTES: 1. PUMPS TO OF MYERS RESIDEPT/AL SEWAGE PUMP uR7E1 SRM4 4• PYC INLET OR EO'JAL. 2. THE PUMPS SHALL ALTERNATE AND START AND STOP AT THE ELEVATIONS SHOWN. THE LAG PUMP SHdL START WHEN THE ALARM STARTS. J. THE PUMPS SHALL BE INSTILLED IN STRICT CONFORMANCE WITH THE MANUFACTUPER"S SPECFICATIONS AND TITLE V RFGULATIOH5. PUMP DISCHAPGE SHALL BE2INCHES. PUMP SHOULD BE ABLE TO BE DISCONNECTED AND LIFTED OUT OF THE PUMP CHAMBER WITHWJT HAVING TO ENTER THE PW CHAMBER. - 4. THE ALAPM SHALL START AT THE ELEVATION SHORN AND BE I POWEPED BY A CIRCUIT SLPARAT£ FROM THE PUMP POWER. S. AN ELECTRICAL PERMIT A/5T BE OBTAINED FOR THIS INSTALLATION. 8• MIN. H2O CAST CLAY BRICK LEVELINS COURSE /ROLA FRAME AND COVER MORTARED IN PLACE WITH l' VENT 4- MIN, PEASTONE TO FINISH GRADE 8' H2O CAST IRON 4 MIL POLY FRAME AND GRATE CLAY BRICK LEVELING COURSE MORTARED IN PLACE I "DIA VENT CLEANOUT 12• HDPE PIPE TEE TO LEACHfNG 11 -20 SOLID ;.� CATCH BASIN -20 CONIC SLAB If 6' DIAM --+� W112 DIA LEACH HOLE CATCH BASIN DETA IL NO SCALE I/A*IF T-� x°,p��T12- EL TO OTHER FROM BASIN N HDPE LEACHING PITS MORTAR ALL JOINTS LEACHINO' MINIMUM DISTANCE 314'-1112- WASHED BASINETWEEN LEACH PITS STONE ALL AROUND IH -201 I Ni 6' DIAM. - MIN. SEE PLAN FOR ACTUAL WIDTH LEACHING BASIN DETA IL NO SCALE I 1 / PROP" i ` { L?GHT 17 �. A2' 1 PROP'a wnLA LIgIIT PAYED SIDE U •` ! 1\ 4l a /tt 1 \ rP.4 1 T, FEET vC______ ,,�� T4 / /R ��7 / GUTLE_ ' , O � / al XV2 7 L L EACH FIELD 5'' 0 1 � p > I , p � N ' VEN7 SOIL PEMOYAL�- SFE NOTE 13. RESERVE 9• �C Jp c ,1 cl-111.7 PAVEMENT DETAIL NO SCALE TYPE 1-1 BITUVINOJS CCYCFETE 2' BINDER COURSE. 1' TCF COURSE 8.5' DENSE GPADED CRUSPED STONE CP 12- GRAVEL BASE L EGEND COUPL NS IWEEP OR WA TEP GATE —W— WATER LINE Co HYDRANT MERCURY FLOAT HOLE GAS G= TE —G— GAS LINE SWITCHES CN£C'R CATCH BASIN •— 0- UTILITY POLE W/ GUY WIRE ALARM ON ,.,.. RLL YE OVER HEA; WIRES —T — U'+'OEFG°DUVO TELEPHONE L I NE PfAIP ONI... PCVP S £XIST;NG SPOT ELEVATION EXISTING CONTOUR RPCROSED SPOT ELEVATION �-^ FLIN:n-F DIRECTION PLVP OFF HAVING TO ENTER THE PW CHAMBER. - 4. THE ALAPM SHALL START AT THE ELEVATION SHORN AND BE I POWEPED BY A CIRCUIT SLPARAT£ FROM THE PUMP POWER. S. AN ELECTRICAL PERMIT A/5T BE OBTAINED FOR THIS INSTALLATION. 8• MIN. H2O CAST CLAY BRICK LEVELINS COURSE /ROLA FRAME AND COVER MORTARED IN PLACE WITH l' VENT 4- MIN, PEASTONE TO FINISH GRADE 8' H2O CAST IRON 4 MIL POLY FRAME AND GRATE CLAY BRICK LEVELING COURSE MORTARED IN PLACE I "DIA VENT CLEANOUT 12• HDPE PIPE TEE TO LEACHfNG 11 -20 SOLID ;.� CATCH BASIN -20 CONIC SLAB If 6' DIAM --+� W112 DIA LEACH HOLE CATCH BASIN DETA IL NO SCALE I/A*IF T-� x°,p��T12- EL TO OTHER FROM BASIN N HDPE LEACHING PITS MORTAR ALL JOINTS LEACHINO' MINIMUM DISTANCE 314'-1112- WASHED BASINETWEEN LEACH PITS STONE ALL AROUND IH -201 I Ni 6' DIAM. - MIN. SEE PLAN FOR ACTUAL WIDTH LEACHING BASIN DETA IL NO SCALE I 1 / PROP" i ` { L?GHT 17 �. A2' 1 PROP'a wnLA LIgIIT PAYED SIDE U •` ! 1\ 4l a /tt 1 \ rP.4 1 T, FEET vC______ ,,�� T4 / /R ��7 / GUTLE_ ' , O � / al XV2 7 L L EACH FIELD 5'' 0 1 � p > I , p � N ' VEN7 SOIL PEMOYAL�- SFE NOTE 13. RESERVE 9• �C Jp c ,1 cl-111.7 PAVEMENT DETAIL NO SCALE TYPE 1-1 BITUVINOJS CCYCFETE 2' BINDER COURSE. 1' TCF COURSE 8.5' DENSE GPADED CRUSPED STONE CP 12- GRAVEL BASE /.0/: 1b 0' -` 15 -30 X60 23.7 108-1 I .22..6 DATE: MAY 21. 2002 TEST BY: STEPHEN HAAS WITNESSED BY: LYNN MULKEEN i S / TE PL A/\/ OF L A /VD LOT 18 A/VSEL HAL L E7 -T ROAD. MAP 73 • PARCEL 6 PREPARED FOR: WILLOW STREE T RE -.TR SCALE-: / •' - 30 ' MARCH 26 , 200-4 EAGLE SURVEYING, INC 923 Route 6A Yarmouthport, MA. 02675 ��%illi 4 ( 508) 362-8132 (508) 432-5333 L EGEND COVCPETE BOUND FOUND OR WA TEP GATE —W— WATER LINE Co HYDRANT O GAS G= TE —G— GAS LINE 9 CATCH BASIN •— 0- UTILITY POLE W/ GUY WIRE ----C-1W OVER HEA; WIRES —T — U'+'OEFG°DUVO TELEPHONE L I NE �"= 4 £XIST;NG SPOT ELEVATION EXISTING CONTOUR RPCROSED SPOT ELEVATION �-^ FLIN:n-F DIRECTION /.0/: 1b 0' -` 15 -30 X60 23.7 108-1 I .22..6 DATE: MAY 21. 2002 TEST BY: STEPHEN HAAS WITNESSED BY: LYNN MULKEEN i S / TE PL A/\/ OF L A /VD LOT 18 A/VSEL HAL L E7 -T ROAD. MAP 73 • PARCEL 6 PREPARED FOR: WILLOW STREE T RE -.TR SCALE-: / •' - 30 ' MARCH 26 , 200-4 EAGLE SURVEYING, INC 923 Route 6A Yarmouthport, MA. 02675 ��%illi 4 ( 508) 362-8132 (508) 432-5333