Loading...
HomeMy WebLinkAbout2 Nicole Ave Proposed Septic DesignO TOP OF FOUNDATION 20 FT. MINIMUM FROM CELLAR ELEV, m P7e 10 FT. MINIMUM 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE CON RCOVSA 40 SCHEDULE 40 PVC PIPE MIN. PITCH i/8• PER FT. ------------ Q 4° CAST IRON PIPE 1� (OR EQUAL) MINIMUM PITCH 1/4" PER FT. LOW LINE ELEV. d� 10• ELEV. T 13-7 6° sliEEv BAFFLE .. DISTRIBUTION CLEAN SAND LOAM AND SEED 20 LAYER OF /1+4v W 5TO I 1ED STONE U 9� ` N0TTREQUIRED ? 1 CU. FT. OF z CONCRETE 99•� a, ANCHOR 1. ° 10'ELEV. _ SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE 1 7 r --- ADJ;IST USGS PROBABLE WATER TABLE ELEV. _ OBSERVED WATER TABLE ( / / ) ELEV. _ BOTTOM OF TEST HOLE ELEV. _ SOIL TEST DATE OF SOIL TEST i/ala- 1999 SOIL TEST DONE BY SWEETSER ENGINEERING WITNESSED BY OBSERVATION HOLE 1 ELEV.- 96 3OBSERVATION HOLE 2 ELEV.- -7 G PERCOLATION RATE G� M1N./tNCH AT INCHES PERCOLATION RATE -4 7— MIN.ANCH /,d C lW-Krz0,.1 DEPTH LIQUIDOUTLET DEPTH TEXTURE COLOR "'"'" I OTHER a BOXy T HIGH CAPACITY INFILTRATORS HATH Loq.nY to 4 FEET 14 INCHES (TO BE PLACED ON FIRM BASE). TO BE WATER TESTED IN AN �' Z SCALE s`" = 2G DATE1j 5 5 FEET FEET 7 FEET INCHES 2 -24 INCHES 29 INCHES 7-2 15 00 GALLON IF MORE THAN ONE OUTLET (TO BE PLACED ON FIRM rI K 5V rb TRENCH FORMATION 8 FEET 34 INCHES REVISED SEPTIC TANK BASE) SOIL ABSORPTION j� (o 41 ZONE 3/4' 70 1 1/2' SYSTEM (SAS) INDEX WASHED STONE SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE 1 7 r --- ADJ;IST USGS PROBABLE WATER TABLE ELEV. _ OBSERVED WATER TABLE ( / / ) ELEV. _ BOTTOM OF TEST HOLE ELEV. _ SOIL TEST DATE OF SOIL TEST i/ala- 1999 SOIL TEST DONE BY SWEETSER ENGINEERING WITNESSED BY OBSERVATION HOLE 1 ELEV.- 96 3OBSERVATION HOLE 2 ELEV.- -7 G PERCOLATION RATE G� M1N./tNCH AT INCHES PERCOLATION RATE -4 7— MIN.ANCH /,d C lW-Krz0,.1 DEPTH HORIZ TEXTURE COLOR MOTT. I OTHER �} Loq.nY to SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 SCALE s`" = 2G DATE1j • C1'�'f"S 7-2 REVISED REVISED LOCATION MAP REVISED 0 folrn S� (o 41 Cv�'Fc1-� /b WATER ENCOUNTERED AT La . ELEV. s Cr 6 3 LEGEND: EXISTING SPOT ELEVATION 00„0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION 00.0 FINAL CONTOUR SOIL TEST LOCATION UTILITY POLE -0- TOWN WAFER —W IV CATCH BASIN \®% GAS LINE CLEAN OUT C CESSPOOL C.P.0 DEPTH HORIZ I TEXTURE COLOR MOTT. OTHER PROJECT LOCATION,J 1-o,LiM7 ! SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 SCALE s`" = 2G DATE1j 7-2 REVISED REVISED LOCATION MAP REVISED SHEET /OF / (O WATER ENCOUNTERED AT 1 2-2 r. ELEV = 7 0 DESIGN CALCULATIONS NUMBER OF BEDROOMS J GARBAGE DISPOSAL UNIT NO TOTAL ESTIMATED FLOW ( 110 GAL/BR./DAY X ! BR.) ii Q GAL/DAY REQUIRED SEPTIC TANK CAPACITY GAL ACTUAL SIZE OF SEPTIC TANK 1500 GAL, SOIL CLASSIFICATION DESIGN PERCOLATION RATE <S MIN -A EFFLUENT LEACHING ARE RATE 0.5 GAL/pAY/S.F. z3X% It( to 9v�L SQ. FT. CHIN CAPACITY (AREA X RATE) /��` Z GAL/DAY ''Yy-O A 0 7X RESERVE LEACHING CAPACITY 33'z Z GAL/DAY NOTES: 1. ALL WORKMANSHIP AND MATER F' nSFJAl �C�ONFORM TO D.E.P. TITLE 5 AND THE TOWN OF RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6' OF FINISHED GRADE 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION. FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL 'DIG -SAFE' AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. S. PARCEL IS IN FLOOD ZONE .y 9. LOT IS SHOWN ON ASSESSORS MAP AS PARCEL ✓ / APPROVED: BOARD OF HEALTH DATE / ArFNT Dtn 1�,, - 40 ek- `'kyr Q G4�N�•oO whc°�Y (9 CU S PROPOSED SDEPTIC DESIGN PROJECT LOCATION,J SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 SCALE s`" = 2G DATE1j JOB NO. y3?• O0 REVISED REVISED LOCATION MAP REVISED SHEET /OF /