Loading...
HomeMy WebLinkAbout29 Kathy Ann Road Site and Sewage PlanLOCUS �� ASSESSORSKAP: ao TEST HOLE LOGS NOTES: PARCEL 56 ,�•�. �ol� I. VERTICAL DATUM: ASSUMED FROM QUAD (HCVD +/-) CURRENT ZONING: R- 0 (1960 SUBDIVISION) ENGINEER: THOMAS .UcLELLAN, P.E. 2. MUNICAPAL WATER IS AVAILABLE. WITNESS: AkfY VON HONE, P..S. BUILDING SETBAC 'S': l 3. SCHEDULE 40 - 4° PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. F: 30' S{ 6` R: 20' N DATE: 9-13-01 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 N PERCOLATION RATE: < 2 MIN/IPJ LOADING SPECIFICATIONS. FLOOD ZONE: C 5. PIPE PITCH = 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). TH-1 274 29A TH-2 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. r` ELEV. ELEV, 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE c*'�o o/A/E HORIZON 0/A�E HORIZON USE OF A GARBAGE DISPOSAL. �. LOA SAND LOA",! ' SAND 12" fOYR 3/3 26.0 12" 10YR 3/3 28.0 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE B HORIZON B HORIZON STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL LOCATION MAP 3s. LOAMY SAND LOAMY R Y S SA ND HEALTH REGULATIONS. LOT AREA I 24A 3s' 2s.o 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR C tloRlzoN c xoxrzoN 20,277 ± S.F. FINE SAND FINE SAND TO CONSTRUCTION. (0.47 ± AC.) 2.5Y 7/4 2.5Y 7/4 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0'. 1f. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. 144" t.SA f5o" 16.5 NO GRCUND WATER ENCOUNTERED %SHED 254 26 27 28 29 O D""E� R'C ♦ ` \ ♦ ♦ 232. 00' 32 23` ♦ ♦ \ ♦ \ . ♦ - - . ♦ 32 m r ♦ � ♦ � {- � : ♦ I'ROp ♦ IAN Nc Y ♦ ♦ � � ` ` � � � end: gps ♦ mom\ \ `♦ `\ � ♦ `♦ '�: � ` ♦ ♦ � . -.:;....:_.•.-...x..:31- I \ 22 / 23 24 25 26 l 170 00, 185' 27 ` FENCE ,{ 28 ` Y 29 30 29.7 DfiE� NC BENCHMARK AT PK NAIL ELEVATION s 30.0 KEY: EXISTING CONTOUR: - - - - PROPOSED CONTOUR: EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 0UTILTEST HOLE: -0- UTILITY ITY POLE: -0- FENCE LINE: - - HYDRANT: ••b - RETAINING WALL. TREE: DM # 01_56 (, 32.5 Q TOP OF FOUNDATION 28.0 f500 GAL ELEV. SEPTIC TANK Z29.6 (6" OF STONE UNDER OR ELEV. MECHANICALLY COMPACTED) DEMARxST-MGLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 WEST DENNIS, MASSACHUSETTS 02670 PHONE t. FAX : (508) 398-7710 TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN COVERS WITHIN 12' OF FINISHED GRADE ONE INSPECTION COVER 0 BE WITHIN 6" OF GRADE) 27.75 t ELEV. 16' f0 DECK 0' PROPOSED 24 3 BEDROOM 26' DWELLING CAR. 2, 14' 16 fOs 19.5' PROPOSED DWELLING 2" PEASTONE 314--1 112- 3' MAX. WASHED STONE COVER ELEV: 26.0 D -BOX 27.5 27.67 (6" OF ELEV. ELEV. STONE UNDER) 25.17 GAS BAFFLE AT OUTLET TEE ELEV vi e F. I A 23.17 3 H ELEV. < 28' 2- 500 GALLON CHAMBERS WITH 3' OF STONE ALL AROUND AND 5' BETWEEN (28'x 10.8'x 2' DEEP) SITE AND SEWAGE PLAN APPIOVED BY: DATE: LOCATION.• i 29 KATHY ANN ROAD �`,�' `♦w 4�, SOUTH YARMOUTH MA Z f, � . S ,o �1f PREPARED FOR � D A EoT, v. rti No 3G853 J PATRIOT BUILDERS 'n^°2 4f. f68i o -h gl Yf%4s,, SCALE: 1" = 30' DATE: 101021 REFERENCE: PLAN BOOK 165 PAGE 5 THOMAS Mc tLLAN, P.E. JOHN Z. DEMAREST JR., P.L.S. SEPTIC SYSTEM DESIGN FLOP' ESTIMATE: 3 BEDROOMS AT 110 GAL/DAY/BEDROOM =33, GAL/DAY SEPTIC TANK: 33-0 GAL/DAY x 2 DAYS = 660 CAL USE 1500 GALLON SEPTIC TANK [� �(~ LEACHING AREA: Q USE 2- 500 GALLON CHAMBERS WITH T OF STONE ALL AROUND AND 5' BET: EEA: (28' x 10.8' x 2' DEEP) SIDE AREA.- (28 + 10.8)2 x 2 = 155 (.74) = 115 GAL/DAY BOTTOM AREA: 28' x 10.8' = 302 SF (.74) = 223 CAL/DAY CAPACITY = 338 GAL/DAY SEPTIC SYSTEM SECTION (, 32.5 Q TOP OF FOUNDATION 28.0 f500 GAL ELEV. SEPTIC TANK Z29.6 (6" OF STONE UNDER OR ELEV. MECHANICALLY COMPACTED) DEMARxST-MGLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 WEST DENNIS, MASSACHUSETTS 02670 PHONE t. FAX : (508) 398-7710 TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN COVERS WITHIN 12' OF FINISHED GRADE ONE INSPECTION COVER 0 BE WITHIN 6" OF GRADE) 27.75 t ELEV. 16' f0 DECK 0' PROPOSED 24 3 BEDROOM 26' DWELLING CAR. 2, 14' 16 fOs 19.5' PROPOSED DWELLING 2" PEASTONE 314--1 112- 3' MAX. WASHED STONE COVER ELEV: 26.0 D -BOX 27.5 27.67 (6" OF ELEV. ELEV. STONE UNDER) 25.17 GAS BAFFLE AT OUTLET TEE ELEV vi e F. I A 23.17 3 H ELEV. < 28' 2- 500 GALLON CHAMBERS WITH 3' OF STONE ALL AROUND AND 5' BETWEEN (28'x 10.8'x 2' DEEP) SITE AND SEWAGE PLAN APPIOVED BY: DATE: LOCATION.• i 29 KATHY ANN ROAD �`,�' `♦w 4�, SOUTH YARMOUTH MA Z f, � . S ,o �1f PREPARED FOR � D A EoT, v. rti No 3G853 J PATRIOT BUILDERS 'n^°2 4f. f68i o -h gl Yf%4s,, SCALE: 1" = 30' DATE: 101021 REFERENCE: PLAN BOOK 165 PAGE 5 THOMAS Mc tLLAN, P.E. JOHN Z. DEMAREST JR., P.L.S.