Loading...
HomeMy WebLinkAbout2015 Sep 29 - Emails with DownCape Engineering . vonHone, Amy From: Daniel Gonsalves<dgonsalves@downcape.com> Sent: Tuesday, September 29, 2015 3:29 PM To: vonHone, Amy Subject: RE: 8 Widgeon Lane Yes the bottom of the crawlspace floor is above the top of the leaching facility. Thanks, Danny E. Gonsalves, EIT Engineer in Training Down Cape Enstineerins�, Inc. Tel:508-362-4541 Fax:508-362-9880 This Electronic Message contains information from the engineering firm of down cape engineering,inc., which may be privileged. The information is intended to be for the use of the addressee only. If you are not the addressee,note that any disclosure,copy,distribution or use of the contents of this message is prohibited. From: vonHone, Amy [mailto:AVonHone(c�yarmouth.ma.us] Sent: Tuesday, September 29, 2015 3:25 PM To: 'Daniel Gonsalves' Subject: 8 Widgeon Lane ', Dan- Is the crawl space floor above the breakout elevation of the leach facility? If not, it would be a setback variance. A. Amy L.von Hone, R.S., C.H.O. - Assistant Health Director Yarmouth Health Department , ` 1146 Route 28 ' South Yarmouth, MA 02664 ' (0)508-398-2231 X1241 (F) 508-760-3472 avonhoneCa�varmouth.ma.us ; � ; I 1