Loading...
HomeMy WebLinkAbout53 Neptune Lane Sewage Disposal System Repair DesignEL.- 17.5 PROFILE: NOT TO SCALE 1=c l I I I=E I I ter. SEPTIC - I/A TANK PUMP CHAMBER SALCOR UV DISINFECTION UNIT MODEL 3G (SUPPLIED BY FAST) SOIL TEST PIT DATA: FEBRUARY 23, 2006 TEST PIT -#1- TEST PIT #2 GRD. EL. 6.5 GRD. EL. 6.6 EST. HIGH GW. 2.5 EST. HIGH GW. 2.5 r------------------- A/E ; 12" HIGH GROUNDWATER COMPUTATION FILL 28" FILL BASED ON TIDAL GROUNDWATER A LOAMY SAND ; ELEVATION OF HIGH TIDE 2.5 10YR 4/4 " �26" B ; 36 ; PEAT LOAMY SAND I 10YR 3/6 ------------- 46" ; EL = 2.7 I INDICATES v_ TIDAL / HIGH ASSUMED 2mpi s " - GROUND WATER -� 59 -t- 60" -4'-:' 108" INDICATES 66" v_ OBSERVED C- 144„ _ GROUND WATER MED. COARSE EL = (5.4) SAND ``INDICATES Im tOYR 6/6 120" LMEDIUM SAND PERC. EL = (-3.5) TEST DATE: DATE: 2/23/06 2/23/06 INDICATES TEST BY. TEST BY- UNSUITABLE THE BSC GROUP, INC. THE BSC GROUP, INC. MATERIAL WITNESSED BY: WITNESSED BY: AMY VON HONE AMY VON HONE PERC. RATE: PERC. RATE: -MIN. INCH N/A MIN./ INCH SOIL EVALUATOR SOIL EVALUATOR M. DIBB M. DIBB ■� SOIL CLASS: SOIL CLASS: 1 1 L.T.A.R. L.T.A.R. 0.74 G.P.D./SQ.FT. 0.74 G.P.D./SQ.FT. WALL SECTION BOT 11.0 00000000 - TOP 10.3 00000000 00000000 5 2" CAP •_- • 8' BLOCK 48" BOT 6.3 8" 40 MIL 00 00000000 POLY. 0000000000 6" LINER 0000 00000 BOT. OF STONE ELEV 5.1 ADJ. G. WATER ELEV 2.5 NEW WIDTH 27.0' RIDGE 47.5 W-0" 35.0' 29.9 SECOND FLOOR 31.2 'n N 0 0 9'-0" FIRST FLOOR 21.2 >= PROP. F.G. 12.1 "A" FLOOD ZONE EL_ 0.0' NGVD (-5.4) PEAT o FINISHED INSIDE SLAB CON. 12.0 CONFIRM NATURAL GRADE AT CONST. 12.53 z 0 1= U a TOP LANDING 18.0 11.60 CONCRETE COVERS TO WITHIN EL= A d� 11.10 6" OF FINISHED GRADE. BASE BOT `' "FAST" SYSTEM 4" SLAB14.0 -:. AT SEP. TANK / IA ACCESS HATCH _ .. 1W CAV RM -MAW 4" INVERT AT PUMP CHAMBER R COVER -.... ,.... F.G. 111�1..00 F.G. 10.3 AT PUMP CHAMBER X�Y TOP LEVEI L _ J �uovAa.E ELECO AL JIRCMM 2W OF SOIL SHALL NOT BE USED. THE FILL SHALL 3 \ 4PVC \ $CEi 40 I INmrwnEH7 omfrc�ro _ vswort I E"UAM ?" p o _ 1=c l I I I=E I I ter. SEPTIC - I/A TANK PUMP CHAMBER SALCOR UV DISINFECTION UNIT MODEL 3G (SUPPLIED BY FAST) SOIL TEST PIT DATA: FEBRUARY 23, 2006 TEST PIT -#1- TEST PIT #2 GRD. EL. 6.5 GRD. EL. 6.6 EST. HIGH GW. 2.5 EST. HIGH GW. 2.5 r------------------- A/E ; 12" HIGH GROUNDWATER COMPUTATION FILL 28" FILL BASED ON TIDAL GROUNDWATER A LOAMY SAND ; ELEVATION OF HIGH TIDE 2.5 10YR 4/4 " �26" B ; 36 ; PEAT LOAMY SAND I 10YR 3/6 ------------- 46" ; EL = 2.7 I INDICATES v_ TIDAL / HIGH ASSUMED 2mpi s " - GROUND WATER -� 59 -t- 60" -4'-:' 108" INDICATES 66" v_ OBSERVED C- 144„ _ GROUND WATER MED. COARSE EL = (5.4) SAND ``INDICATES Im tOYR 6/6 120" LMEDIUM SAND PERC. EL = (-3.5) TEST DATE: DATE: 2/23/06 2/23/06 INDICATES TEST BY. TEST BY- UNSUITABLE THE BSC GROUP, INC. THE BSC GROUP, INC. MATERIAL WITNESSED BY: WITNESSED BY: AMY VON HONE AMY VON HONE PERC. RATE: PERC. RATE: -MIN. INCH N/A MIN./ INCH SOIL EVALUATOR SOIL EVALUATOR M. DIBB M. DIBB ■� SOIL CLASS: SOIL CLASS: 1 1 L.T.A.R. L.T.A.R. 0.74 G.P.D./SQ.FT. 0.74 G.P.D./SQ.FT. WALL SECTION BOT 11.0 00000000 - TOP 10.3 00000000 00000000 5 2" CAP •_- • 8' BLOCK 48" BOT 6.3 8" 40 MIL 00 00000000 POLY. 0000000000 6" LINER 0000 00000 BOT. OF STONE ELEV 5.1 ADJ. G. WATER ELEV 2.5 NEW WIDTH 27.0' RIDGE 47.5 W-0" 35.0' 29.9 SECOND FLOOR 31.2 'n N 0 0 9'-0" FIRST FLOOR 21.2 >= PROP. F.G. 12.1 "A" FLOOD ZONE EL_ 0.0' NGVD (-5.4) PEAT o FINISHED INSIDE SLAB CON. 12.0 CONFIRM NATURAL GRADE AT CONST. 12.53 z 0 1= U a TOP LANDING 18.0 11.60 4" OP C 17.5 11.10 3 INVERT AT SEP. TANK / IA. F.G. 16.5 4" d AT SEP. TANK / IA F.G. 14.0 4" INVERT AT PUMP CHAMBER r 1 F.G. 111�1..00 F.G. 10.3 AT PUMP CHAMBER } � INVERTS AT LEVEI L _ J BOT. SAS 8.7 I OF SOIL SHALL NOT BE USED. THE FILL SHALL 3 10'MINZ•,�-..' SIEVE, SHALL BE PERFORMED ON A LINER BY WEIGHT OF THE FILL SAMPLE MAY BE RETAINED ON THE #4 SIEVE. SIEVE ANALYSES ALSO SHALL BE PERFORMED ON THE FRACTION I ANALYSES MUST DEMONSTRATE THAT THE FINISH GRADE =1 . �- PVC SCH 40 'RESSURE DOSE LEACHING FIELD TOP 10.3 H 12" STONE UNDER PIPING J 40 MIL POLY. LINER 8 6.2 SEPARATION K EST. HI H VARIANCES APPROVED: STREET TITLE 5: SECTION 15.211: (1) TO ALLOW LEACHING SYSTEM TO BE 6' OFF FRONT PROPERTY LINES IN LIEU OF 10'. TITLE 5: SECTION 15.255 (2) TO ALLOW THE TOE OF SLOPE TO BE 1' FROM PROPERTY LINES IN LIEU OF 5' TITLE 5: SECTION 15.211 (1) TO ALLOW THE SEPTIC AREA TO BE 13' FROM A DRAIN LINE IN LIEU OF 50. 40MIL POLY LINER AROUND SYSTEM N/F RAOUL CHALFOUX ASSESSORS MAP 24 PARCEL 168 WOODTIO PN 62 EEEV -GONG KEADWALE EXIST' RM SEWER 061E 0-E PIPE /ELi t 1 i CONC. WA=L FLOOR PLANS: NOTE: SEE ATTACHED ARCHITECTURAL PLANS FOUNDATIONS PLANS: TO BE DEIGNED BY OTHERS AS PROPOSED FOUNDATI N/FOOTING WALLS WILL BE IN THE FLOOD ZONE. BOTTOM 0� LOWEST FLOOR SLAB TO BE ABOVE THE FEMA BASE FLO D ELEVATION OF ELEVATION 12. DATUM: VERTICAL DATUM: N.G.V.D. 1929 BENCH MARK SET: HYDRANT TAG BOLT, ELEVATION 8.18 NGVD TOWN OF YARMOUTH: TO ALLOW LEACHING SYSTEM TO BE 75' OFF EDGE OF WETLANDS / SEA WALL IN LIEU OF 100'. INVERT ELEVATIONS: BASEMENT SLAB ELEVATION 11.60 4" INVERT AT BUILDING 11.10 4" INVERT AT SEP. TANK / IA. (IN) 4" INVERT AT SEP. TANK / IA (OUT) 4" INVERT AT PUMP CHAMBER (IN) 4" INVERT AT PUMP CHAMBER (OUT) INVERTS AT LEACHING FACILITY: 1 1/2" INVERT AT BEGINNING OF SOIL SHALL NOT BE USED. THE FILL SHALL 12.53 A 11.60 B 11.35 C 11.10 D 10.92 E 10.67 F OF LEACHING FIELD 9.70 G 4 ACD BREAKOUT 10.2 1. TI4IS PLAN '., ,_ DESIGN ANC ELEVATION AT END DISPOSAL FfC ', ONLY. 2. ALL CONSTRUCTV' METHODS AND OF LEACHING FIELD 9.70 H ELEVATION AT BOTTOM 12" OF STONE 40 OR EQUAL. OF LEACHING FIELD 8.70 1 FEMA HIGH 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE TIDE LINE 2.5 K OBSERVED GROUNDWATER 1.0 MIXTURES AND LAYERS OF DIFFERENT CLASSES �t F KqS TO ALLOW LEACHING AREA T BE 13' FROM A MARK D. sc i DRAIN LINE IN LIEU OF 100'. ' CIVIIL If C AIGDA. V, 40MIL POLY LINER AROUND YSTEM No. 45W37 No.38039 ► P F'TP�.aV. ► DESIGN CRITERIA: EXISTING DESIGN FLOW 6 BEDROOMS AT110G.P.B./D 660 G.P.D. PROPOSED DESIGN FLOW EXISTING E XISTING LEACHING COMPONENTS 5 BEDROOMS AT110G.P.B./D 550 G.P.D. DWELLING ,1 UMPED AND REMOVED FROM EX15 Np'E Efl�E1J - ACCORDANCE WITH TITLE 5 ORP �A - 1 LP 1 ' -- REQUIRED SEPTIC 18' TDP 9.3550 X 200% - 1,100 GAL. }g79 15" RCP CONC. 111 x 6.2 SEPTIC TANK PROVIDED: _ SzAL. 9.4 WALL �1 D TOP - _ 10' L11 50'-_ 115.00' p, ` � � � ,1,� SIZE OF LEACHING FACILITY REQUIRED: S 7g'03'10" PFt04=N� „1 DESIGN PERC. RATE: is �.` 6 1 MIN./ INCH g.3 WAY 1 f♦ • 1 i.) LONG TERM APPL. RATE OJ4 G.P.D/S.F. Top 9.3 DRIVE X 6.2 o ,o f 550 GPD = 0.74 GPD/SF = 744 S.F. 13'!.1 SIZE OF LEACHING FACILITY PROVIDED: n � O �q .<� i • o USE 10' x 51' LEACHING FIELD _DLBOTTOM = 10' X 51' = 510 ISW 510 S.F x 0J4 GPD/SF = 377GPD 377GPD PROVIDED (68% ALLOW, PER I/A) G) ' T�iIRouGH ' °' 12 STONE UNDER PRESSURE PIPING \ \\ N F 153 ROOF MIKHAIL '4�N L: ., ��1 p PROPOSED 1500 GALLON LOCUS INFORMATION \ \ Ut YAKHKIND, TR 1j" 1 1 fj -_� I/A SEPTIC TANK CURRENT OWNER: NEPTUNE NOMINEE TRUST \ i i MAP 24 �` PROP. _ _ \ PARCEL 167 \ ' "UV" �1 i \ \\ \I 1\ TOP 0 0 1 ! (TOWN WATER) - r♦ 1 . - 1 PROPOSED 1,000 GAL. WALL. i O 1200 S.F. ,�. fl 1 PUMP CHAMBER TITLE REFERENCE: DEED BOOK 13395, PAGE 303 \ \ \ \ \ L 8.2 i PRO PROPOSED 51'x10' PLAN REFERENCE: PLAN BOOK 186, PAGE 33 PROPOSED \ ELEC tii , j L 1 . • LEACHING FIELD WITH DWELLING i \ 4y 12" STONE UNDERNEATH ASSESSORS MAP: 24 t SLAB PARCEL: 167 o ROPOSED WALL 6.2 PTOP ELEV 9.3 ZONING DISTRICT. R-25 \1 BOT ELEV 6.5 \ \ \ \ + � SETBACKS: FRONT 30' \ \ \ \ OOD HOUSE #53 c'! \�EXISTWG \\ \\ , s Ps DECK \ i \ IOpp5E0 -- - 4R wol_ ST AIRS � I t _73 i i 1 1'1 9 � ii li 1 1, li 1 -�� \ \ 1 11 w Iii \\ h, vvl1�l t1 � 1i \t I CpI til 1 ti 5.1' TO FAC OF WALL ! t PROPOSED 40mi1 POLY LINER SIDE 15' REAR 20' TOP ELEV 9.3 BOT ELEV 3.3 MINIMUM LOT SIZE: 25,000 S.F. AO.1 EXISTING LOT AREA: 8,207± S.F. �s OVERLAY DISTRICT: NONE NITROGEN SENSITIVE W 11 ZONE: NOT A ZONE II is 1 6.2 FEMA FLOOD ZONE DISTRICT: A-12, ELEVATION 12 PANEL #250015 0006 D 6.8 (r 111 N� PROP. LOT COVERAGE: 22.1% (1,812± S.F.) 11,5 6.5 �-' 1 I1 `` ! _ �� PROP STORIES: 2 (BASEMENT <3.5' EXPOSED) Oj, 6.5 7.2' 11 1 '��L�i PR6 $ ED DRIVE. _ T 1 BUILDING HEIGHT: 34.2' (RIDGE 47.2-A.G. 13.0') ` 6.5 / ' 1 BENCHMARK LOCUS PLAN: NO SCALE 6.1 TOP TAG BOLT "W 1 ELEV=8.18' NGVD w 28 / 1 VEWAY LLI g11UM1N00S DRI1 i F- z .� F- LjJ > 1 _--1 1 Ld l a PLAN VIEW 1 1 � w w z z z 3 SCALE: V= 10 FEET 1 1 N < w 3 � z a 1 t 1 w 1 I 0 5 10 20 FT. �� 1 1 , I FN 0. L.AJE J1 2. 4 ACD GENT=RAL 1. TI4IS PLAN '., ,_ DESIGN ANC CONS"tRUCiiON Cn THE SZwAr,. DISPOSAL FfC ', ONLY. 2. ALL CONSTRUCTV' METHODS AND MATERIALS SHALL CCNFORW TC ?A.`. D.E.P TITLE 5 AND LOCAL BO,%. ' OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL. 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL, SUBSOIL AND OTHER IMPERVIOUS MATERIAL. 6. REPLACE ALL EXCAVATED MATERIAL WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND DELETERIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT CLASSES OF SOIL SHALL NOT BE USED. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN TWO INCHES, A SIEVE ANALYSIS, USING A #4 SIEVE, SHALL BE PERFORMED ON A REPRESENTATIVE SAMPLE OF FILL. UP TO 45% BY WEIGHT OF THE FILL SAMPLE MAY BE RETAINED ON THE #4 SIEVE. SIEVE ANALYSES ALSO SHALL BE PERFORMED ON THE FRACTION OF FILL SAMPLE PASSING THE /4 SIEVE, SUCH ANALYSES MUST DEMONSTRATE THAT THE MATERIAL MEETS EACH OF THE FOLLOWING SPECIFICATIONS: 100% MUST PASS #4 SIEVE (4.75 mm EFFECTIVE PARTICLE SIZE) 10%-100% MUST PASS #50 SIEVE (0-30 mmS PA SIZE) 0%-20% MUSTSS #100 SIEVE (0.15 mm EFFECTIVE PARTICLE SIZE) 0%-57 MUST PASS #200 SIEVE (0.075 mm EFFECTIVE PARTICLE SIZE) 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL. 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS, THE CONTRACTOR SHALL VERIFY SIZE, LOCATION AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 8. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FACILITY. 9. EXITING INVERTS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 0. THE ENGINEER IS TO BE NOTIFIED OF ANY FIELD CHANGES THAT MAY BE REQUIRED. 3 C R 3 657 Main Street, (RT. 28) Unit 6 W. Yarmouth Massachusetts 02673 508 778 8919 PROJECT TITLE: DESIGN FOR SEWAGE DISPOSAL SYSTEM REPAIR #53 NEPTUNE LANE SOUTH YARMOUTH MASSACHUSETTS PREPARED FOR: MIKHAIL YAKHKIND, TRUSTEE NEPTUNE NOMINEE TRUST 2 THOMPSON STREET WAYLAND MA 01778 @BSC (508) 778-8919 DATE: APRIL 24, 2006 COMP./DESIGN: K. HEALY CHECK: M. DIBB DRAWN: K. HEALY FIELD: D. GAZZOLO / J. MCCARTIN FILE NO. 6172-SEP.DWG DWG NO. 4537-03 SHEET 1 OF 3 JOB NO. 4-6172.00 J1