Loading...
HomeMy WebLinkAbout53 Neptune Lane Sewage Disposal System Repair Design 2Ti " .� REVISIONS FLOOR PLANS: INVERT ELEVATIONS: NO. DATE DESCRIPTION 1. 5/9/06 B.O.H. EDITS EL.= 17.5 PROFILE: NOT TO SCALE NOTE: BASEMENT SLAB ELEVATION 12.53 A 2. 5/19/0 ADD I/A SEE ATTACHED ARCHITECTURAL PLANS 4" INVERT AT BUILDING ' 11.60 B `V 3 8/04/0 6 PRESSURE DOSE 70P 165 - CONCRETE COVERS TO WITHIN 4" INVERT AT SEP. TANK / IA. (IN) 11.35 C ARC -6. OF FINISHED GRADE_ 4 8 14 06 ADD WALLS EL=A "FAST" SYSTEM FOUNDATIONS PLANS: 4" INVERT AT SEP. TANK / IR (OUT) 11.10 D 60T ''W C o a SLAB 14.0 TPP 13.5 4" INVERT AT PUMP CHAMBER (IN) 10.92 E GENERAL NOTES: BASE ACCESS HATCH IIa FINISH GRADE TO BE DESIGNED BY OTHERS AS PROPOSED 1. THIS PLAN IS FOR DESIGN AND �"°"°" BOT 4" INVERT AT PUMP CHAMBER (OUT) 10.67 F CONSTRUCTION OF THE SEWAGE a Pv *�*at ^-o 2• Pic FOUNDATION FOOTING WALLS WILL BE IN THE FLOOD ZONE. DISPOSAL FACILITY ONLY. / INVERTS AT LEACHING FACILITY: 2. ALL CONSTRUCTION METHODS AND .'. 4k 1= ufuj r vnsr s f BOTTOM OF LOWEST FLOOR SLAB TO BE ABOVE THE FEMA MATERIALS SHALL CONFORM TO MASS. C� oR 2• PVC SCH 40 1 1/2" INVERT AT BEGINNING D.E.P TITLE 5 AND LOCAL BOARD 1=F M.4 TOP 10.3 BASE FLOOD ELEVATION OF ELEVATION 12. OF LEACHING FIELD 9.70 G OF HEALTH REGULATIONS. p 1=C 1=E PR R A HING FIELD H 3. ALL PIPES LOCATED UNDER PAVEMENT SEPTIC I/A TANK PUMP CHAMBER 12" STONE UNDER PIPING BREAKOUT 10.2 OR TRAVELED WAY SHALL BE SCHEDULE SALCOR UV DISINFECTION UNIT 1=G J 40 OR ARE N MODEL 3G (SUPPLED BY FASB 40 MIL ELEVATION AT END 9 70 H 4. THERE ARE NO KNOWN PRIVATE WELLS OF LEACHING FIELD LOCATED WITHIN 150 FT. OF THE ' POLY. BDT STREET ++ PROPOSED LEACHING FACILITY NOR LINER ELEVATION AT BOTTOM 12 OF STONE ANY KNOWN WELLS PROPOSED WITHIN CIL SOIL TEST PIT DATA: FEBRUARY 23, 2006 OF LEACHING FIELD 8.70 J WIT150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE FEMA HIGH ALL TOPSOIL, SUBSOIL AND OTHER 6.2 SEPARATION DATUM: TIDE LINE 2.5 K IMPERVIOUS MATERIAL. TEST PIT #1- TEST PIT #2 - L REPLACE ALL EXCAVATED MATERIAL WITH GRD, EL. s 5 GRD. EL. 6.6 I VERTICAL DATUM: N.G.V.D. 1929 OBSERVED GROUNDWATER 1,0 CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND DELETERIOUS SUBSTANCES. EST. HIGH GW. EST. ____ EST. HIGH GW. 2.5 EST. HIOH MIXTURES AND LAYERS OF DIFFERENT CLASSES BENCH MARK SET: HYDRANT TAG BOLT, ELEVA ON 8.18 NGVD OF SOIL SHALL NOT BE USED. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN A/E TWO INCHES. A SIEVE ANALYSIS, USING A #4 12" HIGH GROUNDWATER COMPUTATION SIEVE, SHALL BE PERFORMED ON A FILL „ FILL BASED ON TIDAL GROUNDWATER REPRESENTATIVE SAMPLE OF FILL. UP TO 45R ' 28 BY WEIGHT OF THE FILL SAMPLE MAY BE A NATION OF HIGH TIDE 2.s TOWN OF YARMOUTH: TO ALLOW LEACHING SYSTEM �0 BE 75' OFF EDGE RETAINED L THE iR4 SIEVE. SIEVE ANALYSES LOAMY SAND 126 ELE VARIANCES APPROVED. + ALSO SHALL BE PERFORMED ON THE FRACTION 10YR 4/4 J 36„ OF WETLANDS SEA WALL IN LIEU OF 100'. tH°Etu�� � OF LYSILL SAMPLE PASSING THE 14 SIEVE, SUCH B PEAT / t os i� ANALYSES MUST DEMONSTRATE THAT THE DIS G `•Y MATERIAL MEETS EACH OF THE FOLLOWING LOAMY SAND TO ALLOW LEACHING AREA TO BE 13' FROM A CRAIG A. SPECIFICATIONS: 10YR 3/6 : : I TITLE 5: SECTION 15.211: (1) TO ALLOW LEACHING SYSTEM TO BE 6' OFF DRAIN LINE IN LIEU OF 100. CIVIL FIELD m 10ox MUST PASS y4 SIEVE -------- 46" 46" No. 45037 N0.38039 (4.75 mm EFFECTIVE PARTICLE SIZE) EL = 2.7 I INDICATES FRONT PROPERTY LINES IN LIEU OF 10'. 40MIL POLY LINER AROUND SYSTEM ]]] tox . 00X MUST PASS p50 SIEVE TIDAL /HIGHy"P ♦ �51� (0.30 mm EFFECTIVE PARTICLE SIZE) GROUND WATER _ � 0x -20x MUST PASS X100 SIEVE ASSUMED 2mpi - 59" _ (0.15 mm EFFECTIVE PARTICLE SIZE) �- 60" 59" INDICATES TITLE 5: SECTION 15.255 (2) TO ALLOW THE TOE OF SLOPE TO BE 1' -Sz MUST PASS EFFE#20CTIVE SIEVE (0.075 mm EFFECTIVE PARTICLE SIZE) �_ OBSERVED 8/,� O` ` v ss" - FROM PROPERTY LINES IN LIEU OF 5' 7. EXISTING UTILITIES WHERE SHOWN C 144" GROUND WATER ���p�OL IN THE DRAWINGS ARE APPROXIMATE. MED. COARSE EL ) THE CONTRACTOR SHALL A RES ND SAND INDICATES COOKSIBLE FOR PROPERLY LOCATING AND 10YR SA 6/6 120" MEDIUM SAND PERC. TITLE 5: SECTION 15.211 (1) TO ALLOW THE SEPTIC AREA TO BE 13' FROM DESIGN CRITERIA: COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE UTILITY TEST A DRAIN LINE IN LIEU OF 50. AND THE APPLICABLE NING DATE: 40MIL POLY LINER AROUND SYSTEM EXISTING DESIGN FLOW COMPANY AND MAINTAINING THE DATE: 6 BEDROOMS AT 110 G.P.B./D 660 G.P.D. EXISTING UTILITY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER 2/23/06 2/23/06 INDICATES TEST BY: UNSUITABLE THE STATE of MR 82, S C11Os TEST BY: MATERIAL PROPOSED DESIGN FLOW THE BSC GROUP, INC. THE BSC GROUP, INC. STATUTE CHAPTER 82, SECTION 4os �'4( EXISTING LEACHING COMPONENTS 5 BEDROOMS AT 110G.P.6./D SSO G.P.D. EN TEL. DOES NOT GUARANTEE THE WITNESSED BY: WITNESSED BY: gas / - 11 ENGINEER DOES NOT GUARANTEE AMY VON HONE AMY VON HONE EXISTING TO BE PUMPED AND REMOVED FROM � THEIR ACCURACY OR THAT ALL RAOUL CFALFOUX DWELLING EXIP`- cEoiEN i ' n 1 SITE IN ACCORDANCE WITH TITLE 5 REnUIRED SEPTIC TANK: ARE SHOWN. LOCATIONS ANDUTILITIES AND SUBSURFACE �uCTUREs FERC. RATE: PERC. RATE: ASSESSORS MAP 24 _ +t\TYt MIN./INCH NZA MIN./INCH OR _ LP 1 550 X 200% 1,100 GAL. PARCEL 168 i � !`1 ELEVATIONS OF UNDERGROUND UTILITIES SOIL EVALUATOR SOIL EVALUATOR i ' j$+ Tpp 93 `1\ SEPTIC TANK PROVIDED: -500 pL' TAKEN FROM RECORD PLANS. THE M. DIBB M. DIBB WOOp i o� a?� ' i 199 15 RCP CONC. }X` 6, CONTRACTOR SHALL VERIFY SIZE, ' 1 LOCATION AND INVERTS OF UTILITIES SOIL CLASS: ELEVP WALL 10 1\` SIZE OF LEACHING FACILITY REQUIRED: AND STRUCTURES AS REQUIRED PRIOR SOIL CLASS: CH .1RENCN i TOp 9.4 _ _ _ TO THE START OF CONSTRUCTION. 1 �- NEAOWAL 4' WIDE LEA _ 50 00, ' 11`r Q DESIGN PERC:. RATE: « MIN./ INCH EX sic - E R 1993 " 11r, PROP Ltt B 1`I B. THIS SYSTEM IS NOT DESIGNED ER. Il L. T. A. R. L. T. A.R. w/sZpRN PIPE S 78.p3�10 ' �, LONG TERM APPL. RATE 0.74 G.P.D/S.F. THE USE OFA GARBAGE GRINDER. 0.74 G.P.D./SQ.FT. 4,74 G.P.D./SQ.FT. OUTVA1 L D�y`y. - A GARBAGE GRINDER IS NOT �� t ^7c 6 2 RECOMMENDED DUE TO RECOGNIZED TOP g s 9 3 ORNEWAY { 550 LIP r n•74 GPD/SF 744 S.F, ADVERSE IMPACTS TO THE LEACHING WALL SECTION - CDNC. WALL t�p{ .. FACILITY. { �' SIZE OF LEACHING FACILITY PROVIDED: 9, EXITING INVERTS ARE TO BE CHECKED BY s �G X1.0 �r� I {� 13' 1 [ THE CONTRACTOR PRIOR TO CONSTRUCTION. BOT - �t ( ` I. IIS, f USE 10' x 51' LEACHING FIELD 0. THE ENGINEER IS TO BE NOTIFIED OF 11.0 �I f \ �jr ALO w o 1 I BOTTOM = 10' X 51' = 510 TOP 10.3 �, 510 S.F X 0,74 GPD/SF = 377GPD ANY FIELD CHANGES THAT MAY BE / l i 1 \ �_ REQUIRED. 00000000 I ( \ - i - ,` { I•, . 00000000 ` 2' CAP \ 9rn #2 N 377GPD PROVIDED (68% ALLOW. PER I/A) 00000000 5, 8" BLOCK \� ' '<` -�' I \\ �- 12' STONE UNDER PRESSURE PIPING; �\ .,-( yp} \\ \\-\ i T s VENT 1 { ° B✓SlJP oROFUGH „ �► I { 1 I :p • 1 PROPOSED 1500 GALLON LOCUS INFORMATION 657 Main Street, (RT. 28) Unit 6 \\ \ \ \\ MIKHAIL GT �a�N- L I�1,..1 , ; •� I/A SEPTIC TANK CURRENT OWNER: NEPTUNE NOMINEE TRUST W. Yarmouth Massachusetts \ \ \ \ OMAP YAKHKIND, TR PROP. - I 102673 24 \ "U V" PARCEL 167 . I{ 1 I I • ' �3 PROPOSED 1,000 GAL. TITLE REFERENCE: DEED BOOK 13395, PAGE 303 508 778 8919 PUMP CHAMBER \ \ � I � 1 \\ \\ \\ \\ TOP 0 b 1 0 (TOWN WATER) ` II I { . - 1200 S.F. ' �' •- II { 1 WALL. 1 { 1 I I' PROPOSED 51'x10' PLAN REFERENCE: PLAN BOOK 1$6, PAGE 33 BOT \ \ \ 1 v PRO { { l { { - LEACHING FIELD WITH PROJECT TITLE: 6.3 \ \\ \ \\ \ L 8.2 (� PROPOSEDDWELLING PARCEL: {1 ; 12• STONE UNDERNEATH ASSESSORS MAP: 24 PARCEL: 167 8I- 1212± S.F. ,, { I I I .. _ °I DESIGN FOR 4O MIL _ \ \ \ \ \ A / = { PROPOSED WALL v 0000000000 T \ \ \ \, / SLAB 12.53 -I 1 I 6.2 TOP ELEV 9.3 ZONING DISTRICT: R-25 POLY. 0000000000 6 \ LINER °000000000 \ \\ \\1 ° �/ �1 a, .I ; I I {'' 1 BOT ELEV 6.5 SETBACKS: DENT 15'1 SEWAGE DISPOSAL coo - BOT. OF STONE ELEV 5.1 \\ \\ \\ \ \ - J >y { .. PROPOSED 40mil POLY LINER REAR 20' I a �� ADJ. G. WATER ELEV 2.5 \ \ \ \ OOD HOUSE #53 11 Y I , ` SYSTEM REPAIR \ \\ \ \ s Ps p, I I =t' 1 BOT ELEV 3.3 MINIMUM LOT SIZE: 25,000 S.F. NEW WIDTH 27.0' \ XISRNG \\ ) ' ': 2071 S.F. #53 \ 1 EXISTING LOT AREA: 8, 04 RIDGE 47.5 DECK \ OgtrO _ _ 10. 1 OVERLAY DISTRICT: NONE o' � I NEPTUNE LANE 1 1 \L 4 wpE 11 NITROGEN SENSITIVE L ZONE: NOT A ZONE II Sjp1Rs FEMA FLOOD SOUTH YARMOUTH !J \ 1 1 5.1' TO ia�s 6.2 t ZONE DISTRICT: A-12, ELEVATION 12 3y1 1 1 FAC OF WALL i �' ; PANEL #2500150006 Dr MASSACHUSETTS n \ 1 1 'r�•� � 6,8�-\- 111 � Ny � PROP. LOT COVERAGE: 22.17 (1,8121 S.F.) F 9'-0" 35.0' 29.9 ; \ 11 1 1 x PROP STORIES. 2 ENT • ,r� N • -��y� 1� 1 ��� 6 2 I (BASEMENT <3.5' EXPOSED) PREPARED FOR SECOND FLOOR 31.2 z 1 \ 1 _ -1 \\ 11 I N I H - o F i \ 1 ° 115 6.5 111 Imo- , ( BU LDI G HE G T: 34.2' (RIDGE 47.2 A,G. 13.0') MIKHAIL YAKHKIND, TRUSTEE ° v 1 \ i1 1 5 5 1 PR D DRIVE i 1 NEPTUNE NOMINEE TRUST !R 1 1 \ 1 1 P 8 OT 7.2' 1\ ,�V 6,8 , i 2 THOMPSON STREET x 9'-D" ' LOCUS PLAN: N❑ SCALE WAYLAND zr 7 \ 1 BENCHMARK rn \1 1 11 11 1 \ ° ' FIRST FLOOR 21.2 TOP TAG BOLT TOP LANDING 18.0 \ 1 6.5 ' 6.1 ELEV=8.18' NGVD 28 OT. FLO R 20.2 OP C . 17.5 Nc 3 W � • F.G. 16.5 / 0 1 1 I 11 1 i Si8'p3 7'-8" FINISHED F.G. 14. 1 1 \ \ 1 0 i g6 p0 LLI z F.G. 13.5 ✓ 1 H t 11ypU5 DRIVEWAY ,-. ~ i PROP. F.C. 12.1 INSIDE SLAB ELE . 12.53 F.G. 11.0 1 1 \ 1 \ 1 / 1 g1111M W "A" FLOOD ZONE EL 1 -� i F.G. 10.3 \I \ 1 1 1 1 Y Q j?OP CON. 12.0 - - CNO 1 I Z 3 I • I" "1P" LEVEL r \ 0 1 I N z � 1 �' W Z ------� ��o 1 l 11 PLAN VIEWI 1 W ZLLI EXISTING F.G. 6.0 L_- J BOT. SAS 8.7 I 43 Q Y Q \ \\ 11 �1` 111 1 11 Q Al CONFIRM NATURAL IL Ld Q IRA.DE AT CONST. 10'MIN - ��--� LINER \\ 1 t1 1 1 SCALE: 1' = 10 FEET 1 1 N Z QLLJ �� \i f �I 111 � ' 0,0' NGVf --- \ 1 l , (I 11 1 11 0 5 10 20 FT. 1 1 4101 1111 ' (_a.4) F'.I' .-.. . _ _. FILE COPS MA 01778 (BSC (508) 778-8919 DATE: APRIL 24, 2006 _A COMP. DESIGN: K. HEALY I CHECK: M. DIBB DRAWN: K. HEALY FIELD: D. GAZZOLO / J. McCARTIP FILE NO. 6172-SEP.DWG DWG NO. 4537-03 SHEET 1 OF 3 JOB NO. 4-6172.00