�•Dimetsions oyd DnWnM The drawings are intended only to serve as the basis for o'
describing the scope of the prosect and how the completed project will be used. The Cf) II n
�:ontroctor will be responsible for choosing certain materials and methods to complete L J co
4.he work, subject to the approval of the Owner (See Note #2 below). Ym* all dimensions C
LU Co.
icated on drawings with field dimensions before fabrication or ordering materials. Q � m 0
— .- 0
to c
Re DO 1ilta� dna+s Dimansians shown are from face of framing. centerline of post, or
4ace of concrete unless otherwise noted. 0
_ U) Q
- � z
2. F.aimUng ConAMMO: Kcrify all _eldsting canditu±. . Notify owner of existing conditions t ® Ur
differing from those Indicated on the drawings. Do not remove or after structural € _Z
_. components without prior approval. Q O Z
! S. COAM Comply with applicable codes and regulations of authorities having jurisdiction. 6 u
Submit copies of inspection reports, notices, and similar communications to Owner and CD 0 •
Designer. W c ty u,
— c Z
33 Q
. 4. Pmm apply for, obtaln, and pay for permits, it aquirind, to perform the work. O m -�
Submit copies to Owners LyLU
v. agidw Remove all construction debris off site or store In euit We container until w
..............- .... a hof each work Insure
. � removal. Clean and sweep all constrvcaon areas at the finis day. p ° CO
' ( that
i:• windbown debriv
=Zssremoveromat properues. —J :,: 73 f—
0
6. $s} The Contractor shall be responsible for safety on the job site, and will take h c
am10
required action to insure that the site and work is reasonably secure during times when 0
W.
the Contractor is absent. All safety regulations are to be strictly followed. Methods of
�'
........................ • construction and erection of structural materials is the Contractor's responsibility.
I
:..' !
• '• 7.InT�nLDrawings
and specifications are intended to provide 'de the basis for proper
tom etion of
the wn s
rk unable for the intended use of the owner. Anything not
p1 m/th ng
jexpmosly set forth but which is msonaby implied or necessary for the grope- ' }l
performance of the project Sha be armed, -�
I A•
4
i
'� • • •........._.�. .
!'• : Eat' . - O
treasonable care has been taken in the preparation of all drawings and specifications. V
However, the Designer does not guarantee against human error and for that reason it is
�•'
. :. fmperative that the Contractor shall check all dimensions and details and mustvaify all
f, conditions,
dimensions and details, and must
all
conditions and dimensions at the
}1
f •'� •' ilding. All discrepancies shall be brought to the attention of the Designer before
..o
mceeding. x
P
,i•
.i.
.::..... :;:. .. .........
I
le
' I i :• .00
I _ C11Jk p�
.3
ns
Ux
n[2@F;JMIJC
RPR 2 3 2012
HEALTH DEPT.
Gr uu
'Floor- Exi� ing_Co iii®n� .114s�