Loading...
HomeMy WebLinkAbout151.102.1.1 - Proposed Septic Design (3)TOP OF FOUNDATION 20 FT. MINIMUM FROM CELLAR SOILTEST ELEV. - 10210 10 FT. MINIMUM 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE DATE OF SOIL TEST OCTOBER 23,,2003 r. CLEAN SAND$QfL TEST DONE BY'�WEETSER ENGINEERING I CONCRETE WITNESSED BY A. VON HOLlE COVERS INSPECTION PORT 4" SCHEDULE 40 PVC PIPE LOAM AND SEED OSSERVATION HOLE 1 ELEV._ 87.50 06SMATI�1 HOLE 2 ELEV.- 89.60 MIN. PITCH 1/8" PER FT.2' LAYER OF PERCOLATION RATE _c_ MIN./INCH AT 49 INCHES PERCOLATION RATE _5-2_ MIN./INCH IN C HORIZON 9.50 1/8 TO 1/2' 4` CAST IRON PIPE fi f11_ V4r 6" M,rA 92,00 MAX, WASHED STONE ENT a ea ci cv 94.60 (OR EQUAL) MINIMUM tT--T �1 89.75 W.N. NOT REQUIRED PITCH 1/4" PER FT. ELEV. - 92B0 ELEV. TEE r L1VEL BATS ELEV. _ _8987 6' SUMP ELEV. DISTRIBUTION ELEV. e (TO BE PLACED ON FIRM BASE) BOX - J 1500 GALLON IF TO BE WATER TESTED MORE THAN ONE OUTLET SEPTIC TANKV (TO BE PLACED ON FIRM BASE) 3/4" TO 1 1/2" CLEAN -/ DOUBLE WASHED STONE FREE OF FINES & SILT SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE 7 87.9 r • 8�.4 // ' / I SOIL r ' J r I ST 2 6b.7 I i __ . • 93.11 t •183.8r LIMITOF/ 1 r �' OVERDIG /r .51 I SOI ; ITES t I 181. lr / 145. 4 1 rr ) o, 83 I + 7. I I pm i 1504 GALLON C) v r '+ SE 71C TANK 9111.6 Se 90.4 LOT 11 15, 060.7 f S.F. • 90. i 038, 5A0.. o> ON IN BI- Effi- 11 MAI I ELEV. _ 87.87 6 HIGH CAPACITY INFILTRATORS WITH STONE IN AN z 11' X 48' X 10' TRENCH FORMATION 2 10'17 N WELL N/A NO WATER ENCOUNTERED AT 120_ ELEV. - 77 S SOIL ABSORPTION 0 ZONE SYSTEM (SAS) INDEX ADJUST USGS PROBABLE WATER TABLE ELEV. = __ OBSERVED WATER TABLE ( / / ) ELEV. _ BOTTOM OF TEST HOLE ELEV, a 1Z. LEGEND: EXISTING SPOT ELEVATION x0.0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION FINAL CONTOUR n, SOIL TEST LOCATION UTILITY POLE ca3 TOWN WATER -WSW- CATCH BASIN GAS LINE G CESSPOOL CP CLEANOUT DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-16 0/A LOAMY SAND 1OYR3/3 NO ROOTS 16-32 B LOAMY SAND t0YR5/8 LOAMY SAND 32-120 C i MEDIUM SAND 2.SY6/6 20% COBBLES /+ 98.2 99. 4 6.1 COLOR MOTT, OTHER 0-15 0/A 3 \ \4961 8 NO ROOTS 15-36 8 LOAMY SAND 10YR5/8 r 36-120 AH_ (1 99.8. DRIVE +1 r DATE OCT 24, 2003 AEY� ttcvAnaw tazco• 1" JOB N0. , 5541-00 (AZWD) / LOCATION MAP REVISED SHEET 1 OF 1 100.0 r O 9 \ 101.6 If r I *6 1 F , / Q i � • 96 ) I r20. 162.0 102.1 '1d30 ON10"11f19 tiooz ti t Ndf R C C E v E I JAN 1." 2Q04 Yarmouth Dant_ OF �V Fl T. A. QUMIA No. LST DEPTH HORIZ TEXTURE COLOR MOTT, OTHER 0-15 0/A LOAMY SAND 10YR3/3 NO ROOTS 15-36 8 LOAMY SAND 10YR5/8 aS177E, �s'El� MVGZtX7=1G 235 GREAT WESTERN ROAD 508- P. 0, BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 36-120 C MEDIUM SAND 2.5Y6/6 DATE OCT 24, 2003 NO WATER ENCOUNTERED AT _120_ ELEV. a __Z9.6.Q DESIGN CALCULA11ONS NUMBER OF BEDROOMS - 4 - GARBAGE DISPOSAL UNIT �!0 TOTAL ESTIMATED FLOW REQUI E D AL./BR./DAY A NK CAPPACITYe�) -No- GALGAL. ACTUAL SIZE OF SEPTIC TANK 1500 GAL. SOIL CLASSIFICATION _L_ DESIGN PERCOLATION RATE 5_5_ MIN./IN. EFFLUENT LOADING RATE A.7-4- GAL./DAY/S.F. LEACHING AREA 626_33 SQ. FT. (11 X48)•1•(59X2X1 O/12) LEACHING CAPACITY (AREA X RATE) &M GAL./DAY 626.33 X 0.74 RESERVE LEACHING CAPACITY X43,4$ GAL./DAY NOTES: . 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO O.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE, 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONRY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WfTH DEEDED OR ZONING REGULATIONS. OWNER / .APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 8. PARCEL IS IN FLOOD ZONE - C 9. LOT IS SHOWN ON ASSESSORS MAP 151_ AS PARCEL _102 10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH SAND AS SPECIFIED IN 310 CMR15.255:(3). 11. A NEGATIVE GRADE OF 3/4' PER FOOT SHALL BE MAINTAINED FOR A MINIMUM OF 15' AWAY FROM THE FOUNDATION, 112. A VARIANCE OF 2' IS REQUIRED FOR THE TOP OF FOUNDATION TO BE EVEN WITH THE HIGH POINT IN ROAD INSTEAD OF 2' ABOVE. APPROVED: BOARD OF HEALTH DATE AGENT - - - - - - L:'j58�PROJj584l-00�1584>-SAS DWG 02003 SWEETSER ENGINEERINGI �... FILE CSP FILE 0 IL C� P� FPR"" Ro Cus �o zo 6P �9s h �O PROPOSED SEPTIC -.DESIGN JOHN FTURINESE L"85 LOITGFELLO RD. IAT 14 YARI&OUTH, IHSS. aS177E, �s'El� MVGZtX7=1G 235 GREAT WESTERN ROAD 508- P. 0, BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 DATE OCT 24, 2003 fSCALE �,, 20, . JOB N0. , 5541-00 REVISED LOCATION MAP REVISED SHEET 1 OF 1 - - - - - - L:'j58�PROJj584l-00�1584>-SAS DWG 02003 SWEETSER ENGINEERINGI �... FILE CSP FILE 0 IL C�