HomeMy WebLinkAbout2016 Tidewater Installer Cert
Re: Septic Repairs at 135 Rt. 28 Tidewater Motor Lodge 3/30/2016
To Whom it may concern,
This letter is to certify
that the repairs to the septic system at the above mentioned address, were done by Paul Martin of Cape Cod septic services. The repairs were done according to Engineer specifications
and state title 5 code requirements. Referenced plan is Titled Tidewater Motor Lodge Component Repair. Plan date is 2/4/2016.
Below please find listed repairs and deficiencies found
during work. Full repair descriptions and information can be found on above referenced plan.
System #6 Office
Add 90° Elbow onto existing vent pipe. All vents in place.
System #3
West
Replace existing tank with 3000Gal. H-20, 2 compartment 2000/1000 tank. Benchmark = 3.36. Old invert =2.97. New invert =2.81. Pipe is .16 lower. All piping has proper pitch.
System
#2 West
Replace existing tank with 1500Gal. H-20, 2 compartment 1000/500 tank. Benchmark =3.35. Old invert =2.79. New invert =2.93. Pipe is .14 lower.
Installed new H-20 DB-9 box.
Matched invert. All piping has proper pitch.
System #1 West
Patch existing D-box with hydraulic cement. Sinkholes around S.A.S. were previously repaired. No repair needed.
System #5
East
Cut and remove cast iron pipe and tee. Used 4 band steel fernco to connect new PVC pipe and inlet tee. Note that pitch was checked before pipe removal and was found to be pitched
the wrong way. Condition not corrected with new pipe. No complaints of blockages due to pitch.
System #4 East
Cemented steel cover to risor. Used hydraulic cement to patch 2 existing
D-boxes.
System #7 South
Replace existing D-box with new H-20 DB-9. Invert .12 tenths lower than initial. Speed leveler used to correct pitch. Inlet pipe is orangeburg. Used fernco
to connect PVC to orangeburg.
System #8 South
Replace existing D-box with new H-20 DB-9. Inverts matched. Lines exiting box did not have proper pitch. Speed levelers used to correct
pitch. Leaching lines are Sch. 20 PVC.
Re: Septic repairs at 135 Rt. 28 Tidewater Motor Lodge
System #9 South
Replace existing D-box with new H-20 DB-9. Inverts matched. Slight adjustment with speed levelers to
correct pitch. Leaching lines are Sch 20 PVC.
System #10 South
Replace existing D-box with new H-20 DB-9. Invert .04 tenths lower than initial. Lines leaving box were not properly
pitched. Speed levelers used to correct pitch. Leaching lines are Sch. 20 PVC.
System #11 South
Replace D-box with new H-20 DB-9. Invert ..06 tenths lower than initial. Lines leaving
box were not properly pitched. Speed levelers used to correct pitch. Leaching lines are Sch. 20 PVC.
System #12 South
Replace D-box with new H-20 DB-9. Invert .01 tenth lower than initial.
Lines leaving box were not properly pitched. Speed levelers used to correct pitch. Leaching lines are Sch. 20 PVC.
System #13 South
Replace D-box with new H-20 DB-9. Invert .09 tenths
lower than initial. Lines leaving box were not properly pitched. Speed levelers used to correct pitch. Leaching lines are Sch. 20 PVC.
All access covers brought to grade with steel
manhole covers.
Regards,