HomeMy WebLinkAbout2015 Sep 29 - Emails with DownCape Engineering .
vonHone, Amy
From: Daniel Gonsalves<dgonsalves@downcape.com>
Sent: Tuesday, September 29, 2015 3:29 PM
To: vonHone, Amy
Subject: RE: 8 Widgeon Lane
Yes the bottom of the crawlspace floor is above the top of the leaching facility.
Thanks,
Danny E. Gonsalves, EIT
Engineer in Training
Down Cape Enstineerins�, Inc.
Tel:508-362-4541
Fax:508-362-9880
This Electronic Message contains information
from the engineering firm of down cape engineering,inc.,
which may be privileged. The information is intended
to be for the use of the addressee only. If you are not
the addressee,note that any disclosure,copy,distribution
or use of the contents of this message is prohibited.
From: vonHone, Amy [mailto:AVonHone(c�yarmouth.ma.us]
Sent: Tuesday, September 29, 2015 3:25 PM
To: 'Daniel Gonsalves'
Subject: 8 Widgeon Lane ',
Dan-
Is the crawl space floor above the breakout elevation of the leach facility? If not, it would be a setback
variance.
A.
Amy L.von Hone, R.S., C.H.O.
- Assistant Health Director
Yarmouth Health Department ,
` 1146 Route 28 '
South Yarmouth, MA 02664 '
(0)508-398-2231 X1241
(F) 508-760-3472
avonhoneCa�varmouth.ma.us ;
�
;
I
1