Loading...
HomeMy WebLinkAbout5 Nanas Way - Foundation & Cross SectionsGENERAL NOTES 1. ALL DETAILS, SECTIONS AND NOTES SHOWN ARE TYPICAL AND SHALL APPLY TO SIMILAR 51TUATION5 UNLESS OTHERWISE NOTED, 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT SITE PRIOR TO COMMENCEMENT OF CONSTRUCTION. C Vented Typ.� �10 12 Ridge vent /9' FG Inoul. 2x10 ridge Asphalt roof shingles GAF shinglemate 1/2" CDX Ply 2x8 16" O.C. O O in i �10 12 Ridge vent /9' FG Inoul. 2x10 ridge Asphalt roof shingles GAF shinglemate 1/2" CDX Ply 2x8 16" O.C. CK055 SECTION SCALE: 1/4"=1'O" White cedar (extra's) Typar House Wrap 1/2" CDX PLY 2x416" O.0 31/2" FG Insul. 2x6 P.T. Sill with Sill Beal and 1/2" anchor bolts CCD 6-0" O.0 —\8" poured concrete foundation on 8"x16" continuous concrete footing pG 2x816 C 76, existing roof to remain x816" OC use metal connecters 2-1 3/4"x11 7/8" LVL both sides 10'-0" new construction I -I existing beyond /7 existing lowered it SII i i 5 GR055 5ECTION5 12'-0" 12'-0" 1/2" anchor bolts 1' from corners and 6' Lower top -------------- of wall 36" —�— 5'-4" 4X6 P05T I -- ====2x10161,OC=== ====2x1016"OC=== d — — — — Lowertop ID — — — — - — of wall 40" 3-2x10 31/2" lally on �- 2'6 x2'6 x12 — — — — — out; in new concrete footing bea m — — — — —pocket— � — — Proposed new foundation 1/2 rod at cold " steel re "see on Site bench mark �. joints Provide trench for top of wall" —I---for ti pipe ----------- ---7 m � l New 3" waist pipe, I join to new septic system at exterior of building JJ Lower - — top of wall 6" — — I I I New masonary curb, align with top of foundation 1/2" steel re L- — — — — III --Ii - rodatcold joints — W Demo top of will to 5" below exlstirg corcrc'e floor T / Lower III to of -- --------�L— —— — — — — JI Ili' I wa1112" -- -- ------ I� I IL:6 J -- f ROF05ED FOUNDATION PLAN II I I I IFII II cp N 1, O N 1/2" steel rod down 24" from top of wa I I M C) O O x816" OC i N N O N � 3/4" T&G Ply � i11iU1i 2x1016" OC 6" FG Insul• 00 O --------------------- -------------------- - 4" diameter steel col. 4" �\On 4" Poured 30"00"x12" Concrete on concrete footing ( all compact Gravel col's and footings) S z � CK055 SECTION SCALE: 1/4"=1'O" White cedar (extra's) Typar House Wrap 1/2" CDX PLY 2x416" O.0 31/2" FG Insul. 2x6 P.T. Sill with Sill Beal and 1/2" anchor bolts CCD 6-0" O.0 —\8" poured concrete foundation on 8"x16" continuous concrete footing pG 2x816 C 76, existing roof to remain x816" OC use metal connecters 2-1 3/4"x11 7/8" LVL both sides 10'-0" new construction I -I existing beyond /7 existing lowered it SII i i 5 GR055 5ECTION5 12'-0" 12'-0" 1/2" anchor bolts 1' from corners and 6' Lower top -------------- of wall 36" —�— 5'-4" 4X6 P05T I -- ====2x10161,OC=== ====2x1016"OC=== d — — — — Lowertop ID — — — — - — of wall 40" 3-2x10 31/2" lally on �- 2'6 x2'6 x12 — — — — — out; in new concrete footing bea m — — — — —pocket— � — — Proposed new foundation 1/2 rod at cold " steel re "see on Site bench mark �. joints Provide trench for top of wall" —I---for ti pipe ----------- ---7 m � l New 3" waist pipe, I join to new septic system at exterior of building JJ Lower - — top of wall 6" — — I I I New masonary curb, align with top of foundation 1/2" steel re L- — — — — III --Ii - rodatcold joints — W Demo top of will to 5" below exlstirg corcrc'e floor T / Lower III to of -- --------�L— —— — — — — JI Ili' I wa1112" -- -- ------ I� I IL:6 J -- f ROF05ED FOUNDATION PLAN II I I I IFII II cp N 1, O N 1/2" steel rod down 24" from top of wa I I M C) O O U i O � O N � � -- C! 421 i O � O O � � -- 00 O N O06 S z � L i -- 00 O