HomeMy WebLinkAbout22 Michelles Path - Sewage Disposal Plant A.) NEITHER DRIVEWAYS NO PARKING AREAS ARE ALLOWED OVER SEPTIC SYSTEM
„ UNLESS H-20 COMPONENTS ARE USED.
B.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE 5Y5TEM AS DE51GNED UN-
"' LE55 CONSTRUCTED AS SHOWN.ANY CHANGES SHALL BE APPROVED IN WRITING.
CJ CONTRACTOR SHALL BE RE5PON518LE FOR VERIFYING THE LOCATION OF ALL
DEPTH FROM
501L SOIL 501L
501L OTHER
SURFACE
HORIZON TEXTURE COLOR
MOTTLING
(INCHE5)
(USDA) (MUN5ELL)
NONE
-
O/VA.Loamyn 5YR 412
NONE
•-24"
B Loamy Sand I OYR 4 G
NONE
"- 132*
C Medium to Coar5fi I
NONE'. ' Perc 6
P OR TO COMMENCEMENT OF WORK
UNDERGROUND AND OVERHEAD UTILITIES R)
72.39 - ;
a
_ TEST HOLE 2: EL=42.5± � , . �
DEPTH FROM
5UP,FACE
(INCHES)
501L 501L
HORIZON TEXTURE -
(USDA)
501L
COLOR
(MUN5ELL)
SOIL
MOTTLING
OTHER
Cr -G"
OJEIA` oa Sand
5YK 412,
NONE
5.1-24'
a and
1 6
NONE-
24"- 1 32s
C McJiurn to Coar5c
Grain 5an4 1 M 58
NONE