HomeMy WebLinkAbout114 Mayflower Terrace - Roof Framing Plan.. .�_. -. .. - . _ �....... .... r a o ..., .�,,: r- mro rfi - Lill +.3^'^ ;'.,^•'.v—+w+ .11"—All
i
JOIST AND Be
Plot ID Length Product
PI 36' 7" x 117/8" 2.01
I
I
I
i
i
NOTE FROM OPERATOR
LAYOUTS MUST BE APPROVED
BY BUILDER PRIOR TO ORDERING
MATERIAL. [�'/�f�
AR��■{Y\7 NAILING REQUIREMENTS
v 1 Joists are unstable unlit braced laterally _ TJI7 Joists at bearings: Two 8d (2Y") box nails (1 each side), 1 Y2"
Bracing Includes: minimum from end.
a?"" . sherrw
NOTE FROM OPERATOR
THIS LAYOUT AND THE ASSOCIATED
MATERIALS LIST HAVE BEEN PREPARED
BASED ON PROJECT PLANS AND/OR INFO.
PROVIDED TO DARTMOUTH BLDG. SUPPLY,
CO. IT REMAINS THE RESPONSIBILITY OF
THE ARCHITECT, DESIGNER OR OTHER
RESPONSIBLE PERSONS TO REVIEW THI5
INFORMATION TO ASSURE THAT IT IS
APPROPRIATE, ACCURATE & COMPLETE.
"'gem . Ru�eoaa Blocking panels, nm joist or rim board to beanng plate.
DO NOT allow workers . S O Chef • R'm k u DO NOT stack building TJl9 blocking panels or rim joist: 10d (3") box nails st 6" o.c.
to walk on Joists until materials on unsheathed Trus Joist rim board: Toenail with 10d (3") box nails at 6" o.c. or 16d
braced. WARNING N07'ES: Joists. (3 Yz7 box nails at 1T o.c.
Lack of proper bracing during constriction can result in serious accidents.Under Shear transfer.Connections equivalent to decking nail schedule.
normal conditions If the following guidelines are observed, accidents will be avoided: Rim tward, rim joist or closure to 7JI O joist:
1. Install all bbcking, rtangem, rim boards anddro joists at TJMIniist end supports 1 %" width or less: Two 1 Od (3") box nails, one each at top and
bottom flange.
2. Establish apenrnVenl deck (sneetbfngl, nailed to the fist 4 re'J'C-'teats at the end of"bay or traced end wall. TXS IProT 130, 350, 100C & 300C rim joist Two 16d (3%") box
3. safety et lit fines of ixa (rrinimum) must be nailed tp a braced end wan or sheathed area nails, one each at top and bottom flange.
TJY7 tPro- 550 & 400C rim jofst: Toenail joist to rim joist with one
4. Sheathing must to property naffed to each TJ'.0 st beforendMGonai toads can be pf.•mxf on the system. - - 10d (3") box nail each side of joist top flange.
S. Ends of canfiev" reWre strut lines on both the top ane bottom aa^+ges -
2x4 minimum squash blocks: Two 10d (3') box nails, one each at
- 6. TJImJWst lenges mist rem^Jn strcrig++! withfc .i'- from blip angntnert top ana nOttOm range.
i
NOTE FROM OPERATOR
LAYOUTS MUST BE APPROVED
BY BUILDER PRIOR TO ORDERING
MATERIAL. [�'/�f�
AR��■{Y\7 NAILING REQUIREMENTS
v 1 Joists are unstable unlit braced laterally _ TJI7 Joists at bearings: Two 8d (2Y") box nails (1 each side), 1 Y2"
Bracing Includes: minimum from end.
a?"" . sherrw
NOTE FROM OPERATOR
THIS LAYOUT AND THE ASSOCIATED
MATERIALS LIST HAVE BEEN PREPARED
BASED ON PROJECT PLANS AND/OR INFO.
PROVIDED TO DARTMOUTH BLDG. SUPPLY,
CO. IT REMAINS THE RESPONSIBILITY OF
THE ARCHITECT, DESIGNER OR OTHER
RESPONSIBLE PERSONS TO REVIEW THI5
INFORMATION TO ASSURE THAT IT IS
APPROPRIATE, ACCURATE & COMPLETE.
"'gem . Ru�eoaa Blocking panels, nm joist or rim board to beanng plate.
DO NOT allow workers . S O Chef • R'm k u DO NOT stack building TJl9 blocking panels or rim joist: 10d (3") box nails st 6" o.c.
to walk on Joists until materials on unsheathed Trus Joist rim board: Toenail with 10d (3") box nails at 6" o.c. or 16d
braced. WARNING N07'ES: Joists. (3 Yz7 box nails at 1T o.c.
Lack of proper bracing during constriction can result in serious accidents.Under Shear transfer.Connections equivalent to decking nail schedule.
normal conditions If the following guidelines are observed, accidents will be avoided: Rim tward, rim joist or closure to 7JI O joist:
1. Install all bbcking, rtangem, rim boards anddro joists at TJMIniist end supports 1 %" width or less: Two 1 Od (3") box nails, one each at top and
bottom flange.
2. Establish apenrnVenl deck (sneetbfngl, nailed to the fist 4 re'J'C-'teats at the end of"bay or traced end wall. TXS IProT 130, 350, 100C & 300C rim joist Two 16d (3%") box
3. safety et lit fines of ixa (rrinimum) must be nailed tp a braced end wan or sheathed area nails, one each at top and bottom flange.
TJY7 tPro- 550 & 400C rim jofst: Toenail joist to rim joist with one
4. Sheathing must to property naffed to each TJ'.0 st beforendMGonai toads can be pf.•mxf on the system. - - 10d (3") box nail each side of joist top flange.
S. Ends of canfiev" reWre strut lines on both the top ane bottom aa^+ges -
2x4 minimum squash blocks: Two 10d (3') box nails, one each at
- 6. TJImJWst lenges mist rem^Jn strcrig++! withfc .i'- from blip angntnert top ana nOttOm range.