Loading...
HomeMy WebLinkAbout42 Mid-Tech Drive - Tight Tank SystemMID TEC DRIVE 30' BUFFER w w E/P EIP T- I LL— 1'-g" —�- 2'-1" V-0" MANHOLE FRAME AND LID WITH TYPE J='T" HANDLEBAR LOCK NEENAH FOUNDRY COMPANY R -1926-A HEAVY DUTY 295# (OR EQUALI SCALE 3/4"=1'0" ADDITIONAL NOTES 1. ELECTRICAL PERMIT REQUIRED FOR INSTALLATION OF THE FLOAT CONTROL AND ALARM SYSTEM. 2. WATER IS SUPPLIED FROM MAIN IN REAR OF BUILDING. 3. SEPARETE WATER METER REQUIRED FOR KITCHEN FLOW GREY WATER. 4. WATER READINGS TO BE TAKEN MONTHLY AND TIGHT TANK DUMPINGS, VOLUME AND DATES TO BE RECORDED.A YEARLY REPORT SHALL BE PREPARED AND SUBMITTED TO THE YARMOUTH BOARD OF HEALTH FOR THEIR APPROVAL. 5. ENGINEERING INSPECTION OF THE TIGHT TANK INSTALLATION IS REQUIRED. I 10'BUFFER EXISTING BUILDING METAL BLDG SLAB ON GRADE PROPOSED SIZE 88'X114'= 10032 SF 3000 ALLON #42 MID TECH DRIVE riGHT TANK 12' TAX MAP SHEET 64 PARCELS F50 & F51 O 11 4 O IO 40' 12' V–�- ---- 88'---- A 1500 GAL 41.0+/. SEPTIC TANK abA SEPTIC SYSTEM 1978 TITLE 5 16 PERSONS X 50 GPD/PERSON= 800 GPD REFERENCE TOWN OF YARMOUTH SEWAGE PERMIT NUMBER 87-311 INSTALLED DECEMBER 1987 SCALE 1"=20' 0 °oe T, 0" I 0 a O INVERT EL 39.5' INVERT EL 39' ELEV 339 4R !a i S 2% SLOPE OVER TIGHT TANK ELEV 41.3'+/- 1" TOP COARSE 2" BINDER COARSE 4" DENSE GRADED ELEV 39.T STONE _FLOAT #2_ 6" HARDENING 2'_9 FLOAT #1 4._7.. — — — — — ESTIMATED DESIGN FLOW: YEAR 1: 2'-6" Y TOTAL WATER USEAGE 25.000 GALLONS WASTE WATER 2,500 GALLONS '� - I ' -1 H, tH I YEAR 2, 6" BASE OF CRUSHED STONE TOTAL WATER USEAGE 60,000 GALLONS WASTE WATER 6,000 GALLONS VOLUME AT 47"=3291 GALLONS YEAR 3: TOTAL WATER USEAGE 120,000 GALLONS VOLUME AT .6X4'7"=2'9"=1974 GALLONS - WASTE WATER 12,000 GALLONS PRECAST 3000 GALLON DESIGN FLOW: TIGHT TANK 12000 GAL / 250 DAYS = 48 G/D 48 G/D X 200% = 96 G/D WITH H 20 LOADING DAYS TO FILL 1974 GALLONS / 96 = 20 DAYS FOUR WEEKS MINIMUM IN YEAR 3 O ILL Of TIGHT TANK SYSTEM SYSTEM DESIGNED TO STATE TITLE V AND TOWN OF YARMOUTH SEWAGE REGULATIONS PROPERTY OWNER: THOMAS RUHAN /NOTES: - TIGHT TANK PLAN 1- ALL PIPES SHALL BE SCHEDULE 40 PVC SEWER PIPE AND`µ�i SHALL BE SLOPED 1/4 INCH PER FOOT. FOR 2- FINISHED GRADE SHALL HAVE A MINIMUM SLOPE OF b ® of .02 FOOT PER FOOT OVER THE TIGHT TANK. `�`qlo NATHAN W WHIFFLE p 3 -THE INLET SANITARY"T" SHALL BE INSTALLED AS IF IT }��,° 11� 64CAPE S KITCHEN INC. WERE INSTALLED IN A GREASE TRAP. i^' !0 12- 4- THE ASHPHALT PAVING SHALL BE SAW CUT AND V, I #42 MID TEC DRIVE 1207 GPD SAS PATCHED AS SHOWN. � YARMOUTH INDUSTRIAL PARK GALLEY SYSTEM 5- THE TIGHT TANK SHALL BE SEALED AT THE POINT OF M ANUFACTURE. TEL 508-760-3544 6 GAOIO L ONSDVISUAL AND THE TANKhIS TO BE EMPTIED. S SHALL BE T 1974 ADD GREY WATER STORAGE TANK O f 8 7- A SECOND SET OF AUDIO AND VISUAL ALARMS SHALL BE �44'�� SET AT 3291 GALLONS AND THE PROCESS SHUT DOWN. FROM SAUCE PREPERATION 8 -THE ALARMS ARE TO BE FLOAT OPERATED AND PLACED BY IN THE BUILDING AT A CONVIENT LOCATION. WILLIAM LIEBERMAN RPE 9- ALL THOUGH THE TIGHT TANK SYSTEM HAS BEEN DESIGNED TO TITLE 5 REQUIREMENTS FOR SEWAGE, 235 TIMBER LANE MARSTONS MILLS MA THERE IS NO SEWAGE IN THE INFLUENT AND IT WILL ONLY CONTAIN GREY WATER AND SAUCE. ZIP 02648-2151 TEL 508-428-2592 DATE: JUNE17 1996