Loading...
HomeMy WebLinkAboutEngineered Plan - 2016N ACCESS COVERS MUST BE WI THIN 6' OF FINISH GRADE FIRST 2' TO BE LEVEL -7 INSPECTION PORT 9" MINIMUM. 3' MAXIMUM COVER LOCUS MAP 0 /0 20 40 INVERT EL E VA T I DNS : INVERT OUT SEPTIC TANK. 106.1 INVERT IN DIST. BOX: i INVERT OUT DIST. BOX: 102.8 CLEAN SAND BACKF I L L ��— /6 / 102.8 CHAMBER: //- ADJUSTED GROUND H-20 N/A AROUND AND 2" OVER CHAMBERS GAS 102.9T �� 102.72 -I- 40.4 SPOT ELEVATION -..---,,40 ....... EXISTING CONTOUR /D1.8 BAFFLE) 6 OUTLET 16 HIGH CAPACITY INFILTRATOR EXISTING D -BOX CHAMBERS IN BED FORMATION 1000 GAL H-20 SEPTIC TANK 6" CRUSHED STONE OR HIGH CAPACITY CHAMBER COMPACTED BASE PROFILE: TO SCALE `; _�, . •,�; I .;;,,.�t�,,._�f? NOT LOCUS MAP 0 /0 20 40 INVERT EL E VA T I DNS : INVERT OUT SEPTIC TANK. 106.1 INVERT IN DIST. BOX: 102.97 INVERT OUT DIST. BOX: 102.8 INVERT IN LEACH CHAMBER: 102.72 BOTTOM OF LEACH CHAMBER: 101.8 ADJUSTED GROUND WATER: N/A OBSERVED GROUND WATER: N/A BOTTOM OF TEST HOLE #l: 96.8 _101 _1� I LEGEND 0 CB CONCRETE BOUND —W WATER L I NE O HYDRANT G GAS L 1 NE OHW-- OVER HEAD WIRES i F LIGHT POST --E— UNDERGROUND ELECTRIC LINE —T— UNDERGROUND TELEPHONE LINE —CTV— UNDERGROUND CABLEVISION LINE -I- 40.4 SPOT ELEVATION -..---,,40 ....... EXISTING CONTOUR 40 PROPOSED CONTOUR DESIGN CRITERIA: DESIGN FLOW: 3 BEDROOMS AT 110 G. P. D. PER BEDROOM EQUALS 330 G.P.D. NO GARBAGE GRINDER SEPTIC TANK REQUIRED: 330 G.P.D. X 200% - 660 GAL. SEPTIC TANK PROVIDED: 1000 GAL. EXISTING SOIL ABSORPTION SYSTEM REQUIRED: DESIGN PERC RATE C 5 MI N/ I NCH SOIL TEXTURAL CLASS - I EFFLUENT LOADING RATE - 0.74 GPD/SF 330 GPD / 0.74 GPD/SF - 446 S.F. REQUIRED PROVIDED: 16 HIGH CAPACITY INFILTRATOR CHAMBERS. 100'x 4.73 SF/FT - 473 S.F. 473 S.F. x 0.74 - 350 GPD SOIL TEST PIT DA TA INDICATES �_ I NO I CA TES PERCOLATION = OBSERVED TEST GROUNDWATER TP #/ 0' HOR I ZON TEXTURE 5" - 30'- 46-- 120-' COLOR /06.8 l OYR 2/2 ---- 106.4 I OYR 414 ---- 104.3 DATE: JANUARY 7. 2016 TEST BY: STEPHEN HAAS WITNESSED BY: AMY VONHONE PERC RATE: C 2 MI NII NCH Yarmouth Health Dep:irtineint . r AP7ROVED anne Lf6__.;E Date GENERAL NO TES : I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL SYSTEM ONLY. 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS SET. SEE SITE PLAN. J. ALL CONSTRUCTION METHODS AND MA TER I AL S AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER . THAN 3 ' IN DEPTH SHALL BE CAPABLE OF W1 TH- STANDING H-20 WHEEL LOADS. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR APPROVED EQUAL. 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE OR APPROVED POLYETHYLENE. BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER TESTED FOR LEVEL WHEN THERE IS MORE THAN ONE OUTLET. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE". 1 -888 -DIG -SAFE. AND THE LOCAL WATER DEPT. FOR LOCATION OF UNDERGROUND UTILITIES. 8. EXISTING LEACH PIT TO BE PUMPED DRY AND BACKFILLED. 9. ALL UNSUITABLE MATERIAL (A & 8 HORIZONS) ENCOUNTERED BELOW THE INVERT OF THE LEACHING FACILITY TO BE REMOVED FOR A DISTANCE OF 5' AROUND AND REPLACED WITH SAND IN ACCORDANCE WITH TITLE 5. `AAA N0FMgi�� �J DEMAREST, JR. I, o No. 36859' V i {�,1G llMi�([/f�/ SEP T I C SYS TEM DESIGN 65 E l LEEN STREET. MAP 135. PARCEL 208 YARMOUTHPORT. MA. PREPARED FOR: DOROTHY )= I TZGI BBONS SCALE: l — 20 - FEBRUARY 1 9 . 2016 STEPHEN A. HAAS ENGINEERING, INC P.O. Box 16 South Denn i s MA 02660 ( 508 ) 362—al-32 JOB NO: 15-0731