Loading...
HomeMy WebLinkAbout90.68 - Site and Sewage Plan31. I I PROPOSED I SOm GALLON SEPTIC �? 4 i I; TANK (H 12 UIX SLOPE) , DEPTH OF FLOW = + TEE SIZES: INLET DEPTH OU^LET DEPTH _14- (DR--3) '4- E CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 (21) SLOPE) FOUNDATION— h/0 SEPTIC TANK Fes' RUN PIPE LEVn FOR F1R57 2' % 4 .o � -znTv.S (ktX SLOPE) _ - '4 - ��L ✓O ]t-C-L::A�ti iii' sJ {o,i i 1 I 1 D' BOX — S 1— LEACHING FACILITY I I i I 4, N. 1 •v ! I _ � � I 4 I I WITNESS: (< 6-0- o+vim DATE: - 1-7 - a �-a PERC. RATE _ Z_ tiI CLASS -— SOILS P# N� SEPTIC S-ir, (G4RSAGE DLSPCISER t5 141:1 DESIGN FLO''. _ BEDROOMS (I!o cr USE A ]t C GPD DESIGN FLOW Z i � LEACHING: SIDES.- -- GPD GPD TOTAL: -.t:1 S C ' S GPD S C, I J I I 1 SEPTIC S-ir, (G4RSAGE DLSPCISER t5 A'v ✓o L=L�r7 DESIGN FLO''. _ BEDROOMS (I!o GPD) = '?' GPD USE A ]t C GPD DESIGN FLOW SEPTIC TANK GPo , _--- - -- GALLONS USE A GALLON SEP -r!- TANK LEACHING: SIDES.- -- GPD GPD TOTAL: -.t:1 S C ' S GPD — t 4- BOARD OF HEALTH DATE WE I I , dow; , cape engineering, Inc. CIVIL ENGINEERS LAND SURVEYORS PHONE 508-362-4541 FAX 508-362-9880 939 main st. yarmouth, ma m I I ' 3 V L LOCATION MAP ASSESSORS MAP Z'2 PARCEL P4-_ FLOOD ZONE BUILD!NG ZQN`: 141L_.._ SETBACKS: FRONT - SIDE - REAR - PLAN REFERENCE: I zs /49 'COTES. UM IS 2. MUNICIPAL WATER IS 3. MINIMUM PIPE PITCH TO BE 1,'8' PER FOOT. 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO-H__ S PIPE J^'NTS TO BE MADE WATERTIGHT. - c CONSTRUCTION DETAILS TO ;�E IN ACCORDANCE W'TN 'AASS E,NviRONVENTAL CODE TITLE V. 7. THIS PLAN ;S FOR PRCPCSED ',YORK ONLY AND '40T TC BF p JO- SEFOR LC I !"!� S ,:•/\„ 8a;v . P!PE r^R SENTI I� SYS;EM TO SCH. 40-4" PVC. 9 COMPONENTS NOT TO BE BACKFILLED OR CONCEA"ED N;THOJ; NSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FRCM BOARD OF HEALTH. 10. EXISTING CESSPOO4)TO BE PUMPED AND FILLED WITH CLEAN SAND OR REMOVED AS NECESSARY, SITE NTD SEWAGE PLAN OF IN THE TOWN OF: ------ PREPARED FOR: t D SCALE: J' - DATE: �' AFiNE \v. \ iN OF , rI Ri y�l �t CtVN. ° 0J DATE