HomeMy WebLinkAbout2016 Tidewater Installer Cert Re: Septic Repairs at 135 Rt. 28 Tidewater Motor Lodge 3/30/2016 To Whom it may concern, This letter is to certify that the repairs to the septic system at the above mentioned address, were done by Paul Martin of Cape Cod septic services. The repairs were done according to Engineer specifications and state title 5 code requirements. Referenced plan is Titled Tidewater Motor Lodge Component Repair. Plan date is 2/4/2016. Below please find listed repairs and deficiencies found during work. Full repair descriptions and information can be found on above referenced plan. System #6 Office Add 90° Elbow onto existing vent pipe. All vents in place. System #3 West Replace existing tank with 3000Gal. H-20, 2 compartment 2000/1000 tank. Benchmark = 3.36. Old invert =2.97. New invert =2.81. Pipe is .16 lower. All piping has proper pitch. System #2 West Replace existing tank with 1500Gal. H-20, 2 compartment 1000/500 tank. Benchmark =3.35. Old invert =2.79. New invert =2.93. Pipe is .14 lower. Installed new H-20 DB-9 box. Matched invert. All piping has proper pitch. System #1 West Patch existing D-box with hydraulic cement. Sinkholes around S.A.S. were previously repaired. No repair needed. System #5 East Cut and remove cast iron pipe and tee. Used 4 band steel fernco to connect new PVC pipe and inlet tee. Note that pitch was checked before pipe removal and was found to be pitched the wrong way. Condition not corrected with new pipe. No complaints of blockages due to pitch. System #4 East Cemented steel cover to risor. Used hydraulic cement to patch 2 existing D-boxes. System #7 South Replace existing D-box with new H-20 DB-9. Invert .12 tenths lower than initial. Speed leveler used to correct pitch. Inlet pipe is orangeburg. Used fernco to connect PVC to orangeburg. System #8 South Replace existing D-box with new H-20 DB-9. Inverts matched. Lines exiting box did not have proper pitch. Speed levelers used to correct pitch. Leaching lines are Sch. 20 PVC. Re: Septic repairs at 135 Rt. 28 Tidewater Motor Lodge System #9 South Replace existing D-box with new H-20 DB-9. Inverts matched. Slight adjustment with speed levelers to correct pitch. Leaching lines are Sch 20 PVC. System #10 South Replace existing D-box with new H-20 DB-9. Invert .04 tenths lower than initial. Lines leaving box were not properly pitched. Speed levelers used to correct pitch. Leaching lines are Sch. 20 PVC. System #11 South Replace D-box with new H-20 DB-9. Invert ..06 tenths lower than initial. Lines leaving box were not properly pitched. Speed levelers used to correct pitch. Leaching lines are Sch. 20 PVC. System #12 South Replace D-box with new H-20 DB-9. Invert .01 tenth lower than initial. Lines leaving box were not properly pitched. Speed levelers used to correct pitch. Leaching lines are Sch. 20 PVC. System #13 South Replace D-box with new H-20 DB-9. Invert .09 tenths lower than initial. Lines leaving box were not properly pitched. Speed levelers used to correct pitch. Leaching lines are Sch. 20 PVC. All access covers brought to grade with steel manhole covers. Regards, Paul Martin