Loading...
HomeMy WebLinkAbout2015 Dec 07 - Email to D.Flaherty, RS Re: Required Revisions i � � ' vonHone, Amy � - From: vonHone, Amy � ° Sent: Monday, December 07, 2015 10:08 AM � To: 'flaherty822@comcast.net' Subject: 19-21 Thatcher Road revisions Attachments: 19-21 THATCHER RD.PDF i j Hi Dave- i ; I have reviewed the plan for this and have some comments/revisions to be addressed prior to approval: i � �!�'"f. Shift proposed septic tank to maintain a minimum 10'from the water line I C'�L. Shift leach 5' to the rear to maintain the required minimum 20' from the foundation { ��i'3. List the groundwater variance (5'to 4.13') in the MFC Variances � L�. Show a liner along the outer 5' removal of the leach to meet breakout ��. Show the grade change/fill needed over the septic tank I have attached a copy of the plan for your review. Please call or email with any questions. I will need 3 revised stamped copies for issuance of the installation permit. Thanks, Amy Amy L.von Hone, R.S., C.H.O. Assistant Health Director Yarmouth Health Department 1146 Route 28 South Yarmouth, MA 02664 (0) 508-398-2231 X1241 (F)508-760-3472 avonhoneCDvarmouth.ma.us 1