Loading...
HomeMy WebLinkAbout149.66 - Proposed Septic Design4 4" CAST IRON PIPE (OR EQUAL MINIMUM PITCH 1/4 PER FT. ELEV ELEV = 4 4 20 FT. MINIMUM FROM CELLAR 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE COVERS rlji9 ��d&il 4 74" SCHEDULE 40 PVC PIPE h MIN. PITCH 1/8" PER FT. ZABEL A100 FILTER TEE FIOW LINE �Mo 19.y LEVEL LEV � �- BAFFLE ELEV. _ ..I `' ' 7 6" SUMP ELEV 19'S I DISTRIBUTION ELEV. -i (TO BE PLACED ON FIRM BASE) BOX I.9�'- TO BE WATER TESTED 500 GALLON IF MORE THAN ONE OUTLET SEP "I C TANK (TO BE PLACED ON FIRM BASE) 3/4" TO 1 1/2"-/ WASHED STONE SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE r rell VENT-,, CLEAN SAND LOAM AND SEED 2" LAYER OF 1 /8" 701/2- MINIMUMs? WASHED STONE VENT ? 1 CU. FT. OF CONCRETE o ANCHOR Ln -o% ° , 10" o .0 ELEV. z< .WL � _ _/f�•3 - :2,< HIGH CAPACITYCCIIINFILATRATORS WITH TONE IN?ln 1X In X 10" FIELD FORMATION 3 WELL SDW 252 SOIL ABSORPTION NDEX 47.3 SYSTEM (SAS) ADJUST 1.4 !?c�'Lcu6D R T USGS PROBABLE WATER TABLE ELEV. = 2.9 Ec_ 1Y.3 OBSERVED WATER TABLE ( 9 / 24 / 97 ) ELEV. = 1.5 - BOTTOM OF TEST HOLE ELEV. = 0.5 D. BOX 1500 GALLON SEPTIC TANK O yc rs �0 O L !� �0 .0 BF`pROSr� S / ! `k O hr ��. L0?'�5 (L \ 15- '16.45' �- Zg`�O ASIN R MCH 13.48 BM PK NAIL ELEV. = 14.72 IV (NGVD) D• Du.«4t 70 P '..n fu/.7 -Z9 r GARY lc� ✓ P!r/2 C r vB " s -z r5� 3/ Sa rL 74-rT G tY' CLA G r• 1; 4 2 .r T V cz l2�3 SOIL TEST DATE OF SOIL TEST SEPT, 24, 1997 SOIL TEST DONE BY SKETSER ENGIKFERING WITNESSED BY Q, MURPHY OBSERVATION HOLE 1 ELEV.- 16,5 OBSERVATION HOLE 2 ELEV- 15.3 PERCOLATION RATE _S16 VN./INCH AT 46 INCHES PERCOLATION RATE S 9- MIK/INCH AT 42 INCHES DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-9 0/A SANDY LOAM 1tYR3/3 ROOTS 9-33 B LOAMY SAND 10YR5/6 ROOTS 33-72 Ci SILT LOAM 10YR6/2 DATE DEC. 11. 1997 TIGHT 72-15 C2 SILT CLAY LOAM SCY REVISED � TIGHT NO WATER ENCOUNTERED AT 1500 ELEV. - 4.3 tw DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-11 0/A SANDY LOAM t0YR3/2 ROOTS 11-26 B LOAMY SAND 10YR5/5 ROOTS 26-38 Cl FINE SAND 10YR6/4 DATE DEC. 11. 1997 38-108 C2 SILT LOAM 10YR6/2 REVISED � TIGHT 08-13 C3 SILT CLAY LOAM 5GY NO WATER ENCOUNTERED AT 138• ELEV. rC.5 _ OBSERVATION HOLE 3 ELEV- 15.5 OBSERVATION HOLE 4 ELEv.- 15.9 PERCOLATION RATE < 15 VN./INCH AT 41 INCHES PERCOLATION RATE < 3 LIIN./INCH AT 44 INCHES PERCOLATION RATE < 7 MIN./INCH AT 70 INCHES DEPTH HORIZ I TEXTURE COLOR MOTT. OTHER 0-10 0/A SANDY LOAM IOYR3/2 PROJECT LOCATION LOT 5 125 LOCH RANNOCH WAY, YAR. 10-30 B LOAMY SAND t0YR6/3 30-42 Cl FINE SAND HYR6/2 DATE DEC. 11. 1997 42-102 C2 SILT LOAM 1CYR6/2 REVISED � 02-15 C3 SILT CL Y %,Y WATER ENCOUNTERED AT IIs_ ELEV. - 1.5 DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-10 0/A SANDY LOAM 10YR3/2 PROJECT LOCATION LOT 5 125 LOCH RANNOCH WAY, YAR. 10-30 B LOAMY SAND 10YR5/5 30-51 Cl FINE SAND 1OYR6/3 DATE DEC. 11. 1997 51-100 C2 SILT LOAM t0YR6/2 REVISED � 00-15 C3 SILT CLAY LOAM 5Cy NO WATER ENCOUNTERED AT 150' ELEV. - 3.4 DESIGN CALCULATIONS NOTES: N'JVPFR 01- FEDOOOMS 4 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. : A -R Ai.L % rsi -Si4 v` '. _Wiz' T1 CLE 5 AND THE TOWN OF YARMOUTH RULES AND T^7k, r-rviF.? ;1 r-rw REGULATIONS FOR THE SUMRFACE DISPOSAL OF SEWAGE. i ITC GAL /BFi./'JAY x 4 BR.} 44G GA�!'uAY 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO REQUIRED SEPTIC TANK CAPACITY 880 GAL. WITHIN 6" OF FINISHED GRADE. ACTUAL SIZE OF SEPTIC TANK 1500 GAL 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF SOIL CLASSIFICATION M WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN DESIGN PERCOLATION RATE < 20 MIN./IN. 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE EFFLUENT LOADING RATE 0.34 GAL/DAY/S.F. USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. LEA('HING AREA iz 6 SQ. FT. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL 36 X 36 BE MORTARED IN PLACE. LEACHING CAPACITY (AREA X RATE) �`0 GAL/DAY 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH r29f- X 0.34 DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO RESERVE LEACHING CAPACITY Z GALAAY OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. PARCEL IS IN FLOOD ZONE C. 8. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM. 9. ALL DISTURBED AREAS ARE TO BE REVEGETATED. 10. DESIGN ENGINEER AND HEALTH DEPARTMENT ARE TO INSPECT THE SEPTIC SYSTEM ON THE FOLLOWING SCHEDULE: A. SURVEYOR IS TO STAKE OVERDIG. B. ENGINEER IS TO INSPECT OVERDIG PRIOR TO FILLING. C: ENGINEER IS TO INSPECT PLACEMENT OF SEPTIC COMPONENTS PRIOR TO BACKFILLING. 11. DESIGN ENGINEER IS TO CERTIFY INSTALLATION OF SEPTIC SYSTEM IN ACCORDANCE WITH THIS PLAN. DF 12. SEPTIC TANK AND DISTRIBUTION BOX ARE TO BE SET ON A 6 BED ' OF 3/4" TO 1 1/2" STONE. T. A. 13. LOT IS SHOWN ON ASSESSORS MAP 132 AS PARCEL S5 " N'o'r't3 14. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS ,�+ J SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. slc' - A;ufTF1�%rte- .. nY• I LEGEND: EXISTING SPOT ELEVATION 00X0 EXISTING CONTOUR----00---- F1NAL SPOT ELEVATION FINAL CONTOUR 00 SOIL TEST LOCATION UTILITY POLE -O- TOWN WATER -WSW CATCH BASIN \® j GAS LINE G - APPROVED: BOARD OF HEALTH DATE AG7W 1 01997 SWEETSER ENGINEERING LOCUS C] !n LOC = RAN RANNpCH F Ki w' z� u c PROPOSED SEPTIC DESIGN FOR DAVID & BARBARA CLANCY PROJECT LOCATION LOT 5 125 LOCH RANNOCH WAY, YAR. SWEETSER ENGINEERING 235 GREAT WESTERN ROAD P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 SCALE 1" = 20' DATE DEC. 11. 1997 REVISED z a REVISED � LOCATION MAP J JOB N0. 40328 SHEET 1 0� 1 1 01997 SWEETSER ENGINEERING