Loading...
33 Michelles Path - Proposed Septic DesignTOP OF FOUNDATION HORIZ 20 FT. MINIMUM FROM CELLAR COLOR MOTT. -� IOl'o 10 FT. MINIMUM 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE CLEAN SAND SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508— P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 ELEV cis.: J CONCRETE COVERS4' LOAM AND SEED SCHEDULE 40 PVC PIPE MIN. PITCH 1/8" PER FT. 2LAYER OF p p r 1/8' TO 1/2" WASHED STONE VENT 4" CAST IRON PIPE NOT REQUIRED ScR (OR EQUAL) MINIMUM PITCH 1/4" PER FT. 9 CU. FT. OF CONCRETE a ANCHOR FLOW UNE 9 2-0 ELEV. = -TMIN. 1 V _ ��� D oao o �O.li LEV0. EL 6" SU ply. = C�S.y 010 ELEV. �._. - ELEV. _ BAFFLE ELEV =; DISTRIBUTION LIQUID OUTLET _<. .,_ ELEV. BOX HIGH CAPACITY IN ANNATORS WITH l� DEPTH 4 FEET TEE(TO 14 INCHES BE PLACED ON FIRM BASE) TO BE WATER TESTED Y X fo TRENCH FORMATION 5 FEET 19 INCHES 1 5OO GALLON IF MORE THAN ONE OUTLET 6 FEET 7 FEET 24 INCHES 29 INCHES (TO BE PLACED ON FIRM BASE) SEPTIC TANK SOIL ABSORPTION U WELL ZONE 8 FEET 34 INCHES 3/4" TO 1 1/2" SYSTEM (SAS) INDEX WASHED STONE ADJUST SEWAGE DISPOSAL SYSTEM PROFILE USGS PROBABLE WATER TABLE ELEV. OBSERVED WATER TABLE ( / / ) FLEV. NOT TO SCALE BOTTOM OF TEST HOLE ELEV. 1-T� i SO vS � fl'd 9L� _ 5 T 160.00 7- SOIL�ST DATE OF SOIL TEST SOIL TEST DONE BY SWEETSER ENGINEERING WITNESSED BY H• Vo.J L?/✓E OBSERVATION HOLE 1 ELEv.= 171 OBSERVATION HOLE 2 ELEV.- PERCOLATION RATE Lam- MIN./INCH AT C i INCHES PERCOLATION RATE -- ' MIN./INCH DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 1 7 V 4,) r, SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508— P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 cis.: J f)VWATER ENCOUNTERED AT /Lo ELEV. LEGEND: EXISTING SPOT ELEVATION 00,.0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION 00. FINAL CONTOUR SOIL TEST LOCATION UTILITY POLE -� TOWN WATER —WSW CATCH BASIN T® j GAS UNE CLEAN OUT C� CESSPOOL C.P.0 ocv� DEPTH HORIZ TEXTURE COLOR MOTT. I OTHER SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508— P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 cis.: J /46) WATER ENCOUNTERED AT Zo ELEV. - G t. DESIGN CALCULATIONS 7 NUMBER OF BEDROOMS GARBAGE DISPOSAL UNIT NO TOTAL ESTIMATED FLOW 110 GjkL/BR./DAY X -:L- BR.) GAL/DAY REQUIRED SEPTIC )ANK CAPACITY A(L+GAL ACTUAL SIZE OF SEPTIC TANK 1500 GAL. SOIL CLASSIFICATION I DESIGN PERCOLATION RATE < 5 MIN./IN. EFFLUENT LOADING RATE _4.74 GAL/DAY/S.F. LEACHING AREA SQ. FT. LEV1�r3"/f(y: yEr ��=r?� 2 CHING CAPACITY (AREA X RATE) 33Z. GAL/DAY RESERVE LEACHING CAPACITY L GA -/DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN OF RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED 1N PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH OE[LRMiNAflk)N F—RCW .v-r`ROn'MA, ""-'.^, . ' E. U7- �S S�^w": ARE APPROXIMP.TE ONLY, EXCAVATION CONTRACTOR IS TO CALL 'D:G-SAFE" AT 1-E°9-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. C S. PARCEL IS IN FLOOD ZONE 9. LOT IS SHOWN ON ASSESSORS MAP AS PARCEL APPROVED: BOARD OF HEALTH PROJECT LOCATION //IjCIIE-<< SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508— P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660