Loading...
HomeMy WebLinkAbout130 Midpine Road - Sewage Disposal Plan 4TOP OF FOUNDATION EL. 68.5 FINISH GRADE EL. 67.0 64.26 1 64.00 1L BSMT.FLR. ELEV. 60.5 i \ i Aro to i ,. I / r BENCHMARK // \ s2? / HYD.SPIN / EL.70.4 I \ --/� •WATER SERVICE \ 27.00• o I 3a U I v� PAV7-. EL. 66.5 / I x PROPOSED 10.00 / I 4 BDFZ`v1.HSE. / I oo g \ U to O p #1 i \$ #2 LOT 110 70T43,500 SF. C.BASIN \ 0 13 ---- \ o \ o o \ GARAGE \ FINISH GRADE OVER SEPTIC TANK 66.4 _RISERS TO 6" OF FINISH GR SYSTEM PROFILE NOT TO SCALE FINISH GRADE OVER DISTRIBUTION BOX 66.2 OUTLET PIPE(S) LEVEL FOR 2'(MIN.1% SLOPE 1% 6"SUMP -'• 63.75 63.43 63.26 DISTRIBUTION BOX MINIMUM INSIDE DIMENSION 12" OUTLET INVERTS 2" BELOW INLET INVERT MINIMUM CONCRETE WALL THICKNESS 2" INSTALL ON COMPACTED LEVEL BASE GENERAL NOTES: 3" 6" 2. MIN. d dl _ O ,F. dl ♦ y0 13" MIN. 14" ul> 3. MIN. � O MUST BE NOTIFIED WHEN CONSTRUCTION IS \ 121.04' PVC OR CAST IRON TEES COMPLETE PRIOR TO BACKFILLING. r GAS BAFFLE ANY CHANGES IN THIS PLAN MUST BE APPROVED I6 148" W ' 1500 GALLON J s PRECAST CONCRETE MATERIALS AND INSTALLATION SHALL BE IN H-10 REINFORCED c [TITLE V] AND LOCAL APPLICABLE RULES AND o _ 6. NORTH ARROW IS FROM RECORD PLANS AND IS NOT INTENDED FOR SOLAR ENERGY PURPOSES. 7. WATER SUPPLY: MUNICIPAL WATER SYSTEM. 8. FLOOD ZONE C [NON -HAZARD] SEPTIC TANK THIS PROJECT DOES NOT INVOLVE ANY PHYSICAL INSTALL ON COMPACTED LEVEL BASE GROUND DISTURBANCE OR VEGETATION REMOVAL SYSTEM PROFILE NOT TO SCALE FINISH GRADE OVER DISTRIBUTION BOX 66.2 OUTLET PIPE(S) LEVEL FOR 2'(MIN.1% SLOPE 1% 6"SUMP -'• 63.75 63.43 63.26 DISTRIBUTION BOX MINIMUM INSIDE DIMENSION 12" OUTLET INVERTS 2" BELOW INLET INVERT MINIMUM CONCRETE WALL THICKNESS 2" INSTALL ON COMPACTED LEVEL BASE RISER TO 6" OF FINISH GRADE 1 REQ'D. 1 62.20 1 Tc FINISH GRADE REG ! tili_D - OVER TRENCHES 66.0 PRECAST CONCRETE 500 GALLON DRYWELLS H-10 REINFORCED LOADING TRENCH LENGTH = 33'-6" n I i EL.63.0 m 314" - 1-112' DOUBLE 314" -1-1f2" DOUBLE WASHED CRUSHED 8.4' WASHED CRUSHED 4 STONE STONE BOTTOM T.H.#2 EL. 51.8 TRENCH SECTION NOTE: EXCAVATE TO =C= STRATUM H ORDER TO REMOVE ALL =A= & =B= IMPERVIOUS MATERIAL WITHIN 5' OF THE SAS. REPLACE WITH CLEAN, 9" MIN.3" OF 118" -1/2" CLAY -FREE SAND 4" DIAM. 6" MAX. DOUBLE WASHED - PEASTONE GENERAL NOTES: <' 24.00' ELEVATIONS SHOWN ARE BASED ON ASSUMED 2. ALL PIPES IN THE SYSTEM MUST BE CAST IRON d dl _ O ,F. dl ♦ y0 OR SCHEDULE 40 PVC. ul> 3. HEALTH AGENT/CAPE & ISLANDS ENGINEERING � O MUST BE NOTIFIED WHEN CONSTRUCTION IS \ 121.04' COMPLETE PRIOR TO BACKFILLING. r C. BASIN ANY CHANGES IN THIS PLAN MUST BE APPROVED FIRESTONE DRIVE 148" PLOT PLAN erAl G- r, - in, RISER TO 6" OF FINISH GRADE 1 REQ'D. 1 62.20 1 Tc FINISH GRADE REG ! tili_D - OVER TRENCHES 66.0 PRECAST CONCRETE 500 GALLON DRYWELLS H-10 REINFORCED LOADING TRENCH LENGTH = 33'-6" n I i EL.63.0 m 314" - 1-112' DOUBLE 314" -1-1f2" DOUBLE WASHED CRUSHED 8.4' WASHED CRUSHED 4 STONE STONE BOTTOM T.H.#2 EL. 51.8 TRENCH SECTION NOTE: EXCAVATE TO =C= STRATUM H ORDER TO REMOVE ALL =A= & =B= IMPERVIOUS MATERIAL WITHIN 5' OF THE SAS. REPLACE WITH CLEAN, 9" MIN.3" OF 118" -1/2" CLAY -FREE SAND 4" DIAM. 6" MAX. DOUBLE WASHED - PEASTONE NUMBER OF TRENCHES 1 OBSERVATION PIT NUMBER OF DRYWELLS 3 l=' PE::COLATION RATE: < 2 MIN -11N WITNESSED BY: L.MULKEEN YARMOUTH BOARD OF HEALTH DATE: SEPT.28,2000 DESIGN DATA TEST HOLE # 1 EL.64.2 O,r TEST HOLE 92 EL.62.0 0" =0= 51r =A/E= LFS 8 10 YR 3/2 =B= LOAMY SAND 1GYR 5/6 42" 2.5YR 6/4 08' =C2= VERY FINE SAND 2.5YR 7/2 NO GRE>UNDWATER 32" =p= =A/E= LFS 10 YR 4r2 =B=LOAM;' SAND lOYR f /6 EL.60.7 =C1=FINE SAND =C1= FINE SAND 2.SYR 7l4 =C2= VERY'�INE SAND 2.SYF. 7/4 NO GROUNDWATER 4" 9" 45" 74" NUMBER OF BEDROOMS . 4 - GARBAGE DISPOSAL NO DAILY FLOW 440 GPD. SEPTIC TANK REQUIRED 1500 GAL. SEPTIC TANK PROVIDED 1500 GAL. LEACHING REQUIRED 440 GPD. EL58.2 SOIL ABSORPTION SYSTEM CALCULATIONS: SIDEWALL AREA = 186 SF. 186 SF. X.74 G/SF. = 137 GPD. BOTTOM AREA= 441 SF. 441 SF. X 0.74 G/SF. = 326 GPD. LEACHING PROVIDED =-463 GPD. EL.51.8 , EL.53.2 SINGLE FAMILY RESIDENCE OF ugsS'• PROPOSED SEWAGE DISPOSAL SYSTEM RICHARD oyN`, PREPARED FOR JAMES BERTRAND y ?9694 PADGETT BUILDERS LOT 110 MIDPINE ROAD YARMOUTH,MASS. a PLAN NO. 092502 SCALE: AS NOTED Of $qsf FILE NO. 393ABA DATE: SEPT.25,2002 DAVID 9Cyc ] SEPTIC FILE N0. 71 PCS FILE: MIDPINE CHARLESSANICKI - 2&k35 CAPE & ISLANDS ENGINEERING �EGISTERE� � 800 FALMOUTH ROAD, SUITE 301C U� MASHPEE,MA 02649 (508) 477-7272 GENERAL NOTES: 1. ELEVATIONS SHOWN ARE BASED ON ASSUMED 2. ALL PIPES IN THE SYSTEM MUST BE CAST IRON d dl _ O ,F. dl ♦ y0 OR SCHEDULE 40 PVC. 3. HEALTH AGENT/CAPE & ISLANDS ENGINEERING ` MUST BE NOTIFIED WHEN CONSTRUCTION IS 314" -1-112" DOUBLE COMPLETE PRIOR TO BACKFILLING. 4. ANY CHANGES IN THIS PLAN MUST BE APPROVED 48" w 5'-2" 148" BY CAPE & ISLANDS ENGINEERING AND THE BOARD STONE OF HEALTH. 5. MATERIALS AND INSTALLATION SHALL BE IN COMPLIANCE WITH THE STATE SANITARY CODE [TITLE V] AND LOCAL APPLICABLE RULES AND REGULATIONS. 6. NORTH ARROW IS FROM RECORD PLANS AND IS NOT INTENDED FOR SOLAR ENERGY PURPOSES. 7. WATER SUPPLY: MUNICIPAL WATER SYSTEM. 8. FLOOD ZONE C [NON -HAZARD] 9. THIS PROJECT DOES NOT INVOLVE ANY PHYSICAL GROUND DISTURBANCE OR VEGETATION REMOVAL WITHIN 100' OF WETLANDS,INLAND OR COASTAL BANKS OR FLOOD HAZARD ZONES. LEGEND - - 52 - PROPOSED CONTOUR _--52--- EXISTING CONTOUR ® OBSERVATION PIT z O ❑ DISTRIBUTION BOX W J a ui w o 0 o SEPTIC TANK ul SOIL ABSORPTION SYSTEM > o Co RESERVE RESERVE AREA K o Z Z 0 N F5 S 22 26 PIPE INVERT ELEVATION N W o O 0 0 112 8 110 MAP SEC PCL LOT HSE m � cr NUMBER OF TRENCHES 1 OBSERVATION PIT NUMBER OF DRYWELLS 3 l=' PE::COLATION RATE: < 2 MIN -11N WITNESSED BY: L.MULKEEN YARMOUTH BOARD OF HEALTH DATE: SEPT.28,2000 DESIGN DATA TEST HOLE # 1 EL.64.2 O,r TEST HOLE 92 EL.62.0 0" =0= 51r =A/E= LFS 8 10 YR 3/2 =B= LOAMY SAND 1GYR 5/6 42" 2.5YR 6/4 08' =C2= VERY FINE SAND 2.5YR 7/2 NO GRE>UNDWATER 32" =p= =A/E= LFS 10 YR 4r2 =B=LOAM;' SAND lOYR f /6 EL.60.7 =C1=FINE SAND =C1= FINE SAND 2.SYR 7l4 =C2= VERY'�INE SAND 2.SYF. 7/4 NO GROUNDWATER 4" 9" 45" 74" NUMBER OF BEDROOMS . 4 - GARBAGE DISPOSAL NO DAILY FLOW 440 GPD. SEPTIC TANK REQUIRED 1500 GAL. SEPTIC TANK PROVIDED 1500 GAL. LEACHING REQUIRED 440 GPD. EL58.2 SOIL ABSORPTION SYSTEM CALCULATIONS: SIDEWALL AREA = 186 SF. 186 SF. X.74 G/SF. = 137 GPD. BOTTOM AREA= 441 SF. 441 SF. X 0.74 G/SF. = 326 GPD. LEACHING PROVIDED =-463 GPD. EL.51.8 , EL.53.2 SINGLE FAMILY RESIDENCE OF ugsS'• PROPOSED SEWAGE DISPOSAL SYSTEM RICHARD oyN`, PREPARED FOR JAMES BERTRAND y ?9694 PADGETT BUILDERS LOT 110 MIDPINE ROAD YARMOUTH,MASS. a PLAN NO. 092502 SCALE: AS NOTED Of $qsf FILE NO. 393ABA DATE: SEPT.25,2002 DAVID 9Cyc ] SEPTIC FILE N0. 71 PCS FILE: MIDPINE CHARLESSANICKI - 2&k35 CAPE & ISLANDS ENGINEERING �EGISTERE� � 800 FALMOUTH ROAD, SUITE 301C U� MASHPEE,MA 02649 (508) 477-7272 d dl _ O ,F. dl ♦ y0 o ` � ��':• "'>; _, .., o o • 314" -1-112" DOUBLE WASHED CRUSHED 48" w 5'-2" 148" STONE NUMBER OF TRENCHES 1 OBSERVATION PIT NUMBER OF DRYWELLS 3 l=' PE::COLATION RATE: < 2 MIN -11N WITNESSED BY: L.MULKEEN YARMOUTH BOARD OF HEALTH DATE: SEPT.28,2000 DESIGN DATA TEST HOLE # 1 EL.64.2 O,r TEST HOLE 92 EL.62.0 0" =0= 51r =A/E= LFS 8 10 YR 3/2 =B= LOAMY SAND 1GYR 5/6 42" 2.5YR 6/4 08' =C2= VERY FINE SAND 2.5YR 7/2 NO GRE>UNDWATER 32" =p= =A/E= LFS 10 YR 4r2 =B=LOAM;' SAND lOYR f /6 EL.60.7 =C1=FINE SAND =C1= FINE SAND 2.SYR 7l4 =C2= VERY'�INE SAND 2.SYF. 7/4 NO GROUNDWATER 4" 9" 45" 74" NUMBER OF BEDROOMS . 4 - GARBAGE DISPOSAL NO DAILY FLOW 440 GPD. SEPTIC TANK REQUIRED 1500 GAL. SEPTIC TANK PROVIDED 1500 GAL. LEACHING REQUIRED 440 GPD. EL58.2 SOIL ABSORPTION SYSTEM CALCULATIONS: SIDEWALL AREA = 186 SF. 186 SF. X.74 G/SF. = 137 GPD. BOTTOM AREA= 441 SF. 441 SF. X 0.74 G/SF. = 326 GPD. LEACHING PROVIDED =-463 GPD. EL.51.8 , EL.53.2 SINGLE FAMILY RESIDENCE OF ugsS'• PROPOSED SEWAGE DISPOSAL SYSTEM RICHARD oyN`, PREPARED FOR JAMES BERTRAND y ?9694 PADGETT BUILDERS LOT 110 MIDPINE ROAD YARMOUTH,MASS. a PLAN NO. 092502 SCALE: AS NOTED Of $qsf FILE NO. 393ABA DATE: SEPT.25,2002 DAVID 9Cyc ] SEPTIC FILE N0. 71 PCS FILE: MIDPINE CHARLESSANICKI - 2&k35 CAPE & ISLANDS ENGINEERING �EGISTERE� � 800 FALMOUTH ROAD, SUITE 301C U� MASHPEE,MA 02649 (508) 477-7272