Loading...
HomeMy WebLinkAboutEngineered Plans - Rev. 2015TOP OF FOUNDATION EL. 98.0' EL. 100.0' PROP. EL. 100.0' 4" CAST IRON or EQUIVALENT MIN. PITCH 1/4" PER FOOT 4" SCHEDULE 40 PVC PIPE FF (DATUM: ASSUMED) EL. 97.5' FLOW LINE soma GAS BAFFLE 1000 GALLONS 1••:1500 GALLONS 1500 GALLON SEPTIC TANK (DUAL COMPARTMENT) (PROPOSED) LOT 10 BLOCK "A" 0.18 ACRES± ,--99— I Fl - 10 —99— in- 10' 120.00' SEPTIC SYSTEM PROFILE Flaherty Environmental Services (not to scale) INSP. PORT W I 3" OF GRADE P.O. Box 81 GEOTEXTILE Yarmouth Port MA 02675 4" SCHEDULE 40 PVC PIP (first 2'to be lever 6" CRUSHED STONE OR ,MECHANICALLY COMPA( #21 — CP D AS PE tIC EL. 98.0' CLEAN SAND PROP. EL. 99,0' 508.362. X657 \� LOCAL UPGRADE APPROVAL: MAXIMUMUM FEASIBLE COMPLIANCE- " 310 CMR 15.405(1)(h)(2) REDUCTION IN SETBACK FROM BOTTOM OF SAS TO ., EL. 96.76'± HIGH G.W. ELEV.- FROM 5 TO 4 LOCAL POLICY: 92 TO REDUCE THE ESTIMATED HIGH GROUNDWATER 35' EL. 95.43' ADJUSTMENT FROM 2.3' TO 2.0' 310 C R 15.000 BOTTOM OF TEST HOLE=88-1V WELL- MIW-29 SOIL ABSORPTION SYSTEM GROUNDWATER ELEV891' ZONE- A (16) HIGH CAPACITY INFILTRATORS : . 4.33 READING- 9.41' WITH NO STONE AS SHOWN IN A BED USGS ADJUSTMENT: 2.3' DATE- OCT. 2015 CONFIGURATION 11.33'W X 25, 01 X 0.92`D ADJ.G.W.ELEV: 91.4' EL. 91.1' ADJ.- 2.3' REQUIRED: 5' REMOVAL OF LOCATIONMAP "A" & "B" HORIZONS WITHIN 5' OF PROPOSED SAS. NO TH Z rim EXISTINGSCP 100— _ 3 BR _ -t J I aTWO FAMILY y DWELLING 1 X10' co20' Cil a #19 I N �,- I SLEEVE LINE WITHIN y 10' OF WATER L — S ERVICE, ___. ____ GAS -- GAS - GAS - GAS GAS - GAS 120,00' 35,9CAUTION! SEE NOTE #61 i Permit valid for REPAIR OF SEPTIC SYSTEM ONLY,- doe to State and Local septic variances. Board of llealth review and approval is required For any future additions/rc m%Mionslaltera-tions to Sewage faeilities_and/or structures/dwelling; Yarmouth Health Department APPROVEW- .N' SCALE: 1" = 201 REP PB 75 PG 27 NOFMq DAVID " SSTS` SgNITAR�P� NTS Rt. 28 mLOCUS a� A w DEC , 2015 HEALTH DEPT. DATE: 1112212015 I REVISED: 1217115 REVISED: 12/16115 SITE AND SEWAGE PLAN FOR B & B EXCAVATION, INC./ JANIS UMSCHLAG 19/21 THATCHER ROAD SOUTH YARMOUTH, MA ' r I PAGE 1 OF2 GENERAL NOTES 1. ALL PRECAST COMPONENTS TO BE H-10 RATED. ALL COMPONENTS WITH ANY ANTICIPATED VEHICULAR TRAFFIC TO BE H-20 RATED. 2. THE DESIGN OF THIS SYSTEM DOES NOT ALLOW FOR THE USE OFA GARBAGE GRINDER. 3. MUNICIPAL WATER IS AVAILABLE. 4. ALL CONSTRUCTION TO CONFORM WITH 310 CMR 15.000 AND ALL OTHER APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS. 5. INSTALLER/CONTRACTOR TO REVIEW & VERIFYALL ELEVATIONSAND DETAILS AND REPORT ANY DISCREPANCIES TO DESIGNER PRIOR TO CONSTRUCTION OR ASSUME ALL RESPONSIBILITY. 6. INSTALLER/ CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SAFE WORK AREA, VERIFYING ALL UTILITIES AND NOTIFYING "DIG SAFE" (1-888-344-7233) 72 HOURS PRIOR TO CONSTRUCTION. 7. ANY CHANGES TO OR DEVIATIONS FROM THIS PLAN MUST BE APPROVED IN WRITING BY FLAHERTY ENVIRONMENTAL SERVICES AND LOCAL BOARD OF HEALTH. 8. FINISH COVER OVER COMPONENTS IS NOT TO EXCEED 3' PER 310 CMR 15.000 UNLESS SHOWN PER PLAN. 9. ALL ABANDONED SEPTIC SYSTEM COMPONENTS TO BE PUMPED DRY AND FILLED WITH CLEAN SAND OR REMOVED AND REPLACED WITH CLEAN SAND. 10.ALL COMPONENTS TO BE PROVIDED WITH WATERTIGHT ACCESS PORTS WITHIN 6" OF FINISH GRADE. 11.ALL SEPTIC TANKS, DISTRIBUTION BOXES AND PIPING TO BE INSTALLED WATERTIGHT. 12. NO KNOWN WETLANDS OR WELLS WITHIN 100 FEET OF PROPOSED LEACHING. 13. THIS IS NOT A CERTIFIED PLOT PLAN AND UNDER NO CIRCUMSTANCES IS THIS PLAN TO BE USED FOR ZONING OR BUILDING PURPOSES. 14. LOT IS SHOWN AS ASSESSOR'S MAP 33 LOT 376. 15.LOCUS PROPERTY IS NOT LOCATED WITHIN AN AQUIFER PROTECTION DISTRICT (ZONE II). DESIGN CALCULATIONS I SYSTEM DETAIL Flaherty Environmental Services NUMBER OFACTUAL BEDROOMS 3 GARBAGE DISPOSAL UNIT NO TOTAL ESTIMATED FLOW °Z DA D ° SITE AND SEWAGE PLAN FOR (110 GAUBRIDAYX 3 BR) 330 GALADAY B & B EXCAVATION, INC,/ REQUIRED SEPTIC TANK CAPACITY 660 GAL. 1ANIS UMSCHLAG SIZE OF SEPTIC TANK 1500 GAL. (PROPOSED) required training, expertise, and experience described (2 COMP.) 19/21 THATCHER ROAD SOIL CLASSIFICATION 1 SOUTH YARMOUTH, MA DESIGN PERCOLATION RATE < 2 MINANCH EFFLUENT LOADING RATE 0.74 GAL./DAY/FT2 FAGE20F2 LEACHING AREA 11.33' (16 UNITS) x (6.25) = 100 LF 100'x 4.73 SF/LF = 473 EFF. LEACHING AREA 473 ELA x 0.74 = 350 GPD USE (16) HIGH CAPACITY INFILTRATORS WITH NO STONE IN (4) ROWS OF (4) AS DIAGRAMMED IN A 25.0'L X 11.33'W X 0.92D CONFIGURATION RESERVE LEACHING CAPACITY N/A SOIL EVALUATION TEST HOLE #1 Evaluator: David D. Flaherty Jr., RS, REHS SE#2755 BOH Witness: Amy Von Hone, RS, CHO Date: November 10, 2015 TH-1 ELEV. 98.0' 0--10- J A/E LS 10YR 312 10"-27" 1B LS 10YR516 27" - 115" 1 C FMS 2.5Y 614 G.W. ELEV. 89.1' 1'67 if BOTTOM TH-1 ELEV. 88.4' ELEV. 93.25' io. P. 0. Box 81 Yarmouth Port, MA 02675 508.362.1657 UD3, rum 1 (NTS) L.OJ 6.25' HIGH CAPA CITY INFIL TRA TOR (SIDE) (NTS) (LENGTH) H OF MA190, °Z DA D ° SITE AND SEWAGE PLAN FOR l certify that on November 12, 2002, l have passed the examination approved by the Department of Environmental Protection and that the above analysis F B & B EXCAVATION, INC,/ 1ANIS UMSCHLAG has been performed by me consistant with the N 2 required training, expertise, and experience described P p 19/21 THATCHER ROAD in 310 CMR 15.018(2). G/ S TERM SOUTH YARMOUTH, MA SJNiT R� I L FAGE20F2