Loading...
HomeMy WebLinkAbout22 Merrymount Rd.NOVEMBER, 6 1999 SEPTIC TANK DETALL.°500 GALLON DISTRIBUTION 60X DETA(L. Nor To'sCALE _SOIL .TEST PIT DATA. .: LEACHING DETAIL. NOT ro SCALE 1 NOT TO SCALE NO. OF OUTLETS rJ 42t . T PIT TEST' PIT : TES !f2 ---�---- 5 IN TAN T LE D OUTLE TEES TO BE CAST IRON FlNISHED CR , I NOTES: L SEPTIC TANK SHALL BE STEEL I , GRD. EL. 99.8 GRD. EL. " 99.7 REINFORCED CONCRETE. SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE. TEES TO BE CENTERED UNDER MANH ^ GW. EL. N/A GW. EL. N/A 2. SEPT C TANK TO WITHSTAND H-10 LOADING E OLE COVER. REMOVABLE ��- 2 WALLS COVER NOTES: ' 0 0 O " LOAMY SAND 1OYR 3/4 UNLESS UNDER PAVEMENT, DRIVES OR I , 3 3 TRAVELED WAYS, WHEREIN H-20 LOADING , .. 1 DIST. BOX TO WITHSTAND H- A . LOAMY SAND 40YR 4/4 A HA PP v 9.. ,9. 9.. ,x. 4....,.,9.... 2 S D 10 LOADING ^ 1 9 : 1 11 SHALL LY, we e[rt UNLESS UNDER PAVEMENT DRIVES OR 4 PVC 3. ALL PIPE CONNECTIONS AND CONCRETE ',TRAVELED WAYS WHEREIN H 20 LOADING PIPE - FINE LOAMY SAND 10YR 5 8 � FINE'LOAMY SAND 10YR 5 6 CONSTRUCTION -SHA B WATERTIGHT. 2 / 2 /- LL E -» SHALL APPLY. 31 4 FILL ALL UNUSED KNOCKOUTS WITH � � 15 ` I 50" 12' I EL _, 97.2 _ 25 `2-24" DIAWFrtPGotZlzti�FMANHOLE COVERS EL — 97.6 MORTAR. e » 3 3 " _ 8 2. PROVIDE INLET TEE BAFFLE WHERE BROUGHT TU la dws ,Oi, iw✓S//faGR a0E fi 5,5 ,OUTLETS 45 T N 1 TEE 0 BE UNDER SLOPE OF PIP X r E EXCEEDS 0.08 _T,/FTOR ` " . _ v.. .. v 12 -MIfV.' PLAN MEW LEACHING .CHAMBERS M.H., OPENING o » , .-o « , , o . 1N PUMPED 4 4 , » J e J e J eJ. � UM ED SYSTEM. COVER 3 a'4Pa'� u°n'� a� e°a4 0 Y C C _ . 3. S TWOFEET OF PIPE OUT OF DISI . 5 60 5 RA15E M.H W 4 BOTTOM ON LEVEL //� _ . , �- LOAM & SEED DISTURBED AREAS 1 — BOX TO B� LAID LEVEL 0 6 SEWER BRICK .. . - n12" STABLE BASE 1 .MLN. RU TO M RTA 1 t 2 CRUSHED k 0 R , 67777777777 _ 4 " 6 A PP ' 1 LL E E CONNECTION 'AN N0 0CR TIN S DCO CRETEOSS SEC 0 7 A 3 MAX. .S ONE SEBC MPACTED FILL 36 'MAXIMUM 12 MINtM M NORMAL WATER LCONSTRUCTION SHALLI3E WATERTGH7. -. - .: ... =. ,:. : O O O' Opp O -O p O -.. 7 - 7 .J 3 10" ,, .. 14, .. , . ' PRECAST : PTI : SE C TANK ,. } ' INLET TEE .. 4 —9 FIN AN .SYR 6 J E SAND 2 7 FINE SAND 2.5YR 7 T 9 9 5 2 _ J _ 4 6 _ , -J 5 4 4 — MIN. r ea en+p pn 0 i - 15 2 , O(;As T E �:. �:. _ LIQUID .DEPTH - Q 1 1 - ,-. . c,�s can J 10 0 20 < ? , o 5 li EL 89.7 INDICATES J ' 126" :. .- _ - _ EL .89.3 �_ OBSERVED - GROUND WAT N G ER J 5. FILL ALL UNUSED KNOCKOUTS WITH MORTAR. 30 24" FF E EC..0 DEPTH 4 0 0 o 0 Coo 0 p 000 o p HIGH 000 O DENSITY POLYETHYLENE` 0fl 0 INFILTRATOR 3050 OO LEACHING O E 000 0 CHAMBER O ' DISPOSAL FACILITY ONLY. - 3 LAYER PEASTONE . MATERIALS SHALL CONFORM TO MASS. 0 CID `J p00 0 �}�j}}jjjj OO i OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL - 4. THERE ARE NO KNOWN PRIVATE WELLS " LOCATED WITHIN -150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF THE LEACHING FACILITY, 47 . ALL TOPSOIL SUBSOIL AND OTHER - IMPERVIOUS MATERIAL 6. REPLACE WITH CLEAN WASHED SAND 47;' CONFORMING TO THE FOLLOWING ' 3/4" - 1 1/2" WASHED STONE 50 1 REVISIONS NO. DATE DESCRIPTION GENERAL NOTES: .1. THIS -PLAN IS FOR,DES0N AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. - 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P-'TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL - 4. THERE ARE NO KNOWN PRIVATE WELLS " LOCATED WITHIN -150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF THE LEACHING FACILITY, B. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL SUBSOIL AND OTHER - IMPERVIOUS MATERIAL 6. REPLACE WITH CLEAN WASHED SAND OR OTHER CLEAN GRANULAR SOILS :c CONFORMING TO THE FOLLOWING ' SIEVE ANALYSIS:. 10% (MAX) BY WT. SHALL' PASS No. 50 SIEVE - <10 % OF No. 4 SIEVE SHALL PASS No.. 100 <5 % OF No. 4 SIEVE SHALL PASS No. 200 UNIFORMITY COEFFICIENT 0 No. 4 SIEVE </=6.0 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS.ARE APPROXIMATE.' THE CONTRACTOR SHALL BE RESPON-,N. SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTWTY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE. DIG -SAFE 'SHALL BE NOTIFIED PER , THE STATE OF. MASSACHUSETTS STATUTE CHAPTER 82,' SECTION 409 AT TEL' 1-888-344-7233.'THE ENGINEER DOES NOT GUARANTEE ; THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES` ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES" TAKEN FROM RECORD PLANS. THE , CONTRACTOR SHALL VERIFY SIZE, LOCATION AND INVERTS OF , UTILITIES ,AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 8. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FACILITY. F BSC 657 Route 28, (Unit 6) West Yarmouth, Massachusetts 02673 508 778 8919 '. PROJECT TITLE: SEWAGE'- DISPOSAL SYSTEM- DESIGN X22 MERRYMOUNT �RD. W. YARMOUTH MASSACHUSETTSUSA A' = MACDONALDD I u.o -..CIVIL a�C2 40134 I U 2 fov PREPARED FOR: Mr, MICHAEL' BLIGH 62 BELCHER CIRCLE ' MILTON, MA 02186 DATE: - 11/2/00 .. COMP: DESIGN: L.' MACDONALD CHECK: ' D.=CRISPIN' DRAWN: . K: HEALYA.'-MACDONALD' FIELD: D. GAZZOLO /, J. McCARTIN FILE :NO. 81.30—S .DWG DWG NO. 5246-01 SHEET 1 JOB NO. -4-8130.01