Loading...
HomeMy WebLinkAbout6 Lauries Lane Site Plani TOP FNDN. AT EL. 23.1' SYSTEM PROFILE ACCESS COVER TO WITHIN OF FIN. GRADE INOT TO SCALE) 6" /- ACCESS COVER (WATERTIGHT) TO 22.5' MINIMUM .75 OF COVER OVER PRECAST �! WITHIN 6" OF FIN. GRADE 2% SLOPE REQUIRED OVER SYSTEM 21.8 2" DOUBLE WASHED PERSTONE s RUN PIPE LEVEL / t 21.6 FOR FIRST 2' PROPOSED 1500 * 20.65' GALLON SEPTIC 20.0' Ia!l20.2_5'J/TANK (H- 1 �) BGASAFFLE , o 9.17' p p O = . 0 C] 0 O O og 1998 .4ia�z 0 19.0' OOOO 0 0000 0 MIN 0000 a000 ( 7. SLOPE) \_6" CRUSHED STONE OR MECHANICAL o2,111 0 0 Cl Cl 0 E] Cl O 0 COMPACTION. (15.221 [2]) oo `� DEPTH OF FLOW = 4' (-,q-7 SLOPE) (-!-% SLOPE) 3/4" TO 1 1/2" DOUBLE WASHED STONE TEE. SIZES:. INLET DEPTH = 10" OUTLET DEPTH 14 33' _LEACHING FOUNDATION- 26' SEPTIC. TANK 21 D BOX 19' FACILITY 13' *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION Of SEPTIC SYSTEM ALL SEWER LINES TO BE 4" SCH. 40 PVC, TO BE CONNECTED TO PROPOSED SEPTIC TANK AT MIN. 2% SLOPE TEST HOLE LOGS PROVIDE INSPECTION PORT WITHIN 6' OF FINISH GRADE ENGINEER: LISA LYONS, RS 2.8WITNESS: AMY VON HONE. RS DATE: 4//'1.105 3' MAX. PERC. RATE _ < 2 MIN/INCH 19.8' CLASS I SOILS P# Q ELEV. 17.0' 0" 22.4' o - A LS 9" 1OYR 3/3 B 6.2' LS 29" 10YR 4/6 19.98' C 10.8, PERC F/MS 2.5Y 6/4 ASSESSORS MAP 69 PARCEL 163 VARIANCES REQUESTED UNDER MAX. FEASIBLE COMPLIANCE 15.405: lo: REDUCTION IN SETBACK, SAS TO LOT LINE (10' TO 5'); ST TO LOT LINE (10' TO 5') lb: REDUCTION IN SETBACK, SAS TO FOUNDATION (20' TO 15'); ST TO FNDN (10' TO 8') z2 139" 10.8' s HED 2.6 NGWE 22.5 NOTES: PROVIDE SWEEPS/LONG TH 2.0 NOT ALLOWED ASSUMED o� ® RADIUS BENDS THIS LINE. SEPTIC DESIGN: (GARBAGE DISPOSER I5 ) 1. DATUM IS g5'DESIGN FLOW: 3 BEDROOMS ( 110 GPD) 330 GPD 2. MUNICIPAL WATER IS EXISTING $ CID 7+2 4 \� USE A 330 GPD DESIGN FLOW 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. si� s PROVIDE CLEANOUT 330 2 = 660 4. DESIGN LOADING FOR ALL PRECAST. UNITS TO BE AASHO H 16" OAK - 10 zz.e 'CJS SEPTIC TANK: -GPD (-) 5. PIPE JOINTS TO BE MADE WATERTIGHT. II � \ � 14" OAK USE A 1500 GALLON SEPTIC TANK 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS, CONC. INV• L ENVIRONMENTAL CODE TITLE V. _I- + 2 .4 ELK. ! 21.6' LEACHING: i I 22�a 123 2 ,4 ^� NV. EL 21.6'. i/i _ -- - SIDES: 2(33 + 8.83) 2 (.74) = 7. THIS PLAN IS FOR PROPOSED SEPTIC SYSTEM ONLY AND IS NOT 23.3�RoP�S� SUN = 215 TO BE USED FOR ANY OTHER PURPOSE. i A RDOM //'X/�� BOTTOM: 33 x 8.83 (.74) 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. SHED 229 IN~ 20.65 {ice n� 9 456 338 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT 22.2 �tO TOTAL: S.F. GPD 21.1 USE (3) 500 GAL LEACHING CHAMBERS (ACME OR INSPECTION BY BOARD OF. HEALTH AND PERMISSION OBTAINED Exlsr. DWELL ti FROM BOARD OF HEALTH. ti RHEgp 20.2 EQUAL) WITH 2' STONE AT SIDES AND 3.75' AT 22D S. + 10. PUMP &REMOVE (OR FILL W/CLEAN SAND) EXISTING SEPTIC SYSTEM T ENDS 22.4 yp 22.2 !y. so. ,K2U,1 LEGEND TITLE 5 SITE PLAN 1.0 BENCH MARK - CTR OF LOT 15 �� � C.BASIN EL. = 20.0 100.0 PROPOSED SPOT ELEVATION OF 7,999± SQ. FT. 9�.' 6- LAURIE'S LANE 100x0 EXISTING SPOT ELEVATION IN THE TOWN OF: f *los \ PROPOSED CONTOUR 100 (SOUTH) YARMOUTH � 2 �/ PJR 100- EXISTING CONTOUR PREPARED FOR: LINDA KING X20.7 20 0 20 40 60 BOARD OF HEALTH MA SCALE: 1" = 20' DATE: APRIL 13, 2005 APPRDVED DATE mg soe xx-oeeo OF 7,(SS1H OF'k'9S down cape engineering, inc. o+ naNEH �C �°+ ARNE OJALAt H. CIVIL ENGINEERS CIVIL omIIL LAND �URVEY0RS 't N .3079 •2 e u i n9 main st. ydrt�0uth, ria 02675 AR JALA,' XL S. DATE 05-062 r f I e TOP FNDN. AT EL. 23.1' SYSTEM PROFILE ACCESS COVER TO WITHIN OF FIN. GRADE INOT TO SCALE) 6" /- ACCESS COVER (WATERTIGHT) TO 22.5' MINIMUM .75 OF COVER OVER PRECAST �! WITHIN 6" OF FIN. GRADE 2% SLOPE REQUIRED OVER SYSTEM 21.8 2" DOUBLE WASHED PERSTONE s RUN PIPE LEVEL / t 21.6 FOR FIRST 2' PROPOSED 1500 * 20.65' GALLON SEPTIC 20.0' Ia!l20.2_5'J/TANK (H- 1 �) BGASAFFLE , o 9.17' p p O = . 0 C] 0 O O og 1998 .4ia�z 0 19.0' OOOO 0 0000 0 MIN 0000 a000 ( 7. SLOPE) \_6" CRUSHED STONE OR MECHANICAL o2,111 0 0 Cl Cl 0 E] Cl O 0 COMPACTION. (15.221 [2]) oo `� DEPTH OF FLOW = 4' (-,q-7 SLOPE) (-!-% SLOPE) 3/4" TO 1 1/2" DOUBLE WASHED STONE TEE. SIZES:. INLET DEPTH = 10" OUTLET DEPTH 14 33' _LEACHING FOUNDATION- 26' SEPTIC. TANK 21 D BOX 19' FACILITY 13' *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION Of SEPTIC SYSTEM ALL SEWER LINES TO BE 4" SCH. 40 PVC, TO BE CONNECTED TO PROPOSED SEPTIC TANK AT MIN. 2% SLOPE TEST HOLE LOGS PROVIDE INSPECTION PORT WITHIN 6' OF FINISH GRADE ENGINEER: LISA LYONS, RS 2.8WITNESS: AMY VON HONE. RS DATE: 4//'1.105 3' MAX. PERC. RATE _ < 2 MIN/INCH 19.8' CLASS I SOILS P# Q ELEV. 17.0' 0" 22.4' o - A LS 9" 1OYR 3/3 B 6.2' LS 29" 10YR 4/6 19.98' C 10.8, PERC F/MS 2.5Y 6/4 ASSESSORS MAP 69 PARCEL 163 VARIANCES REQUESTED UNDER MAX. FEASIBLE COMPLIANCE 15.405: lo: REDUCTION IN SETBACK, SAS TO LOT LINE (10' TO 5'); ST TO LOT LINE (10' TO 5') lb: REDUCTION IN SETBACK, SAS TO FOUNDATION (20' TO 15'); ST TO FNDN (10' TO 8') z2 139" 10.8' s HED 2.6 NGWE 22.5 NOTES: PROVIDE SWEEPS/LONG TH 2.0 NOT ALLOWED ASSUMED o� ® RADIUS BENDS THIS LINE. SEPTIC DESIGN: (GARBAGE DISPOSER I5 ) 1. DATUM IS g5'DESIGN FLOW: 3 BEDROOMS ( 110 GPD) 330 GPD 2. MUNICIPAL WATER IS EXISTING $ CID 7+2 4 \� USE A 330 GPD DESIGN FLOW 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. si� s PROVIDE CLEANOUT 330 2 = 660 4. DESIGN LOADING FOR ALL PRECAST. UNITS TO BE AASHO H 16" OAK - 10 zz.e 'CJS SEPTIC TANK: -GPD (-) 5. PIPE JOINTS TO BE MADE WATERTIGHT. II � \ � 14" OAK USE A 1500 GALLON SEPTIC TANK 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS, CONC. INV• L ENVIRONMENTAL CODE TITLE V. _I- + 2 .4 ELK. ! 21.6' LEACHING: i I 22�a 123 2 ,4 ^� NV. EL 21.6'. i/i _ -- - SIDES: 2(33 + 8.83) 2 (.74) = 7. THIS PLAN IS FOR PROPOSED SEPTIC SYSTEM ONLY AND IS NOT 23.3�RoP�S� SUN = 215 TO BE USED FOR ANY OTHER PURPOSE. i A RDOM //'X/�� BOTTOM: 33 x 8.83 (.74) 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. SHED 229 IN~ 20.65 {ice n� 9 456 338 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT 22.2 �tO TOTAL: S.F. GPD 21.1 USE (3) 500 GAL LEACHING CHAMBERS (ACME OR INSPECTION BY BOARD OF. HEALTH AND PERMISSION OBTAINED Exlsr. DWELL ti FROM BOARD OF HEALTH. ti RHEgp 20.2 EQUAL) WITH 2' STONE AT SIDES AND 3.75' AT 22D S. + 10. PUMP &REMOVE (OR FILL W/CLEAN SAND) EXISTING SEPTIC SYSTEM T ENDS 22.4 yp 22.2 !y. so. ,K2U,1 LEGEND TITLE 5 SITE PLAN 1.0 BENCH MARK - CTR OF LOT 15 �� � C.BASIN EL. = 20.0 100.0 PROPOSED SPOT ELEVATION OF 7,999± SQ. FT. 9�.' 6- LAURIE'S LANE 100x0 EXISTING SPOT ELEVATION IN THE TOWN OF: f *los \ PROPOSED CONTOUR 100 (SOUTH) YARMOUTH � 2 �/ PJR 100- EXISTING CONTOUR PREPARED FOR: LINDA KING X20.7 20 0 20 40 60 BOARD OF HEALTH MA SCALE: 1" = 20' DATE: APRIL 13, 2005 APPRDVED DATE mg soe xx-oeeo OF 7,(SS1H OF'k'9S down cape engineering, inc. o+ naNEH �C �°+ ARNE OJALAt H. CIVIL ENGINEERS CIVIL omIIL LAND �URVEY0RS 't N .3079 •2 e u i n9 main st. ydrt�0uth, ria 02675 AR JALA,' XL S. DATE 05-062 r