Loading...
HomeMy WebLinkAbout33.277 - Site and Sewage PlanOCU5 TEST HOLE LOG DATE: 08-04-2005 TEST BY: M. OTOUGHUN, CSE WITNESS: B. MURPHY, HEALTH AGENT FERC72ATE: < 2 MINJIN. 7.7- 7.4 7.0 6.7 5.9 3.1 ORGANIC A = LOAMY SAND 1 OYR4/1 E = FINE SAND I OYRG/ I Bw = LOAMY 5AND I OYR4/G _ WATER FOUND _ C = MEDIUM SAND 2.5YG/4 -2.3 120" .BASED-UAO.+l TME-USG.5-F40RAL4.IJA, THE MAXIMUM GROUNDWATER P15E 15 1 .4' TO EL. 4.5 o" 3" r 12" 22" 55" TBM = EL. 10.0 -- rTF75T-FLOOR or EXISTING DWELLING IDT -3J 8. 172 12.4 S.F. NOTE: SEPTIC TANK G PUMP CHAMBER TO BE WATERPROOFED AT THE FACTORY U51NO IPANEX® ADMIXTURE 24"4 ASTJRON fIR5TfLOOK FRAME a COVER @ EL. 10.0 TO GRADE r-4" SCH 40 PVC PIPE --.TO T.O.F. EL 9.2-/ CPAWL5PACE fLOOP @ EL. G.O J�7.10 TCiTTLt TlS RIRRE IN OUTLET TGE BOTTOM OF TANK Cal EL.. `G' LAYER OF 1 500 GALLON SEPTIC TANK DESIGN DATA DAILY FLOW: (3) BEDROOMS x 100 GPD = 330 GPD SEPTIC TANK: 330 GPD x 200% = GGO GPD USE: 1 500 GALLON PRECAST SEPTIC TANK PUMP CHAMBER: 175f: 7000 GAU-101N1 t"Kt A T'5t"lC TANI\ DISTRIBUTION BOX: USE: DB- I I (I I OUTLETS) 9011 A55DBPTl0-N SYSTEM: USE: 20'x 24' LEACH FIELD (1 5 CULTEC FIELD DRAIN PANELS) CAPACITY: 20'x 24'x 0.74 = 355.2 GPD PUMP SPECIFICATIONS USE: MYERS 5RM4 PUMP (OR EQUAL) WITH V151BLE 4 AUDIBLE ALARM INSTALL 115V SINGLE PHASE ELECTRIC LINE TO PUMP INSTALL 115V SINGLE PHASE ELECTRIC LINE TO ALARM PANEL LfCTK1L71i P1 RNIiT REQUI RfD 7FKOVI TO" "Of YA?MOtr-r WIRING INSPECTOR ------------- _ _I I 1 _ 1 PAVED -DRJVZWAY a i 1 , 204.12' 7.7+ r 8.5+ PP.OF05ED ADDITION -- I 1 T.O.F. @ EL. 10.1 23' CP.ALVLSPAr-E 8 EL. 5-0ON 1 10' � 7.90 0 � 7.7 5.3 5 / J 205.77' $ 41 8 IN4 PUMP FLOAT ELEVATIONS PUMP OFF: EL. 2.50 PUMP ON: EL. 2.85 MGH WATER ALARM: EL. 3.35 2' 5CH 40 TEE X35 10.07-/ :i �9 S' LAYER OF STONE -vas NYfRp1L BOTTOM OF TANK D13-1 I EL. 1.85 D15TRIBUTJON 1000 GALLON BOX PUMP CHAMBER SEPTIC SYSTEM PROFILE 10.2 mrrr-TION PORT 20' 9.7 I r.1 S:G, -' i uit -I I JNSFECTIDN PORT (TYP.) POKT DRAIN PANELS SCH 40 PVC PIPE FINISH GRADE @ EL. 1 1. 1 a9• TOP @ EL. 10.2 CULTEC FfELD DRAIN PANELS BOTTOM @ EL. 9.5 9.75 1 1 I 5' 1 7 MAXIMUM GROUNDWATER @ EL. 4.5 LT-A-CrI TFELD -DETAIL 7+ 9.5+ w � SA s `m13 TG 6 ' �IST v�Ss!d1dA4���� a-4 --051 BUOYANCY CALCULATIONS 1 500 GALLON SEPTIC TANK: WATER DISPLACED: 2.55' 2:'5'5'x 10.5x-5.7 x 4;4 = 9767.5# WEIGHT OF TANK: 12950# 4,000 &ALLON P4)MP-C 4AM5ER: WATER DISPLACED: 2.G5' 2.G5'x8.5'x4.8'xG4 = G9f9.7# WEIGHT OF TANK: 9275# GENERAL NOTES I . CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ALl_ UTILITIES, ABOVE ORUNDLRG'ROUND, 7TlOR70 ANY EXCAVATION OR CONSTRUCTION. 2. SEPTIC SYSTEM TO BE INSTALLED IN COMPLIANCE WITH 310 CMR 1 S. -GO: TITLE V 3. TH15 PLAN 15 NOT TO BE USED FOR PROPERTY LINE DETERMINATION. 4. ALL DISTURBED AREAS TO BE LOAMED 4 SEEDED. 5. CONTRACTOR TO PROVIDE 48 HOUR NOTICE TO DE51GN ENGINEER FOR ANY REQUIRED INSPECTIONS. G. THI5 SEPTIC SYSTEM 15 NOT DESIGNED FOR THE USE OF A GARBAGE DISPOSAL. 7. EivtIIVE tNIPfRV10115�v1ATER1AtFOR A-5'-RAUltl5 ARb1J1,fl T11'E SOIL ABSORPTION SYSTEM ( DOWN TO "C" LAYER) AND REPLACE WITH CLEAN MEDIUM SAND. -DE5JGN-E=tZER.TOJN5PECT *.GERTJFYJN5TA LAT1DN DF TJ -if SEPTIC 5` 51 CNI 4- FIINHL hIKF1UINC�. Yarmouth Kea!th reRsrtmert SITE - SEWAGE PLAN FOR 3G MATTACHEE ROAD SOUTH YARMOUTH, MA PREPARED FOR PAUL BIANCHI SCALE: DATE: DRAWN BY: 1 " = 20' 10-24-2007 1 TMW JOB NUMBER: REVISION: SHEET NUMBER: 05-056 12-04-2007 5P- I WELLER � ASSOCIATES I G45 FALMOUTH RD., SUITE 4C -- P.O. BOX 417 CENTERVILLE, MA 02@32 2 V'P t)`rVAY. 7#232-'NA-MTUCKET, NIA 02554 TEL.: (508) 775-0735 -- FAX: (508) 775-0754 EMAIL: trl5weller@comca5t.net -FK -OPE55AGN ,L 4ENC-4 EERS 4 -LAND 5( RVfY0R5 Tfa P, PO FILE COP 1`