Loading...
HomeMy WebLinkAbout32 Kathy Ann Road Sewage Disposal System DesignSOIL TEST PIT DATA: TEST PIT #1- TEST PIT - #2 GRD. EL. 102.6 GRD. EL. 102.5' EST. HIGH GW. 93.0' EST. HIGH GW. 93.0 MEDIUM SAND 2.5Y6/3 NO OBS. GW. EL = 91.1 1 4" 3" 38" EL = 100.5 MEDIUM 1SAND 10YR6 6 MEDIUM SAND 2.5Y6/3 NO OBS. GW. EL = 91.5' JULY 18, 2001 SEPTIC TANK DETAIL: 1,500 GALLON NOT TO SCALE NOTES: 1. SEPTIC TANK SHALL BE STEEL 5. INLET AND OUTLET TEES TO BE CAST IRON, REINFORCED CONCRETE. SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE. 2. SEPTIC TANK TO WITHSTAND H-10 LOADING TEES TO BE CENTERED UNDER MANHOLE COVER. UNLESS UNDER PAVEMENT, DRIVES OR TRAVELED WAYS, WHEREIN H-20 LOADING SHALL APPLY. 3. ALL PIPE CONNECTIONS AND CONCRETE 6" HIGH GROUNDWATER COMPUTATION 2-24" DIA CONCRETE MANHOLES BASED ON TP#1 CONSTRUCTION SHALL BE WATERTIGHT. W/ METAL HANDLES BROUGHT 4. FELL ALL UNUSED KNOCKOUTS WITH TO 6" OF FINISH GRADE DEPTH TO BOTTOM OF HOLE 11.5' MORTAR. 24" TEE TO BE UNDER 12' MIN. INDEX WELL MIW-29 M.H. OPENING OVER 3' WATER LEVEL RANGE ZONE B !w 'x ! �/ 4' CURRENT DEPTHOINDEX WELL(7/01) 7.6 RAISE M.H W/► WATER LEVEL ADJUSTMENT 1.9 � 10'-6" � SEWER BRICK ::� ._• 36" DEPTH TO ADJUSTED HIGH WATER 9.6 10'-0' &MORTAR NORMAL WATER LEVEL 12' 132" DATE: DATE: 7/18/01 7/18/01 TEST BY: TEST BY: THE BSC GROUP, INC. THE BSC GROUP, INC. WITNESSED BY. WITNESSED BY: AMY VON HONE AMY VON HONE PERC. RATE: PERC. RATE: <_MIN./INCH N/A MIN./INCH SOIL EVALUATOR SOIL EVALUATOR CRAIG FIELD CRAIG FIELD SOIL CLASS: SOIL CLASS: 1 N /A L.T.A.R. L.T.A.R. 0.74 G.P.D./SQ.FT. 0,74 G.P.D./SQ.FT. DATUM: UNLESS UNDER PAVEMENT, DRIVES OR TRAVELED WAYS WHEREIN H-20 LOADING VERTICAL DATUM: ASSUMED BENCH MARK SET: NAIL SET IN UTILITY POLE 101.92' PROFILE: NOT TO SCALE INDICATES v_ OBSERVED GROUND WATER INDICATES ESTIMATED SEASONAL HIGH GROUND WATER sm D D04 INDICATES 09 Dog PERC. TEST INDICATES UNSUITABLE MATERIAL EL.= A FIRST PIPE LENGTH TOP FOUNDATION CONCRETE COVERS TO WITHIN TO BE SET LEVEL EL.= 103.1'_ 6' OF FINISHED GRADE. FOR MIN. 2' e FINISH GRADE EL=1 .2'-1 :;. 4" PVC SCH 40 (PERF a" Pvd e- SCH 40 4' PVC SCH 4 � 2'-1 8'-3 8' DOUBLE WASHED STONI /4"-1 1/2" DOUBLE WASHED STONE II -B 1=D -x. ISE I=G ? I=H e I -C 5 OUTLET 1=F >� <.i r -e-. DIST. BOX c SEPTIC TANK .1 BOTTOM EL= J In HIGH WATER EL- K INVERT ELEVATIONS: TOP OF FOUNDATION 103.8 A 4" INVERT AT BUILDING 101.10 B 4" INVERT AT SEPTIC TANK (IN) 100.81 C 4" INVERT AT SEPTIC TANK (OUT) 100.64 D 4" INVERT AT DIST. BOX (IN) 100.52 E 4" INVERT AT DIST. BOX (OUT) 100.35 F INVERTS AT LEACHING FACILITY: COVER 1111 1 4" INVERT AT BEGINNING ! I •;;� OF LEACHING TRENCH 100.2 G 4" INVERT AT END PVC1. UNLESS UNDER PAVEMENT, DRIVES OR TRAVELED WAYS WHEREIN H-20 LOADING OF LEACHING TRENCH 100.0 H ELEVATION AT BOTTOM 6' . 5,5' OUTLETS 8' OF LEACHING TRENCH 98.0 J ESTIMATED GROUNDWATER PROPOSED SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR ELEVATION 93.0 K VARIANCES REQUESTED: 1,161119 DISTRIBUTION BOX DETAIL: NOT TO SCALE ASSESSORS MAP 80 PRECAST SEPTIC TANK PARCEL 52 7 LOCUS O C 7" PINE 5,-2" FINISHED GRADE - 40 OR EQUAL 5' REMOVABLE 2' WALLS NOTES: COVER 1111 DISTRIBUTION BOX DETAIL: NOT TO SCALE ASSESSORS MAP 80 I // // PARCEL 52 DISPOSAL FACILITY ONLY. LOCUS 0 O 7" PINE NO. OF OUTLETS : 5 FINISHED GRADE ,I m 40 OR EQUAL X 102.9 REMOVABLE 2' WALLS NOTES: COVER 1111 1 X 102.9 ! I •;;� ;,• • 2. 7" PINE DIST, BOX TO WITHSTAND H-10 LOADING RAYMOND & MARY VANOVER PVC1. UNLESS UNDER PAVEMENT, DRIVES OR TRAVELED WAYS WHEREIN H-20 LOADING 1 LOT 9 15' SHALL APPLY. 6' . 5,5' OUTLETS 8' 1 2. PROVIDE INLET TEE OR BAFFLE WHERE - PARCEL 53 PROPOSED SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR :a + ea e, a .,a e, a era eea r IN PUMPED SYSTEM. STATUTE CHAPTER 82, SECTION 409 AT 111. 1-888-344-7233. THE 2' 3. FIRST TWO FEET OF PIPE OUT OF DIST. BOTTOM ON LEVEL" STABLE BASE ---146" MIN. 3/4' TO BOX TO BE LAID LEVEL CROSS-SECTION /2 1/2' CRUSHED 1 1 1BASE 4. ALL PIPE CONNECTIONS AND CONCRETE OF FOUNDATION 102.8 (1 p MIN) X I CONSTRUCTION SHALL BE WATERTIGHT. 3 10" 14"il�2 e INLET TEE 4'4'-6" ` 4'-0" MIN. ao' �5 -4" 15 1/2"LIQUID DEPTH (� �N . _ F= _ :e:: -o-.4 _•. �.-�:< LZ& BOTTOM ON LEVEL STABLE BASE PLAN VIEW 6" MIN. 3/4' TO 'D'r 1 1/2" STONE CROSS-SECTION VIEW yV 101.6 X 101.6 l 11 x / 101.65 i HIGHPOINT /Ian IN ROAD 7" OAK 41 11 ! X 102.6 / 0 " 7" AK WO O PST 04 / o 7" OAK /X 101.2 11 \ ( \ / 2 m 7" PINE DIRT / 7" OAK / 2 DRIVE w 104.8 7" OAK 11 \w 7" OAK I 11 4 7" .OAK I 11 7" OAK 4 34.8' X 102.0 �J I /I W W 30 1/0 PRECAST DIST. BOX T 7:F7- k1 2 PLAN VIEW N 82'04'30- W 5. 5. FILL ALL UNUSED KNOCKOUTS WITH MORTAR. N/F II w KATHLEEN ANN RAY 0 LOT 8 a ASSESSORS MAP 80 I // // PARCEL 52 DISPOSAL FACILITY ONLY. LOCUS 0 O 7" PINE 0 10.3' 7" PINE ,I m LEACHING TRENCH DETAIL: NOT TO SCALE 36' MAX .COVER FINISHED GRADE LOAM &SEED DISTURBED AREAS c Al CAP ENDS 4' PVC ..� . . _4' _jM[2F 4=VC=-D.045Z.' . s.a_• ea a ea a ea o ea a oa a sa a ea a oa a oa a ea o o �za• EMDUNE A" /ea�aeQe et ea easaete etea�aet" oQp�aetee r LEVEL BOTTOM 38' PROFILE 36' MAX. - 12' MIN. COVER /2% MIN. FINISH GRADE / /_ 4" MIN. LOAM & SEED 24' 1 24' 24 24' TYP TYP CROSS-SECTION 2"MIN. OF 1/8' TO 1/2" WASHED STONE TO 1-1/2' DOUBLE ED STONE (NO FINES) DESIGN CRITERIA: DESIGN FLO 3 BEDROOMS AT110G.P.B./D 330 G.P.D. REQUIRED SEPTIC TANK: 330 X 200% = 660 GAL. SEPTIC TANK PROVIDED: = 1500 GAL. SIZE OF LEACHING FACILITY REQUIRED: DESIGN PERC. RATE: <2 MIN./ INCH LONG TERM APPL. RATE 0.74 G.P.D/S.F. 330 GPD + 0,74 GPD/SF = 446 S.F. SIZE OF LEACHING FACILITY PROVIDED- 2-2' WIDE, 2' DEEP, 38' LONG TRENCH iP • 2x(2'+2'+21)x38' = 456 S.F. OF LEACHING AREA 456 x 0,74 GPD / SF = 337 GPD 337 GPD PROVIDED > 330 GPD REQUIRED TP#1 TOP TOP 105.00' Q 2. 12/27/02 SEPTIC TO REAR I I // // STOCKADE DISPOSAL FACILITY ONLY. LOCUS INFORMATION 7" PINE FENCE ENCE 10.3' 7" PINE II 40 OR EQUAL X 102.9 LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE X 102.9 ! I N/F CURRENT OWNER: 7" PINE SIEVE ANALYSIS: RAYMOND & MARY VANOVER 28 0 <10 % OF No. 4 SIEVE SHALL / 102.9 X 102 g X LOT 9 PASS No. 200 PROPOSED "D" BOX ASSESSORS MAP 80 IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- - PARCEL 53 PROPOSED 3 BEDROOM COMPANY AND MAINTAINING THE 10,406± S.F. GARAGE THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT 111. 1-888-344-7233. THE TOP OF SLAB = 103.1' o UTILITIES AND SUBSURFACE STRUCTURES /� II I / o PLAN REFERENCE: I OF FOUNDATION 102.8 (1 p MIN) X I I - 24' 1 24' 24 24' TYP TYP CROSS-SECTION 2"MIN. OF 1/8' TO 1/2" WASHED STONE TO 1-1/2' DOUBLE ED STONE (NO FINES) DESIGN CRITERIA: DESIGN FLO 3 BEDROOMS AT110G.P.B./D 330 G.P.D. REQUIRED SEPTIC TANK: 330 X 200% = 660 GAL. SEPTIC TANK PROVIDED: = 1500 GAL. SIZE OF LEACHING FACILITY REQUIRED: DESIGN PERC. RATE: <2 MIN./ INCH LONG TERM APPL. RATE 0.74 G.P.D/S.F. 330 GPD + 0,74 GPD/SF = 446 S.F. SIZE OF LEACHING FACILITY PROVIDED- 2-2' WIDE, 2' DEEP, 38' LONG TRENCH iP • 2x(2'+2'+21)x38' = 456 S.F. OF LEACHING AREA 456 x 0,74 GPD / SF = 337 GPD 337 GPD PROVIDED > 330 GPD REQUIRED TP#1 TOP TOP 4" Pic Q 2. 12/27/02 SEPTIC TO REAR I I // // 7lxl DISPOSAL FACILITY ONLY. LOCUS INFORMATION 7" PINE 13' O II 40 OR EQUAL I I LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL, SUBSOIL AND OTHER ! I III CURRENT OWNER: RAYMOND & MARY VANOVER SIEVE ANALYSIS: PROPOSED PASS No. 50 SIEVE <10 % OF No. 4 SIEVE SHALL / 102.9 X 102 g X <5 % OF No. 4 SIEVE SHALL PASS No. 200 PROPOSED 150 GAL IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- - TITLE REFERENCE: 14243/242 3 BEDROOM COMPANY AND MAINTAINING THE I x/ I THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT 111. 1-888-344-7233. THE DWELLING 2pTANK0 UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND II I / o PLAN REFERENCE: 131/39 OF FOUNDATION (MIN) N THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED ASSESSORS MAP: 80 103.8 MIN OF FIRST FLOOR o 104.8 ` BSC GROUP v/` �? Irl II / I PARCEL: 53 25 0. I //POLE 11 7" OAK � / II POLE NN / IP 105. on N/F =E2 SIMON MILBERG LOT 10 ASSESSORS MAP 80 PARCEL 54 N8_27----- W PLAN VIEW 1 FEET 0 5 10 20 illyxi. PROPOSED BULKHEAD 3 C) 7" OAK TP#2 x102.5 SHED 102.7 " 7" OAK / ZONING DISTRICT: R-40 SETBACKS: FRONT 30' SIDE(PER ZONING OFFICER) (J I REAR 20' U MINIMUM LOT SIZE: 40,000 S.F. 7" OAK N/F OVERLAY DISTRICT. NONE EDWARD G. LOUSEY NITROGEN SENSITIVE LOT 2 ZONE: NOT IN A ZONE II ASSESSORS MAP 80 PARCEL 46 FEMA FLOOD ZONE "C" OS SHOWN ON ZONE DISTRICT. COMMUNITY PANEL 250015 0004 C DATE: JUNE 17, 1986 LOCUS PLAN: NO SCALE N/F KARIN G. WALLIN LOT 1 ASSESSORS MAP 80 PARCEL 45 N i% 5-,1,ff�Z NI MID -CAPE HIGHWAY 6 Z 3 D H Z r'9TlO� = NN RD 9L� Y LOCUS REVISIONS 4u 1. 6/24/02 HSE DIMENSIONS 2. 12/27/02 SEPTIC TO REAR GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND 7lxl DISPOSAL FACILITY ONLY. YUO2.5 MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. fo OR TRAVELED WAY SHALL BE SCHEDULE EDWARD G. LOUSEY NITROGEN SENSITIVE LOT 2 ZONE: NOT IN A ZONE II ASSESSORS MAP 80 PARCEL 46 FEMA FLOOD ZONE "C" OS SHOWN ON ZONE DISTRICT. COMMUNITY PANEL 250015 0004 C DATE: JUNE 17, 1986 LOCUS PLAN: NO SCALE N/F KARIN G. WALLIN LOT 1 ASSESSORS MAP 80 PARCEL 45 N i% 5-,1,ff�Z NI MID -CAPE HIGHWAY 6 Z 3 D H Z r'9TlO� = NN RD 9L� Y LOCUS REVISIONS NO. DATE DESCRIPTION 1. 6/24/02 HSE DIMENSIONS 2. 12/27/02 SEPTIC TO REAR GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL, SUBSOIL AND OTHER IMPERVIOUS MATERIAL 6. REPLACE WITH CLEAN WASHED SAND OR OTHER CLEAN GRANULAR SOILS CONFORMING TO THE FOLLOWING SIEVE ANALYSIS: 10% (MAX) BY WT. SHALL PASS No. 50 SIEVE <10 % OF No. 4 SIEVE SHALL PASS No. 100 <5 % OF No. 4 SIEVE SHALL PASS No. 200 UNIFORMITY COEFFICIENT ® No. 4 SIEVE </=6.0 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT 111. 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, LOCATION AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 8. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FACILITY. ` BSC GROUP 657 Main Street, (RT. 28) Unit 6 W. Yarmouth Massachusetts 02673 508 778 8919 PROJECT TITLE: SEWAGE DISPOSAL SYSTEM DESIGN #32 KATHY ANN ROAD S. YARMOUTH MASSACHUSETTS v� -,17 3 PREPARED FOR: RAY VANOVER 975 S. HIGHLAND DRIVE IDAHO FALLS, ID 83401 DATE: JULY 26, 2001 COMP. DESIGN: K. HEALY CHECK: D. CRISPIN DRAWN: P. HAGIST FIELD: D. GAZZOLO / J. McCARTIN FILE NO. 8306SEP1.DWG DWG NO. 5314-01 SHEET 1 OF 1 JOB NO. 4-8306.00 ,