HomeMy WebLinkAbout23 New Hampshire Ave - Site Plan 7MAXIMUM FEASIBLE COMPLIANCE APPROVALS REQUESTED:
1. VARY LEACH AREA TO PROPERTY LINE BY UP TO 6' (4' MIN. PROVIDED).
VARY LEACHING TO DWELLING BY 6'-2"(13'-10" PROVIDED).
VARY TANKS TO LOT LINE BY UP TO 4' (6' MIN. PROVIDED).
VARY TANK TO DWELLING BY 4' (6' PROVIDED).
310 CMR 15.211 (1).
2. NO RESERVE AREAS ARE PROVIDED. 310 CMR 15.248.
3. VARY LEACHING TO WETLAND BY UP TO 30' (70' MIN. PROVIDED).
LOCAL REG.
4. VARY 5' REMOVAL BY UP TO 3.5' WHERE NEEDED, AS SHOWN.
310CMR 15.255 (5)
5. REDUCE COVER OVER SEPTIC TANKS BY 3" (6" PROVIDED).
310CMR 15.228 (1) 5.77
NOTE: UNDERGROUND ELECTRIC LINES SERVE /
LOCUS AND HOUSE NO. 21. MARK BOTH SERVICES
PRIOR TO CONSTRUCTION, AS REROUTING OF 571
SERVICE MAY BE NEEDED.
\/5 80
EDGE
D 71
DIG SAFE --BOTH GAS AND UNDERGROUND ELECTRIC LINES NOT SHOWN.
LOT COVERAGE
1ST FLOOR (EXISTING FOOTPRINT)= 1565±S.F.
2ND FOOR (DECKS)- 80±S.F. w
6.03 PROPOSED TOTAL AREA- S.F. a
COVERAGE=1645/66
x
�S N /F z
ROBBINS-MARA
\-E='
-6.767.09�7SF
REMOVE OR CRUSH
EXISTING TANK // � 699 7.61
i SYSTEM B
/ REMOVE 5 FLOWDIFFUSORS
AND CLOGGED STONE
REPLACE WITH CLEAN
SAND
DRIVE
SCALED FLOOD ZOI
FLOOD ZONE V75
4' DEEP IMPERVIOUS
BARRIER** 90 L.F. OF
40 MIL POLYETHYLENE
(MILLER BREAKOUT**)
TOP BARRIER=TOP
UNIT=7.71,GRADE
ABOVE BARRIER -8.4 MIN.
** BARRIER IS STIFF
& OBTAINABLE FROM
MILLER ENVIRONMENTAL
508-697-3710.
N /F
ROBBINS-MARA
O�o�y,�ry0��000
``'aFP'; :.
.18
NOTES JOB NO. Y08-14
1. LOCUS IS A.M. 16, PARCEL 37. Morrison5.dwg
2. ELEVATIONS SHOWN ARE NGVD29 BASED UPON DISC AT BOAT RAMP=6.08 NGVD.
3. LOCUS IS IN FLOOD ZONE Al2 (EL12) & V15(EL13) ON FIRM DATED JULY 2, 1992.
4. ALL PIPES TO BE 4" SCH 40, AND PITCHED AT 1/8" PER FOOT. (UNLESS NOTED)
5. MUNICIPAL WATER IS AVAILABLE. LOTS WITHIN 100' ARE ON TOWN WATER.
6. COMPONENTS TO BE AASHTO H-10, UNLESS NOTED.
7. INLET TEE TO PROJECT DOWN 13", OUTLET TEE DOWN 14".
8. IF TWO OR MORE LINES, WATER TEST D -BOX FOR EQUAL FLOW
D -BOX EXIT PIPES TO BE LEVEL FOR FIRST TWO FEET.
9. DEPTH OF COMPONENTS NOT TO EXCEED 3', OR VENTING MUST BE PROVIDED.
COVERS: BUILD UP COVERS --2 ON D-BOXS, 1 ON EACH LEACH AREA.
10. STONE TO BE DOUBLE WASHED 3/4 TO 1 1/2" WITH 2" MIN. 1/8 TO 1/2" PEA STONE ON TOP.
11. IF UNSUITABLE SOILS, OR SOILS DIFFERING FROM THE SOIL LOG ARE FOUND,
CONTACT THE BOARD OF HEALTH, OR R.J. CADILLAC.
12. IF AN OVERDIG IS CALLED FOR BELOW, FILL MATERIAL FOR 5' AROUND AND UNDER LEACHING
IS TO BE CLEAN GRANULAR SAND MEETING SPECIFICATIONS OF 310 CMR 15.255(3).
13. PUMP AND FILL ANY EXISTING CESSPOOLS. REMOVE ANY CLOGGED SOIL, BLOCK, AND STONE IN
LEACH AREA, AND DISPOSE OF AS DIRECTED BY HEALTH AGENT.
NOT TO
'Oo
1y,5
SCALE
141
Invert 7.25 �j'
proposed I Level
4 Unitsom
99
z
<2'-00"/inch (C layer)
WALL LOCATION.
CONCRETE BOUND=7.02 NGVD29
ID
0 UTILITY POLE (IF SHOWN)
REMOVAL PRIOR TO PLACING STONE.
PROPOSED >
FENCE
(20' OFF END FENCE -DOWN 3")
CONC. BOUND
FND. & HELD
O�o�y,�ry0��000
``'aFP'; :.
.18
NOTES JOB NO. Y08-14
1. LOCUS IS A.M. 16, PARCEL 37. Morrison5.dwg
2. ELEVATIONS SHOWN ARE NGVD29 BASED UPON DISC AT BOAT RAMP=6.08 NGVD.
3. LOCUS IS IN FLOOD ZONE Al2 (EL12) & V15(EL13) ON FIRM DATED JULY 2, 1992.
4. ALL PIPES TO BE 4" SCH 40, AND PITCHED AT 1/8" PER FOOT. (UNLESS NOTED)
5. MUNICIPAL WATER IS AVAILABLE. LOTS WITHIN 100' ARE ON TOWN WATER.
6. COMPONENTS TO BE AASHTO H-10, UNLESS NOTED.
7. INLET TEE TO PROJECT DOWN 13", OUTLET TEE DOWN 14".
8. IF TWO OR MORE LINES, WATER TEST D -BOX FOR EQUAL FLOW
D -BOX EXIT PIPES TO BE LEVEL FOR FIRST TWO FEET.
9. DEPTH OF COMPONENTS NOT TO EXCEED 3', OR VENTING MUST BE PROVIDED.
COVERS: BUILD UP COVERS --2 ON D-BOXS, 1 ON EACH LEACH AREA.
10. STONE TO BE DOUBLE WASHED 3/4 TO 1 1/2" WITH 2" MIN. 1/8 TO 1/2" PEA STONE ON TOP.
11. IF UNSUITABLE SOILS, OR SOILS DIFFERING FROM THE SOIL LOG ARE FOUND,
CONTACT THE BOARD OF HEALTH, OR R.J. CADILLAC.
12. IF AN OVERDIG IS CALLED FOR BELOW, FILL MATERIAL FOR 5' AROUND AND UNDER LEACHING
IS TO BE CLEAN GRANULAR SAND MEETING SPECIFICATIONS OF 310 CMR 15.255(3).
13. PUMP AND FILL ANY EXISTING CESSPOOLS. REMOVE ANY CLOGGED SOIL, BLOCK, AND STONE IN
LEACH AREA, AND DISPOSE OF AS DIRECTED BY HEALTH AGENT.
NOT TO
'Oo
-W- WATER LINE LOCATION FROM ASBUILT
SCALE
dso
Invert 7.25 �j'
proposed I Level
4 Unitsom
99
s' -s"
<2'-00"/inch (C layer)
WALL LOCATION.
CONCRETE BOUND=7.02 NGVD29
ID
0 UTILITY POLE (IF SHOWN)
REMOVAL PRIOR TO PLACING STONE.
-G- GAS MARKINGS (NOT ALL SHOWN)
3. CALL R.J. CADILLAC FOR FINAL
(20' OFF END FENCE -DOWN 3")
INSPECTION.
- x - FENCE (IF SHOWN, NOT ALL SHOWN)
��
D
m
01
REV. 5/01/09 --MONITORING WELL GRAPH, WALL HEIGHTS
N
MONITOR WELL, BENCHMARKS.
SYSTEM A --UNIT
\ 7 C \Bay
LOCATION MAP
TEST HOLE 1
14. ALL CONSTRUCTION TO MEET TITLE 5 AND LOCAL REGULATIONS. DEPTH (inches) ELEV.(feet) NGVE
v
0
-W- WATER LINE LOCATION FROM ASBUILT
INSPECTION SCHEDULE BOTH SYSTEMS
BENCH MARK --TOP N.W. CORN.
Invert 7.25 �j'
proposed I Level
4 Unitsom
99
s' -s"
<2'-00"/inch (C layer)
WALL LOCATION.
CONCRETE BOUND=7.02 NGVD29
2. CALL R.J. CADILLAC TO INSPECT
0 UTILITY POLE (IF SHOWN)
REMOVAL PRIOR TO PLACING STONE.
-G- GAS MARKINGS (NOT ALL SHOWN)
3. CALL R.J. CADILLAC FOR FINAL
(20' OFF END FENCE -DOWN 3")
INSPECTION.
- x - FENCE (IF SHOWN, NOT ALL SHOWN)
GPD/SF]
0 TREE (IF SHOWN, NOT ALL SHOWN)
REV. 5/01/09 --MONITORING WELL GRAPH, WALL HEIGHTS
REV. 2/24/09 --REVISE TOP FOUNDATION, SEPTIC, LANDSCAPE WALLS,
MONITOR WELL, BENCHMARKS.
SYSTEM A --UNIT
25
.....
REV. 5/30/08 --BUOYANCY CALC'S, TANKS, INSPECTION SCHEDULE
REV. 5/29/08--C-4 UNITS
REV. 5/23/08 --PRESBY SYSTEM
Min.
=.�
-
Exist. Slab=7.4 prop. Top Block
Prop. To� crawl=7.4
.Pro
Fill Exist. ravel to EI. 7.4 Invert 5.15
CONC.
TEND.
BOUND Proposed
& HE1D REPLUMB
H-10
,...... . ro 76
H� 0.
Proposed
1500 Gal.
5.29 I Invert 7.90
Septic Tank
3 DEEP IMPERVIOUS I Proposed
G'� O BARRIER** 98 L.F. OF
\ T 1 40 MIL POLYETHYLENE I Bottom 3.3
,s
5.41 l' (MILLER BREAKOUT**
9� `C\/� r T ) Proposed
I ` OBARRIEF2=TOP
�
542 `v\ UNIT=7.71,GRADE I 6" Stone Or corn
ABOVE BARRIER=8.4 MIN. 1
7.32 ** BARRIER FF
& OBTAINABLE FROM
<� oe• MILLER ENVIRONMENTAL
/� / 508-697-3710. DESIGN DATA
Lim
SEWER & WATER WITHIN
10 FEET OF EACH OTHER.
PROPOSED 8' CONTOUR
FOLLOWS FACE WALL
(NOT SHOWN)
LEGEND
10 TH 1 TEST HOLE LOCATION, NUMBER
0
-W- WATER LINE LOCATION FROM ASBUILT
INSPECTION SCHEDULE BOTH SYSTEMS
9.5 x 7,3 EXIST. & PROP. ELEV. ('X' MARKS POINT)
Invert 7.25 �j'
proposed I Level
4 Unitsom
�6-` EXISTING CONTOUR
1. HAVE R.J. CADILLAC STAKE
<2'-00"/inch (C layer)
WALL LOCATION.
�8, PROP. CONTOUR (8' CONTOUR NOT SHOWN ON PROP. WALL)
2. CALL R.J. CADILLAC TO INSPECT
0 UTILITY POLE (IF SHOWN)
REMOVAL PRIOR TO PLACING STONE.
-G- GAS MARKINGS (NOT ALL SHOWN)
3. CALL R.J. CADILLAC FOR FINAL
23.5' X 12' X 3" DEEP SAND BED
INSPECTION.
- x - FENCE (IF SHOWN, NOT ALL SHOWN)
GPD/SF]
0 TREE (IF SHOWN, NOT ALL SHOWN)
REV. 5/01/09 --MONITORING WELL GRAPH, WALL HEIGHTS
REV. 2/24/09 --REVISE TOP FOUNDATION, SEPTIC, LANDSCAPE WALLS,
MONITOR WELL, BENCHMARKS.
REV. 9/02/08 --PROPOSED FOOTPRINT, LOT COVERAGE, OFFSETS & DRIVEWAY DIMENSIONS
REV. 7/15/08 --PROPOSED FOOTPRINT, LOT COVERAGE & OFFSETS
REV. 6/18/08--2 SEPTIC SYSTEMS & NEW OWNER
REV. 5/30/08 --BUOYANCY CALC'S, TANKS, INSPECTION SCHEDULE
REV. 5/29/08--C-4 UNITS
REV. 5/23/08 --PRESBY SYSTEM
DOUBLE SLEEVE WITHIN 10' OF
WATER SERVICE
BENCH MARK --TOP MAG. NAIL
SET IN PAVEMENT=5.27 NGVD29
(26.0' OFF JOG CORNER HOUSE ON RANGE UNE)
TEST HOLE DATE:
PERFORMED BY:
WITNESSED BY:
PERC RATE:
SOIL SURVEY(1993):
GEOLOGIC MAP(1986):
Invert 7.65
Use Gas Baffle
Proposed
7.71® Filter 8.55 min.
/ft Cloth 71
S=1/8 /ft 7�
---- L3„ 108"
Fill
A layer 10yr 37-3
sandy loam
B layer 10yr 5/8
loamy sand
C layer 2.5y 6/3
loamy sand
observed water
7.3
4.2
1.4
-1.7
0
August 20, 2003
23"
Ron Cadillac, Soil Evaluator
Invert 7.25 �j'
proposed I Level
4 Unitsom
Lynn McCartin, RS
27"
<2'-00"/inch (C layer)
; ;NI 1`' El. 2.0
< 0.6' 1 1.96=High Monitoring Well
Carver coarse sand
37"
Harwich outwash plain deposits
m t reading 2/09/09 (Full Moon)
2 CULTEC C-4 UNITS
02
23.5' X 12' X 3" DEEP SAND BED
a
(See Detail)
GPD/SF]
Invert 7.40 Use 10" Min. Cover
Proposed Over Leaching
7.71® Filter 8.55 min.
/ft Cloth 71
S=1/8 /ft 7�
---- L3„ 108"
Fill
A layer 10yr 37-3
sandy loam
B layer 10yr 5/8
loamy sand
C layer 2.5y 6/3
loamy sand
observed water
7.3
4.2
1.4
-1.7
BEDROOMS:
7.0
MONITORING
WELL
,-__'Invert 7.57
act Proposed
Invert 7.25 �j'
proposed I Level
4 Unitsom
FEBRUARY
9, 2009
FULL MOON
�-- 5'
; ;NI 1`' El. 2.0
< 0.6' 1 1.96=High Monitoring Well
[(23.5' X 12')]
r'y
SIDE LEACHING AREA:
m t reading 2/09/09 (Full Moon)
1
BEDROOMS:
2
GARBAGE GRINDER:
No
REQUIRED CAPACITY:
220 GPD
SEPTIC TANK:
1500 GAL.
BOTTOM LEACHING AREA:
282 SF
[(23.5' X 12')]
SIDE LEACHING AREA:
17.75 SF
[2(23.5 + 12) x 0.251
DESIGN CAPACITY:
221.8 GPD
[(282 SF + 17.75 sf) X .74
GPD/SF]
T-11 --Observed Water=11.4
1'7L __[]-EJ
LEACH AREA 8AM 12 4PM
USE 2 C-4 UNITS WITH 4' OF STONE ON SIDES AND
S-9" ON ENDS FOR A 23.5' X 12' X 3" DEEP LEACH
AREA, AS SHOWN. RUN PERFORATED PIPE DOWN CENTER
OF C-4 UNITS BETWEEN HUMPS. CAPE PIPE ENDS.
BRING STONE TO TOP OF C-4 UNITS & BETWEEN HUMPS
& COVER WITH FILTER CLOTH.
VARIABLE REMOVAL WITH BARRIER
DO ALL AROUND AND UNDER REMOVAL DOWN 37"t
TO LOAMY SAND, AS SHOWN. SEE DETAILS SHEET 2.
SITE PLAN
THIS PLAN IS A VALID COPY ONLY IF IT BEARS FOR Ad03 311J
AN ORIGINAL RED STAMP AND SIGNATURE. JAMES G. MORRISON
`jHOFIJ 5+ F1. S LOT 106, 23 & 25 NEW HAMPSHIRE AVE, W. YARMOUTH, MA
RO AL NOVEMBER 28, 2003 SCALE: 1"=20'
CADILLAC CADILLAC "
# 1060 'o # 35779
PD 2P
�FGlSTi:R�O ! 'CfS SAO Q-
�`SANI7AF\PN. q��SURJ'
WORK MUST CON TO T%VN RONALD J. CADILLAC, PLS, RS, P.C.
BYLAWS RE LAND SURVEYOR & REGISTERED SANITARIAN
vOFESSIONAL
P.O. BOX 258
YAn"PAWTH WATER DEfrt WEST YARMOUTH, MA 02673
HEALTH AGENT APPROVAL DATE
1 (508) 775-9700
2008 BY R.J. CADILLAC PAGE 1 OF 2